LEED AP BD+C · Get comfortable with the vocabulary.

Integrative Process

A collaborative, cross-discipline approach that starts in pre-design and analyzes how building systems interact-energy, water, site, materials-so teams find synergies and cost-effective solutions before design decisions harden.

Related: Design Charrette, Owner's Project Requirements (OPR), Basis of Design (BOD)
Design Charrette

An intensive, facilitated workshop held early in a project where owner, designers, engineers and stakeholders jointly explore goals, site options and system interactions, producing consensus direction before schematic design begins.

Related: Integrative Process, Owner's Project Requirements (OPR)
Owner's Project Requirements (OPR)

A written document prepared by the owner stating the building's intended use, occupancy, functional needs, performance targets and budget, forming the benchmark against which commissioning verifies the completed project.

Related: Basis of Design (BOD), Fundamental Commissioning
Basis of Design (BOD)

The designer's written record of assumptions, calculations, standards and system selections used to meet the owner's project requirements; it is compared with the OPR during commissioning.

Related: Owner's Project Requirements (OPR), Fundamental Commissioning
Life-Cycle Cost Analysis (LCCA)

A method that compares design alternatives by totaling initial cost plus operating, maintenance, replacement and utility costs over a defined study period, usually discounted to present value.

Related: Integrative Process, Energy Use Intensity (EUI)
High-Priority Site

A previously developed or infill parcel with existing infrastructure and proximity to transit, housing and services; developing it reduces sprawl, preserves open space and earns location-related credits.

Related: Brownfield, Access to Quality Transit
Access to Quality Transit

Transit service near a project that meets LEED's thresholds for distance to stops and frequency of service, showing that occupants have a practical alternative to driving alone.

Related: High-Priority Site, Bicycle Network
Bicycle Network

A continuous system of paths, lanes and low-speed streets linking the project to destinations; LEED rewards projects on such networks and those providing secure bicycle storage and shower facilities.

Related: Access to Quality Transit, High-Priority Site
Brownfield

Land previously used for industrial or commercial purposes that may be contaminated with hazardous substances; redeveloping it can earn credits when cleanup is documented and liability is addressed.

Related: Site Assessment, High-Priority Site
Prime Farmland

Land whose soil and climate suit producing food, feed or fiber; it is generally protected from development and is excluded from many LEED site credits.

Related: Site Assessment, High-Priority Site
Heat Island Effect

The warming of developed areas relative to surrounding countryside, caused by dark heat-absorbing surfaces and sparse vegetation; LEED reduces it with reflective roofing and paving, shade trees and open-grid paving.

Related: Site Assessment, Light Pollution
Light Pollution

Waste light that escapes upward or off-site, disrupting ecosystems and night-sky visibility; LEED limits it through fixture shielding, exterior light-level limits and the BUG (backlight, uplight, glare) rating system.

Related: Heat Island Effect
Site Assessment

A pre-design study of a site's topography, hydrology, soils, vegetation, climate, views, transportation and contamination that informs building siting and protection of natural features.

Related: Brownfield, Low-Impact Development (LID), Integrative Process
Low-Impact Development (LID)

A stormwater strategy that manages rain close to where it falls using infiltration, evapotranspiration, rain gardens, permeable paving and reuse, mimicking natural hydrology and reducing runoff and pollution.

Related: Site Assessment, Heat Island Effect
Native and Adaptive Plants

Plant species indigenous to the region or well suited to local climate and soils that thrive without supplemental irrigation or chemicals; using them cuts outdoor water demand and supports habitat.

Related: Low-Impact Development (LID), Indoor Water Use Reduction
Indoor Water Use Reduction

The percentage decrease in potable water used by fixtures, fittings and appliances compared with a calculated baseline of code or EPA flow rates, achieved with efficient products and nonpotable sources.

Related: Cooling Tower Water Use, Submetering
Cooling Tower Water Use

Water consumed by evaporative cooling towers for makeup and blowdown. LEED rewards designs that raise cycles of concentration and use treated nonpotable water to cut potable demand.

Related: Submetering, Indoor Water Use Reduction
Submetering

Installing separate meters for major water or energy end uses-such as irrigation, cooling towers, tenant spaces or process loads-so consumption can be tracked and anomalies detected during operation.

Related: Measurement and Verification (M&V), Cooling Tower Water Use
Fundamental Commissioning

The prerequisite process in which an independent commissioning authority verifies that energy and water systems are installed and perform according to the owner's project requirements and basis of design.

