NVQ L4 Electrician · Get comfortable with the vocabulary.

Safe isolation

Documented procedure for proving an installation or circuit dead: identify the supply, isolate, lock off and tag, prove the voltage indicator on a known source, test every conductor, then re-prove the indicator.

Related: Permit to work, Risk assessment and method statement (RAMS), Initial verification
Permit to work

Formal written authorisation allowing specified work on or near a hazardous system under stated precautions, issued by an authorised person, with checks before work starts and a handback on completion.

Related: Safe isolation, Risk assessment and method statement (RAMS)
Risk assessment and method statement (RAMS)

Two linked documents: the risk assessment identifies hazards, who may be harmed and the controls; the method statement describes the safe sequence of work, plant, PPE and emergency arrangements.

Related: Permit to work, COSHH assessment
COSHH assessment

Recorded assessment required by the Control of Substances Hazardous to Health Regulations of substances used or produced by the work, covering health effects, exposure routes, controls, monitoring and emergency action.

Related: Risk assessment and method statement (RAMS), WEEE
WEEE

Waste Electrical and Electronic Equipment Regulations require producers to fund take-back and recycling; electricians must keep waste cable, luminaires and electronics apart from general waste and use authorised carriers.

Related: COSHH assessment
Diversity

Allowance that only part of the connected load operates at any one time. Applied to maximum demand using BS 7671 guidance so supply capacity and protective devices are sized realistically, not for every load running together.

Related: Voltage drop, Discrimination
Voltage drop

Reduction in voltage along conductors caused by their impedance under load. BS 7671 limits it to 3 per cent for lighting and 5 per cent for other uses on public low-voltage supplies so equipment works correctly.

Related: Diversity
Main protective bonding conductor

Conductor connecting extraneous-conductive-parts such as metallic water and gas pipes or structural steel to the main earthing terminal, sized against the supply conductors using BS 7671 Table 54.8.

Related: Earth fault loop impedance, Residual current device (RCD)
Discrimination

Coordination of protective devices so the device nearest a fault clears it first while upstream devices stay closed, limiting the part of the installation affected by the outage.

Related: Prospective fault current, Residual current device (RCD)
Residual current device (RCD)

Device comparing line and neutral current that trips when imbalance exceeds its rated residual current, giving additional protection at 30 mA and fault protection where loop impedance is too high for overcurrent devices.

Related: Earth fault loop impedance, Main protective bonding conductor
Earth fault loop impedance (Zs)

Total impedance of the path taken by earth fault current: line conductor, protective conductor, supply earth and any parallel paths. Measured live to confirm disconnection times comply with BS 7671.

Related: Prospective fault current, R1+R2, Main protective bonding conductor
Prospective fault current

Highest current that would flow if a short circuit or earth fault occurred at a point. Measured or calculated to confirm devices can safely break it and equipment withstand ratings are not exceeded.

Related: Discrimination, Earth fault loop impedance (Zs)
Insulation resistance test

Dead test applying 500 V DC between live conductors and protective earth to show the insulation is sound; BS 7671 requires at least 1 megohm for the installation, with a lower test voltage for SELV and PELV.

Related: Initial verification, R1+R2
R1+R2

Combined resistance of a circuit's line conductor and protective conductor, measured at points around the circuit; added to the external loop impedance to give Zs and confirm the disconnection path.

Related: Earth fault loop impedance (Zs), Insulation resistance test
Initial verification

Inspection and testing of a new or altered installation before it is energised for use, confirming it matches the design and complies with BS 7671, followed by the appropriate certificate and schedules.

Related: Insulation resistance test, Electrical Installation Condition Report (EICR)
Electrical Installation Condition Report (EICR)

Report on the condition of an existing installation produced after periodic inspection and testing, listing observations coded C1, C2, C3 or FI and giving a date for the next inspection.

Related: Initial verification
Half-split technique

Logical fault-finding approach in which a circuit or system is divided into halves and tested to see which section holds the fault, repeating the division until the faulty item is located.

