Bulging Rubble Retaining Wall in the Monsoon

Sri Lanka NVQ L3 Mason · Put your knowledge to work in context.

All case studies

Bulging Rubble Retaining Wall in the Monsoon

Your gang has built a 1.8 m high random rubble retaining wall in Kandy to hold back a cut terrace. The stones are rounded river boulders, the mortar is 1:6, and the wall has some batter and a 450 mm base. No through stones were placed and there are no weep holes. Clay soil was tipped straight in behind the wall and compacted with a jumper. Two weeks into the monsoon a vertical crack appears near mid-length and the face bulges about 40 mm. The client wants you to re-point the crack with rich mortar and paint the wall before the rains get worse. The terrace above carries a small shed and a footpath runs along the toe of the wall.

1. What is actually happening to this wall, and why is it not a surface defect?

Read the worked answer

The wall is being pushed over by water and it cannot resist it.

  • Clay backfill with no weep holes and no drainage means monsoon rain soaks the clay; saturated clay also loses shear strength and exerts far more pressure than dry soil, plus direct water pressure.
  • No through stones means the wall is really two thin skins of stone around a loose core. The two faces are not tied together, so the wall has very little resistance to overturning.
  • Rounded river boulders roll rather than interlock, and 1:6 mortar is weak; thick, poorly filled joints let water sit inside the wall itself.
  • The vertical crack plus a 40 mm bulge is the beginning of a structural failure at the section carrying the most pressure, not a cosmetic crack. The shed above and the footpath below both load the risk.

2. What do you do in the next hour, and what do you refuse to do?

Read the worked answer

Next hour

  1. Stop work at the wall and keep people, stock and vehicles off the terrace above and away from the toe of the wall; cordon with tape and a barricade.
  2. Remove or move back any stacked material or shed contents that are adding surcharge.
  3. Tell the client and your supervisor or the engineer the same day, in writing, describing the crack, the bulge and the drainage faults. This wall needs an engineer's assessment.
  4. If the wall could fall on the footpath, keep the path closed and, only under direction, relieve the backfill or shore the face from the front.

Refuse

  • Re-pointing the crack with rich mortar and painting the wall. That hides a movement that is still going on and puts the blame on the mason when it collapses. Cosmetic treatment of a structural failure is not a repair.

3. When the wall is rebuilt, what details would you insist on so that the same failure does not repeat?

Read the worked answer
  • Foundation: on firm ground, wider than the wall base, taken down below the ground level in front of the wall, stepped where the slope falls.
  • Stones: angular, flat-bedded stones laid on their natural bed, largest at the bottom; no rounded boulders in the face unless they are tied in with through stones.
  • Through or bond stones: full wall thickness, at roughly 1 m spacing both horizontally and vertically, so the two faces act as one wall.
  • Drainage: 50 to 75 mm weep holes through the wall at the lowest level, about 1 to 1.5 m apart, with granular or gravel drainage material behind the wall and a geotextile to stop clay washing into it.
  • Backfill: granular material placed in layers and compacted, not clay tipped in and jumped.
  • Mortar and workmanship: a 1:4 or 1:5 mix with joints fully filled, and curing of the mortar; maintain the batter and check it with a plumb board as the wall rises.
  • Record the details and the engineer's instructions so the next gang does not repeat the omission.