Sri Lanka NVQ L3 Mason study materials
Sri Lanka NVQ L3 Mason study resources

Sri Lanka NVQ L3 Mason cheat sheet

Sri Lanka NVQ L3 Mason · Keep the key ideas within reach.

Quick reference

Occupational Health, Safety and Environment on Masonry Sites

  • Minimum PPE for masonry work: hard hat, safety boots, high-visibility vest, eye protection when cutting, gloves for mortar work and a dust mask for dusty tasks.

  • Cutting concrete, block or stone with a dry power saw releases respirable crystalline silica; control it with wet suppression or on-tool extraction plus a suitable respirator.

  • Hearing protection is required from 85 dB(A) averaged over an eight-hour day; masonry cutters, grinders and mixers commonly exceed this level.

  • Wet cement and mortar are strongly alkaline (about pH 12-13) and cause dermatitis and chemical burns; wash skin immediately and wear gloves and long sleeves.

  • Scaffold working platform: top guardrail about 1.0 m high, mid rail about 0.5 m, plus toe boards and a fully boarded platform.

  • Ladder rule: set at 1 in 4 (about 75 degrees), tie it off, and extend it at least 1 m above the landing point.

  • Manual handling: keep the load close to the body, bend the knees, and use two or more persons for heavy stone or dense blocks.

  • Excavations deeper than 1.2 m need shoring or safe battering, and spoil or materials are kept at least 1 m back from the edge.

  • Cement and lime dust irritate eyes and airways; eyewash must be available on site and bags opened carefully in ventilated areas.

Quick reference

Worksite Preparation

  • Store cement bags on pallets at least 150 mm above the floor in a dry, ventilated store; keep stacks stable and low and issue oldest stock first.

  • Place sand and coarse aggregate on hard, drained surfaces in separate bays with dividing walls so the materials and sizes never mix.

  • Stack bricks and blocks on level ground to a stable height, commonly not more than about 1.8 m, clear of scaffold legs and traffic routes.

  • Locate the mixing platform and water point close to the work, on firm level ground, so mortar is not carried long distances.

  • Confirm the position of buried water, electricity and telephone services from drawings or the utility owner before digging, and hand-dig near marks.

  • Provide a firm, drained access route for deliveries and barrows; barrow ramps should not be steeper than about 1 in 12.

  • Cut a fall in the ground away from mixing areas so water drains off and does not pond under the mortar board.

  • Set out the site store, first aid point, toilet, waste skips and fire point, and keep walkways and escape routes clear at all times.

Quick reference

Setting Out and Levelling

  • 3:4:5 method: measure 3 units on one line and 4 on the other, then adjust until the diagonal reads 5 units; any multiple such as 6:8:10 gives a right angle.

  • Set corner pegs and profiles beyond the excavation line, offset from the wall face by a known dimension, and stretch string lines between them.

  • With a dumpy level, set up roughly equidistant from backsight and foresight so collimation error cancels out.

  • Height of instrument (HI) = reduced level of benchmark + backsight; reduced level of a point = HI minus foresight.

  • Change point rule: the last foresight of one instrument setup becomes the backsight of the next setup.

  • For a rectangular building, both diagonals must measure the same; correct each corner by half the difference until they agree.

  • Transfer the datum upwards with a tape and straightedge or a laser, and check each storey height against a storey rod.

  • Check verticality with a plumb bob or spirit level, and check each course with a line and line level before laying continues.

  • Check any laser level against a known benchmark before use, because an out-of-adjustment instrument repeats the same error everywhere.

Quick reference

Tools, Equipment and Material Handling

  • Brick trowel for laying and spreading mortar, pointing trowel for finishing joints, wood or steel float for render, hawk for holding mortar.

  • Bolster chisel with a club hammer cuts bricks and blocks; point, scutch and comb chisels dress stone.

  • Test a spirit level by reading it on a flat surface, reversing it end for end and comparing; the bubble must read the same both ways.

  • A standard builder's wheelbarrow holds about 60-70 litres (0.06-0.07 m3); count barrow loads when batching or moving concrete.

  • Slings, chains and lifting accessories must carry a marked safe working load, be inspected before each lift and never be overloaded.

  • Never put hands, trowels or shovels into a rotating mixer drum; isolate the power before cleaning or maintenance.

  • Brick tongs carry six to ten bricks and should be used instead of passing bricks hand to hand at height.

  • Clean mortar off tools before it sets and lightly oil steel surfaces; a set mortar film ruins a trowel edge and a level face.

  • Store chisels, blades and power tools in a dry store; sharpen chisel edges at the correct bevel and replace cracked handles.

Quick reference

Mortar, Concrete and Grout Preparation

  • Mortar by volume: 1:3 is strong, 1:4 to 1:5 is general purpose, 1:6 is weaker; lime or a plasticiser improves workability.

  • Use one gauge box or bucket for every batch so the cement:sand ratio stays constant; proportions are by volume unless weight batching is specified.

  • Concrete water-cement ratio is typically 0.4 to 0.6; adding extra water increases slump but lowers strength and causes bleeding.

  • Typical volume mixes: C20 about 1:2:4 and C25 about 1:1.5:3 cement:fine aggregate:coarse aggregate.

  • Mix the dry ingredients until the colour is uniform, add water and mix for 2-3 minutes; machine mixing gives a more consistent result.

  • Use cement mortar within about two hours of mixing, or about one hour in hot weather; do not revive stiffened mortar with extra water.