Related: Open circuit fault, Intermittent fault
Open circuit fault

Break in a conductor, terminal or component that stops current flowing. Symptoms include no supply at the point, infinite resistance readings, or equipment that fails when a connection is disturbed.

Related: Half-split technique, Intermittent fault
Earth fault

Unintended connection between a live conductor and earth or an exposed-conductive-part, causing fault current to flow so protective devices operate and touch voltage rises until disconnection.

Related: Half-split technique, Earth fault loop impedance (Zs)
Intermittent fault

Fault appearing only under particular conditions such as vibration, heat, moisture or load, which often passes routine tests; locating it needs monitoring, load cycling and checks on connections.

Related: Half-split technique, Thermography
Planned preventive maintenance

Scheduled maintenance at fixed intervals of time, operating hours or cycles, using manufacturer instructions, regulations and service history to reduce the chance of failure and keep equipment compliant.

Related: Condition-based monitoring, Failure modes and effects analysis (FMEA)
Thermography

Infrared survey of energised equipment that reveals abnormal heat from loose connections, overload or phase imbalance; findings are judged against ambient temperature and similar equipment under comparable load.

Related: Condition-based monitoring, Intermittent fault
Condition-based monitoring

Monitoring measurable parameters such as temperature, vibration and insulation resistance, then scheduling maintenance when readings or trends pass defined limits rather than at fixed calendar intervals.

Related: Planned preventive maintenance, Thermography, Failure modes and effects analysis (FMEA)
Failure modes and effects analysis (FMEA)

Team-based method listing how each part can fail, the effect on the system, and ratings for severity, likelihood and detection, producing a priority order for maintenance, spares and design improvement.

Related: Condition-based monitoring, Planned preventive maintenance
Gantt chart

Horizontal bar chart of activities against a calendar showing start and finish dates, durations, dependencies and progress, used to plan, communicate and track a work programme.

Related: Critical path
Critical path

The longest chain of dependent activities in a project network, which sets the shortest possible overall duration; delay to any activity on it delays completion unless the plan changes.

Related: Gantt chart
Bill of quantities

Priced schedule listing measured quantities of work, materials and labour for a project, used to obtain tenders, form the contract sum and value progress payments and variations.

Related: Contract variation
Contract variation

Formal instruction changing the scope, quantity, quality or timing of work from the contract documents; it must be authorised, recorded and valued to keep the account and programme under control.

Related: Bill of quantities, Retention
Retention

Percentage held back from interim payments, released in stages at practical completion and after the defects liability period, giving the client money to correct defects if the contractor does not return.

Related: Defects liability period, Contract variation
Defects liability period

Fixed period, commonly twelve months after practical completion, during which the contractor must return and put right notified defects at their own cost.

Related: Retention
Building Regulations Part P

Requirement in England and Wales that electrical work in dwellings and associated gardens is designed and installed safely, with certain work notifiable and self-certified by registered competent persons.

Related: Initial verification
Grid-tied solar PV inverter

Converts direct current from PV modules into grid-synchronised alternating current, tracks the array's maximum power point and must disconnect automatically when the grid supply is lost to prevent islanding.

Related: Battery energy storage system (BESS), Demand-side response
Battery energy storage system (BESS)

Rechargeable battery bank with inverter and controls storing electricity for peak shaving, load shifting or backup; installation raises fire, ventilation, earthing and grid-connection issues that must be designed and approved.

Related: Grid-tied solar PV inverter, Demand-side response
Electric vehicle charge point (EVSE)

Equipment delivering energy to an electric vehicle to BS EN 61851; a mode 3 a.c. charge point uses a dedicated supply and control pilot signal, with specific earthing and RCD requirements for charging.

Related: Residual current device (RCD), Demand-side response
Power factor

Ratio of real power in kilowatts to apparent power in kilovolt-amperes. A low value means higher current for the same useful output, increasing losses and charges; corrected with capacitors or active filters.

Related: Demand-side response
Demand-side response

Changing when a site uses electricity in response to tariffs or grid signals, for example delaying EV charging or discharging a battery at peak times, cutting cost and network strain.

Related: Battery energy storage system (BESS), Electric vehicle charge point (EVSE)