Sri Lanka NVQ L3 Mason study plan
Sri Lanka NVQ L3 Mason · Give each week a clear focus.
8 weeks · About 8 hours per week
Occupational Health, Safety and Environment on Masonry Sites & Brick and Block Masonry Construction
Identify the main hazard groups on a masonry site (work at height, falling objects, dust and silica, manual handling, electrical, housekeeping) and state at least one control measure for each.
Demonstrate correct selection, fitting, checking and removal of PPE for cutting, mixing and lifting tasks.
Describe the emergency response sequence for a fall from height, an eye injury and an electrical contact, including who is notified and in what order.
Lay a straight run of brickwork in stretcher bond to line, level and gauge using a gauge rod and corner blocks.
Your checkpoint
A signed-off hazard register covering 10 common masonry tasks, plus a practice wall of at least 1 m² in stretcher bond built within ±3 mm plumb over 1 m and with joints of consistent thickness.
Brick and Block Masonry Construction & Mortar, Concrete and Grout Preparation
Mix mortar to a stated volume ratio and assess workability by consistency, water retention and adhesion to the trowel.
Build a quoin (corner) keeping faces plumb, courses level and gauge correct on both returns.
Construct a block wall to a set-out line, checking plumb, level, line and square at each course lift.
Explain curing and protection requirements for freshly built masonry, including covering, dampening and time before loading.
Your checkpoint
A mortar batch record (ratio, water added, consistency result) and a built corner with both faces plumb within ±3 mm over 1 m and true to gauge.
Brick and Block Masonry Construction & Worksite Preparation, Setting Out and Levelling
Set out a rectangular building outline on the ground using pegs, lines and the 3-4-5 method, then verify by checking both diagonals.
Transfer and record levels using a water level and an automatic level, and reduce the readings to a common datum.
Erect profile boards and mark a datum line that can be used consistently by the bricklaying team.
Build walling that includes a door or window opening with correct lintel bearing and correct jamb plumb.
Your checkpoint
A site set-out sheet showing the outline dimensions and diagonal check within 5 mm, a datum transferred to at least four pegs, and a built opening with jambs plumb within tolerance.
Worksite Preparation, Setting Out and Levelling & Plastering, Rendering and Surface Finishing
Reduce a series of level readings using the height-of-collimation method and produce a level book with checks applied.
Prepare a wall surface for plastering: clean off dust, remove loose material, dampen and apply a scratch coat with adequate key.
Apply a float coat and finish it flat, checked with a 2 m straightedge and a plumb rule.
State the causes of common plaster defects (crazing, blow, shrinkage cracking) and how each is prevented.
Your checkpoint
A rendered practice panel of at least 2 m² with scratch and float coats, flatness deviation under 3 mm under a 2 m straightedge, submitted with a 10-reading level book.
Plastering, Rendering and Surface Finishing & Mortar, Concrete and Grout Preparation
Select and mix the correct mortar, concrete and grout mixes for bedding, screeding and filling applications, and justify each choice.
Form internal and external plaster corners, reveals and fix beads so that arises are straight and true.
Apply a finish coat and produce a consistent texture without trowel marks or hollows.
Cut out and repair a defective plaster patch so that it matches the surrounding surface in plane and texture.
Your checkpoint
A finished 1 m² wall section containing one external corner, one bead and one repaired patch, assessed against a self-written finishing checklist with recorded pass/fail results.
Tools, Equipment and Material Handling & Stone and Rubble Masonry Construction
Inspect, clean and maintain hand tools, identifying worn or damaged items and recording the action required.
Select and use measuring, cutting and compacting equipment correctly, confirming that guards and safety devices are fitted before use.
Select, sort and dress rubble stones, and place them to form a stable random rubble wall with proper bedding and pinning.
Build a rubble wall section with correct batter and with through stones placed at the specified spacing.
Your checkpoint
A tool inspection log covering 15 tools with defect actions recorded, and a rubble wall panel of at least 1 m² with through stones at correct spacing and batter checked against a template.
Stone and Rubble Masonry Construction & Measurement, Quality Control and Work Documentation
Take off quantities of brick, block, stone and mortar for a given wall, allowing stated wastage.
Check completed masonry against tolerances for plumb, level, line, joint thickness and bed depth, and record the measured deviations.
Complete a daily progress record and a snag list that another person could act on without further explanation.
State the reporting route for a quality failure and the documentation produced at handover.
Your checkpoint
A quantity take-off sheet for a 10 m × 2.5 m wall with wastage allowance, plus a quality-control inspection sheet recording measured tolerances and five snag items.
Measurement, Quality Control and Work Documentation & Communication, Teamwork and Supervision Support
Explain the site reporting chain and the handover procedure from mason to supervisor, including what is recorded and when.
Brief a two-person team on a simple masonry task, give clear instructions, confirm understanding and check the work against the brief.
Complete a 40-question mixed mock examination across all nine domains under timed conditions.
Review every incorrect answer, identify the five weakest areas and write a targeted revision plan for each.
Your checkpoint
A 40-question mock examination scored at 80% or above, with a written list of the five weakest areas and a revision plan for each.
Milestones
Week 2: Can mix mortar to a stated ratio and build a plumb corner unaided, with plumb within ±3 mm over 1 m on both faces.
Week 4: Can set out a rectangle with diagonals within 5 mm, reduce a set of level readings, and produce a flat float coat within 3 mm under a 2 m straightedge.
Week 6: Can select and use masonry tools safely, and build a stable rubble panel with correct batter and through stones at the required spacing.
Week 8: Scores 80% or above on the timed 40-question mock examination and has a written revision plan for the five weakest areas.