- Safe isolation procedure
- Identify circuit, isolate all live conductors, lock off and tag, prove voltage indicator on known source, test for dead at point of work, then re-prove indicator.
- GS38 voltage indicator
- Voltage detector to GS38 has fused leads, finger guards, limited exposed probe tips and is proved on a known live source before and after the dead test.
- 30 mA RCD protection
- BS 7671 requires 30 mA additional protection for socket outlets rated up to 32 A and for mobile equipment up to 32 A used outdoors.
- Waste duty of care
- Anyone producing electrical waste must segregate it, store it securely, transfer it only to authorised carriers and keep waste transfer notes for the required period.
- Design current Ib
- Ib is the current the circuit is expected to carry in normal service; it must not exceed the protective device rating In or the cable current-carrying capacity Iz.
- Voltage drop limits
- For public low-voltage supplies BS 7671 gives 3% for lighting and 5% for other circuits from the origin of the installation to the load.
- Earth fault loop impedance
- Zs is the loop impedance at the far end of a circuit; disconnection is achieved when Zs is low enough for the protective device to operate within the required time.
- Adiabatic equation
- The protective conductor must satisfy k²S² ≥ I²t, where k depends on conductor material and insulation, S is cross-sectional area, I is fault current and t is disconnection time.
- Insulation resistance test
- With supply isolated and sensitive equipment disconnected, apply 500 V DC between live conductors and earth; a healthy 230/400 V installation should read at least 1 MΩ.
- Ring final continuity test
- Measure end-to-end r1, rn and r2, then cross-connect the two legs; socket readings should be broadly equal, and a high reading indicates an open conductor or poor termination.
- RCD 5I test
- At five times rated residual current a 30 mA RCD should trip within 40 ms; the half-rated current test should not trip it.
- EICR purpose
- An Electrical Installation Condition Report records the condition of an existing installation, including inspection, test results, classifications C1, C2, C3 and FI, and overall assessment.
- Half-split fault finding
- Divide the circuit into sections and test at the midpoint; the result shows which half contains the fault, reducing the number of tests needed.
- N-E insulation fault
- A low insulation resistance between neutral and earth can cause RCD nuisance tripping; disconnect loads and test sections to locate the leakage path.
- Broken ring final
- A ring with a disconnected leg behaves as two radial circuits; sockets may have high loop impedance, overloaded cables and heat damage at terminals.
- Thermal imaging survey
- An infrared camera shows temperature differences under load; hot joints, overloaded conductors, unbalanced phases and failing components appear as abnormal hotspots.
- Polarization index
- For motor insulation, PI is the 10-minute insulation resistance divided by the 1-minute value; a value below about 2 may indicate moisture or contamination.
- Condition-based maintenance
- Maintenance triggered by measured condition such as temperature, insulation resistance or vibration rather than fixed time intervals, reducing unnecessary intervention and unexpected failure.
- CMMS asset register
- A computerised maintenance management system stores asset details, maintenance plans, work orders and history so that planned and reactive work can be scheduled and audited.
- Partial discharge
- Small electrical discharges within insulation that erode materials over time; they can be detected by acoustic, ultrasonic or electrical sensors before failure.
- Critical path
- The longest sequence of dependent activities through a project network; any delay on it delays completion unless the plan is changed.
- Earned value SPI
- Schedule performance index equals earned value divided by planned value; below 1 means the project is behind the planned schedule.
- Resource levelling
- Moving activities within their float to reduce peak resource demand, which may extend the project duration but avoids excessive labour or plant.
- Commissioning plan
- A document setting out inspection, testing, energisation, performance checks, responsibilities and acceptance criteria for systems before handover to the client.
- EAWR 1989
- The Electricity at Work Regulations require electrical systems to be constructed and maintained to prevent danger, and work on them by competent persons using safe systems.
- Part P notification
- In England and Wales, certain electrical work in dwellings is notifiable under Building Regulations Part P and must be certified through a competent person scheme or building control.
- CDM notification threshold
- A construction project is notifiable to HSE under CDM 2015 if it lasts more than 30 working days with more than 20 workers simultaneously, or exceeds 500 person-days.
- NEC early warning
- Under NEC contracts the project manager and contractor must give early warning of matters that could increase cost, delay completion or impair performance, and attend risk reduction meetings.
- LED efficacy
- LED efficacy is light output in lumens divided by electrical power in watts; higher lm/W gives lower energy use for the same illuminance.
- PV inverter efficiency
- Inverter efficiency is AC energy output divided by DC energy input; European or weighted efficiency better represents part-load operation than peak efficiency.
- EV charging RCD
- For Mode 3 EV charging BS 7671 requires 30 mA RCD protection; Type A may be used with 6 mA DC detection, otherwise Type B is needed.
- Heat pump COP
- Coefficient of performance is heat output divided by electrical input at a given condition; seasonal SCOP gives a more realistic annual efficiency.