  • The slump test measures workability in millimetres; 150 mm cubes cured and crushed at 28 days measure compressive strength.

  • Sand must be clean, sharp and free of clay and organic matter; damp sand bulks, so volume batching must allow for it.

  • Grout for filling hollow block cores is a wet, high-slump cement mix placed to fill the voids and bond any reinforcement.

Quick reference

Brick and Block Masonry Construction

  • Standard bed and cross joints are about 10 mm thick, kept within 8-12 mm; thick joints reduce strength and increase shrinkage.

  • Bonds: stretcher, English (alternate header and stretcher courses) and Flemish (alternate header and stretcher in the same course); minimum overlap is one-quarter brick.

  • Header courses at quoins are finished with quarter closers so the bond closes correctly at the corner.

  • Limit each day's lift to about 1.2-1.5 m of wall height, and leave unfinished ends as stepped racking rather than vertical toothing.

  • Hollow block walls normally use 1:4 or 1:5 mortar; fill cores with grout where the specification requires it.

  • Cavity walls need wall ties at the specified spacing, commonly 900 mm horizontally and 450 mm vertically, with weep holes at the base.

  • Check plumb and level at every course with a spirit level, and use a storey rod to control course heights and opening sizes.

  • Do not lay masonry on a soft, saturated or dirty base, because the mortar will not bond and the wall will settle unevenly.

  • Protect new masonry from rapid drying and do not load green walls with stored materials or scaffolding ties.

Quick reference

Stone and Rubble Masonry Construction

  • Rubble types: random (uncoursed), coursed and polygonal; ashlar is squared, dressed stone laid in regular courses.

  • Lay every stone on its natural bed - the plane in which it formed in the quarry - for maximum strength and weather resistance.

  • Break the joints: no continuous vertical joint should run through two or more courses.

  • Place through stones or bond stones across the full wall thickness every 1 to 1.5 m in both directions to tie the faces together.

  • Pack hearting (small chips) into the wall core well bedded in mortar; loose filling leaves voids and weakens the wall.

  • Use a stiff 1:3 to 1:4 cement mortar that supports the stones without flowing out of the joints.

  • Retaining walls need a batter on the face, a wider base, weep holes and back drainage so water pressure cannot build up.

  • Check line, level and plumb with string and spirit level, and check face batter against a template as the wall rises.

  • Dress stone with point, scutch and boaster chisels, and wear goggles because dressing throws sharp chips.

Quick reference

Plastering, Rendering and Surface Finishing

  • Internal plaster is normally 10-15 mm thick in two coats; external render is 15-20 mm in two coats, each coat about 8-12 mm.

  • Mix internal plaster about 1:3 to 1:4 cement:sand (or cement:lime:sand); external render about 1:4 to 1:6 with a plasticiser or waterproofer.

  • Apply a scratch coat about 8-10 mm thick and comb or scratch it to form a key before the next coat.

  • Control suction by damping absorbent blockwork; on dense concrete use a bonding agent or spatterdash coat.

  • Fix corner beads and cover joints between different backgrounds with scrim or tape to prevent cracking.

  • Keep new plaster and render damp for about seven days; rapid drying causes shrinkage cracks and dusty surfaces.

  • A wood float gives a textured finish; a steel trowel gives a smooth, dense, polished finish.

  • Fit drip beads and bell mouths at the plinth and over openings so water is thrown clear of the wall.

  • Efflorescence is soluble salt deposited on the surface; brush it off dry, find the water source, and never wash it back in.

Quick reference

Measurement, Quality Control and Work Documentation

  • Measure lengths in metres, areas in square metres and volumes in cubic metres; describe work clearly in the bill of quantities.

  • Deduct openings larger than the stated limit, commonly 0.5 square metres, from masonry and plaster areas; smaller openings are not deducted.

  • One 50 kg cement bag has a loose volume of about 0.035 cubic metres, so roughly 28-30 bags make one cubic metre of loose cement.

  • Allow about 5-10 percent extra material for breakage, cutting and spillage; blocks, bricks and tiles need more than cement or sand.

  • Concrete cubes of 150 mm are cured and tested at 7 and 28 days; the 7-day strength is typically about 65-70 percent of the 28-day value.

  • Record deliveries, batch dates, slump and cube results, and inspection requests in the site diary as work proceeds.

  • Check level, plumb and dimensional tolerance against the specification at each stage and record any deviation before it is covered up.

  • Keep a snag list and obtain written sign-off before covering work that will later be hidden, such as wall ties or damp proof course.

Quick reference

Communication, Teamwork and Supervision Support

  • Hold a toolbox talk before work starts: state the task, the hazards, the controls and the PPE, and allow questions.

  • Read and follow the method statement and risk assessment; any change to the method needs supervisor approval first.

  • Report all accidents, near misses and dangerous occurrences promptly and make sure they are written in the site record.

  • Use one agreed signaller and standard hand signals with crane or hoist operators; nobody else gives signals.

  • Give short, clear instructions and confirm understanding by asking the worker to repeat the task back.

  • Escalate safety or quality problems beyond your authority to the supervisor; never improvise on a safety control.

  • Coordinate with other trades before chasing or cutting, and check for embedded services and finished work.

  • Keep the site diary, labour returns and material records accurate so the supervisor can plan and claim correctly.

  • Resolve disagreements privately and respectfully; refer repeated or serious issues to the supervisor rather than letting them affect work.