Mistake 1

Performs safe isolation by switching off the MCB and testing only between line and neutral, omitting line-to-earth, neutral-to-earth and line-to-line checks, and does not re-prove the voltage indicator on a known source after testing.

The candidate has memorised 'prove dead' as a phrase rather than the full HSG85/EAWR sequence and assumes the neutral is dead or that one test proves all conductors.

What to do instead

State and apply the full sequence: identify, isolate, lock off, prove the tester, test all conductor combinations (L-N, L-E, N-E, L-L where applicable), then re-prove the tester. Record the isolation point and tester check in the answer.

Mistake 2

Selects a protective device and cable size without applying correction factors for ambient temperature, grouping and thermal insulation, and does not check voltage drop at the actual circuit length.

The candidate treats the tabulated current-carrying capacity as the design current and skips the Ib ≤ In ≤ Iz ≤ It relationship and the mV/A/m calculation.

What to do instead

Show the design sequence: calculate Ib, select In, derive It = In/(Ca × Cg × Ci), then confirm Iz; calculate voltage drop using mV/A/m × Ib × L/1000 and compare with 3% for lighting and 5% for other circuits (or the applicable private-installation values).

Mistake 3

Applies a maximum Zs value from memory without checking the protective device curve, the earthing system, and whether the tabulated value needs adjustment for conductor operating temperature.

The candidate memorises a few Zs figures and forgets BS 7671 Tables 41.2–41.4, the 0.8 factor for 70°C thermoplastic conductors, and the TT requirement for RCD fault protection.

What to do instead

Identify TN-S, TN-C-S or TT first; use the device curve and the correct BS 7671 table or manufacturer's data; apply the 0.8 factor where required; for TT state RA × IΔn ≤ 50 V (for example 1667 Ω for a 30 mA RCD) and verify the RCD is the fault-protection device.

Mistake 4

Records insulation resistance as a single pass/fail figure without stating the test voltage, the minimum acceptable value, or that loads and sensitive equipment were disconnected before testing between all live conductors and earth.

The candidate confuses insulation resistance with continuity testing and copies a generic '>1 MΩ' answer without showing method, conditions or test sequence.

What to do instead

State: isolate and prove dead, disconnect loads/surge protection, test L-E, N-E and L-N at 500 V DC for a 230 V circuit, minimum 1 MΩ to BS 7671 Table 64, record actual readings and any departures, and confirm dead tests were completed before live tests.

Mistake 5

Completes a schedule of test results but omits the supply characteristics (Ze, prospective fault current, earthing system) and the extent and limitations of the inspection, then presents the certificate as complete.

The candidate treats the certificate as a tick-box form and does not understand that the supply details and agreed extent are essential validity conditions under BS 7671 Part 6.

What to do instead

Obtain and record Ze, PFC, earthing system and supply parameters before testing; agree and record the extent and limitations with the client; ensure the schedule, inspection schedule and test results are consistent and signed by the competent person.

Mistake 6

Swaps accessories or protective devices in sequence until the fault disappears instead of following a documented diagnostic plan using continuity, insulation resistance and functional tests.

Time pressure and a symptom-led approach lead the candidate to treat a blown fuse or tripped RCD as the cause rather than investigating the underlying fault.

What to do instead

Write a diagnostic sequence: gather history, confirm supply and isolation, test continuity and insulation resistance, half-split the circuit to localise the fault, verify with the appropriate instrument, replace only the confirmed faulty component, then retest and record readings.

Mistake 7

Treats periodic inspection and testing as the only maintenance activity and ignores condition monitoring such as thermal imaging, RCD trip-time trends and insulation-resistance trends, as well as manufacturer maintenance intervals.

The candidate conflates 'maintenance' with an EICR and does not consider asset criticality, duty cycles or BS 7671 Chapter 65 periodic inspection guidance.

What to do instead

Produce a maintenance plan with an asset register, criticality ranking, manufacturer intervals, condition-monitoring methods and review triggers; distinguish reactive, preventive and predictive maintenance and state how findings feed back into the plan.

Mistake 8

Produces a programme that lists tasks in sequence but ignores procurement lead times for switchgear, cable and distribution boards, and does not identify the critical path or resource clashes.

The candidate plans from the start date without procurement durations or labour availability and mistakes a bar chart for a resourced schedule.

What to do instead

Build a work breakdown structure, add procurement and delivery lead times, identify dependencies and the critical path, level labour and plant resources, include contingency and a risk register, and state how progress will be measured and reported.

Mistake 9

States that BS 7671 is a statutory legal requirement and that non-compliance is a criminal offence, or says Building Regulations Part P applies to all electrical work in England and Wales.

The candidate mixes the non-statutory British Standard with the Electricity at Work Regulations 1989, the Health and Safety at Work etc. Act 1974, Part P and CDM 2015 duties.

What to do instead

Separate the frameworks: BS 7671 is a non-statutory standard that may be used in evidence; EAWR 1989 is statutory; Part P applies to dwellings in England and Wales and only certain work is notifiable; CDM 2015 imposes construction design and management duties. Attribute each duty to the correct duty holder.

Mistake 10

Recommends solar PV or battery storage without calculating self-consumption, payback or annual yield, and without checking the DNO connection limit and export limitation.

The candidate focuses on the technology label and ignores the site load profile, tariff, G98/G99 connection requirements and the need to compare with demand-reduction measures first.

What to do instead

Calculate annual yield, self-consumption, payback and CO2 savings; check DNO approval under G98 or G99, export limitation and metering; compare with LED lighting, controls and power-factor correction before recommending generation or storage.