Sri Lanka NVQ L3 Mason key terms
Sri Lanka NVQ L3 Mason · Get comfortable with the vocabulary.
- Personal Protective Equipment (PPE)
- Related: Hazard, Risk Assessment
Clothing and gear worn to protect the body from site hazards, such as safety helmet, boots, gloves, goggles, hi-vis vest and hearing protection. It is the last line of defence and must be worn as instructed on site.
- Hazard
- Related: Risk Assessment, Toolbox Talk
Anything on a masonry site that has the potential to cause harm, such as an unguarded scaffold edge, falling bricks, sharp tools, dust or live electrical cables. Hazards are identified before work starts and then controlled.
- Risk Assessment
- Related: Hazard, Method Statement
A written check of the hazards in a task, how likely each one is to cause harm and how serious that harm would be, followed by the controls needed to reduce the risk to an acceptable level.
- Toolbox Talk
- Related: Hazard, Personal Protective Equipment (PPE)
A short safety briefing given by the supervisor to the work team at the start of a shift or task. It explains the day's hazards, the control measures and any changes to the method of work.
- Silica Dust
- Related: Personal Protective Equipment (PPE), Hazard
Fine dust produced when cutting, grinding or drilling concrete, bricks, blocks or stone. Breathing it damages the lungs, so dust must be controlled with water suppression, extraction or suitable respiratory protection.
- Site Layout Plan
- Related: Material Stacking, Site Access Route
A drawing showing where materials, spoil, mixers, storage, site huts, access roads and services will be placed on the site. It helps work flow safely and prevents clashes and double handling.
- Material Stacking
- Related: Site Layout Plan, Material Requisition
Storing bricks, blocks, cement, sand and stone in stable, level and well-drained positions so they do not collapse, roll or spoil. Stacks are kept low, away from edges and clear of access routes.
- Site Access Route
- Related: Site Layout Plan, Material Stacking
The defined path people, vehicles and materials use to enter, move around and leave the site. It must be kept clear, firm and lit so that deliveries and emergency exits are never blocked.
- Datum
- Related: Setting Out, Profile Board
A fixed reference point or level from which heights and positions on the site are measured. Datums are marked clearly and protected so that all setting out and level checks stay consistent.
- Setting Out
- Related: Datum, Mason's Line, Profile Board
Transferring the positions, lines and levels of a building from the drawings onto the ground. It uses pegs, profiles, lines and levels so walls, corners and openings are built in the correct place.
- Spirit Level
- Related: Setting Out, Mason's Line
A tool with sealed glass vials containing a bubble that shows whether a surface is horizontal or vertical. Masons use it to check courses, sills and frames for true level and plumb.
- Mason's Line
- Related: Profile Board, Spirit Level
A strong, brightly coloured cord stretched between two points to give a straight guide for laying courses. Bricks, blocks or stones are lined to it so the wall face stays straight and even.
- Profile Board
- Related: Setting Out, Mason's Line
A set of timber boards fixed outside the building corners at a known level, marked with the wall lines and heights. Strings stretched between them guide excavation and wall construction.
- Brick Trowel
- Related: Mortar, Bed Joint
A flat steel blade with a handle, used to pick up and spread mortar, tap bricks into place and trim excess mortar from joints. It is the mason's main hand tool.
- Bolster Chisel
- Related: Brick Trowel
A wide, flat chisel with a hardened edge used with a club hammer for cutting bricks, blocks and stone and for chasing walls. It gives a straight, controlled cut line.
- Concrete Mixer
- Related: Water-Cement Ratio, Slump Test
A machine with a rotating drum that blends cement, sand, coarse aggregate and water into concrete or mortar. Mixing time must be long enough to give a uniform colour and even consistency.
- Mortar
- Related: Mortar Mix Ratio, Bed Joint
A mixture of cement or lime, fine aggregate such as sand, and water, used to bed bricks and blocks and to fill joints. It sets hard to bind the units into a single strong wall.