Related: Enhanced Commissioning, Owner's Project Requirements (OPR)
Enhanced Commissioning

A credit that extends commissioning past the prerequisite with design review, submittal review, a systems manual, training verification and a post-occupancy review within ten months of occupancy.

Related: Fundamental Commissioning, Measurement and Verification (M&V)
Energy Use Intensity (EUI)

A building's annual energy consumption per unit of floor area, usually expressed in kBtu per square foot per year; it allows comparison of performance across buildings and against targets.

Related: ENERGY STAR Portfolio Manager, Measurement and Verification (M&V)
ENERGY STAR Portfolio Manager

A free EPA web tool used to track energy and water use, benchmark a building against similar buildings, and generate the score and data that support LEED energy performance documentation.

Related: Energy Use Intensity (EUI), Measurement and Verification (M&V)
Measurement and Verification (M&V)

A plan and process, often following the IPMVP protocol, that tracks actual energy use after occupancy and compares it with predicted savings so operators can correct underperformance.

Related: Enhanced Commissioning, Submetering
Renewable Energy Certificates (RECs)

Tradable instruments representing the environmental attributes of one megawatt-hour of renewable electricity; purchasing certified RECs can offset a project's conventional energy use in LEED accounting.

Related: Energy Use Intensity (EUI)
Global Warming Potential (GWP)

A measure of how much heat a refrigerant traps in the atmosphere relative to carbon dioxide over a chosen period; LEED favors refrigerants with low GWP and no ozone-depleting potential.

Related: Whole-Building Life-Cycle Assessment (WBLCA)
Whole-Building Life-Cycle Assessment (WBLCA)

A quantified analysis of environmental impacts-such as embodied carbon, energy and water-associated with materials and processes across a building's entire life, used to compare design options.

Related: Environmental Product Declaration (EPD), Global Warming Potential (GWP)
Environmental Product Declaration (EPD)

A third-party verified report disclosing a product's life-cycle environmental impacts, such as global warming potential, based on standardized rules; it supports informed material selection.

Related: Whole-Building Life-Cycle Assessment (WBLCA), Recycled Content
Recycled Content

The portion of a material made from pre-consumer or post-consumer recovered waste, measured by weight and cost; using it diverts waste and reduces demand for virgin resources.

Related: Construction and Demolition Waste Management, Environmental Product Declaration (EPD)
Construction and Demolition Waste Management

Planning and tracking of debris generated during construction and demolition so materials are diverted to recycling or reuse rather than landfill, verified through waste hauler reports.

Related: Recycled Content, Regional Priority Credit
FSC Certification

A third-party forest certification verifying that wood products come from responsibly managed forests; LEED credits it as evidence of sustainable sourcing for building materials.

Related: Environmental Product Declaration (EPD), Recycled Content
Volatile Organic Compounds (VOCs)

Carbon-based chemicals that evaporate at room temperature from paints, adhesives, sealants, flooring and furnishings; LEED limits their content and requires source control to protect indoor air quality.

Related: ASHRAE 62.1, Thermal Comfort
ASHRAE 62.1

The industry standard for ventilation and acceptable indoor air quality that sets minimum outdoor air rates, exhaust requirements and system design criteria referenced by LEED's indoor air quality prerequisite.

Related: Thermal Comfort, Volatile Organic Compounds (VOCs)
Thermal Comfort

The condition of satisfaction with temperature, humidity, radiant conditions and air speed; LEED requires design to ASHRAE 55 and provides individual control and monitoring to maintain occupant comfort.

Related: ASHRAE 62.1, Daylighting
Daylighting

The controlled admission of natural light through windows, skylights or light shelves to cut electric lighting and improve occupant satisfaction; LEED credits simulated or measured daylight levels while limiting glare.

Related: Thermal Comfort
Innovation Credit

A LEED credit awarded for exceptional or pioneering performance beyond existing credit requirements, or for a strategy the rating system does not address, documented with a clear measurable outcome.

Related: Regional Priority Credit
Regional Priority Credit

A bonus credit available for achieving specific credits identified as environmentally important in the project's zip code, reflecting local priorities such as water scarcity or air quality.

Related: Innovation Credit
Civic Engagement

Involving the surrounding community in project decisions through meetings, notice and response to feedback, helping surface concerns early; it reflects LEED's attention to project surroundings and public outreach.

Related: Site Assessment, Innovation Credit