- Mortar Mix Ratio
- Related: Mortar, Water-Cement Ratio
The proportion of cement, lime and sand in a mortar, for example 1:1:6 or 1:5. The ratio is chosen for the strength and durability the wall needs.
- Water-Cement Ratio
- Related: Mortar Mix Ratio, Slump Test, Curing
The weight of water compared with the weight of cement in a mix. Too much water weakens concrete and mortar, so the mix should be only as wet as needed for workability.
- Slump Test
- Related: Water-Cement Ratio, Cube Test
A site test that measures how workable or wet a concrete mix is. Fresh concrete is placed in a cone, the cone is lifted and the amount the concrete slumps is measured.
- Curing
- Related: Water-Cement Ratio, Cube Test
Keeping concrete, mortar or plaster moist and protected for a set period after placing so that it gains strength and does not crack. Methods include water spraying, wet coverings and plastic sheeting.
- Stretcher Bond
- Related: English Bond, Bed Joint, Quoin
A brickwork bond in which every brick in a course is laid lengthwise, with the joints offset by half a brick to the course below. It is used mostly for half-brick walls.
- English Bond
- Related: Stretcher Bond, Quoin
A brickwork bond made of alternating courses of headers and stretchers. It is strong and suitable for load-bearing walls of one brick or more in thickness.
- Quoin
- Related: Setting Out, Spirit Level, English Bond
The external corner of a masonry wall, built with specially selected or shaped bricks or stones. Quoins are raised first and used to line and level the rest of the wall.
- Bed Joint
- Related: Mortar, Stretcher Bond
The horizontal layer of mortar on which a brick, block or stone is laid. Its thickness is usually about 10 mm and it must be full and even for strength.
- Damp Proof Course (DPC)
- Related: Bed Joint, Rubble Masonry
A continuous barrier of impervious material built into a wall just above ground level to stop moisture rising into the building. It must not be bridged by mortar or rubble.
- Rubble Masonry
- Related: Coursed Rubble Masonry, Through Stone
Walling built from roughly shaped or unshaped stones taken from the quarry or field, bedded in mortar. It is common for foundations, retaining walls and boundary walls.
- Coursed Rubble Masonry
- Related: Rubble Masonry, Through Stone
Rubble walling where the stones are laid in roughly horizontal courses of similar height, with joints broken between courses. It is neater and stronger than random rubble.
- Through Stone
- Related: Rubble Masonry, Coursed Rubble Masonry
A long stone that runs through the full thickness of a rubble wall and ties the two faces together. Through stones are placed at regular intervals and often at corners for stability.
- Ashlar
- Related: Rubble Masonry, Quoin
Masonry of accurately cut and dressed stone with fine, even joints, laid in regular courses. It is used where a smooth, high-quality finish is required.
- Render
- Related: Scratch Coat, Dubbing Out, Efflorescence
A protective, weather-resisting coat of mortar applied to the outside face of a wall. It is usually applied in two or more coats and finished with a wood float, sponge or steel trowel.
- Scratch Coat
- Related: Render, Dubbing Out
The first coat of render or plaster, combed or scratched with a tool to create a rough key. It provides a grip for the following coat.
- Dubbing Out
- Related: Scratch Coat, Render
Filling hollow or uneven areas of a wall with small amounts of mortar before the main plaster or render coat is applied. It brings the background close to an even surface.
- Efflorescence
- Related: Render, Damp Proof Course (DPC)
A white, powdery salt deposit that appears on the surface of masonry or plaster. It usually comes from moisture carrying salts through the material and is brushed off once dry.
- Snag List
- Related: Tolerance, Work Instruction
A written record of small defects or incomplete items found during inspection near handover. Each snag is listed with its location and must be corrected and signed off.
- Tolerance
- Related: Spirit Level, Snag List
The permitted amount by which a finished dimension, level or line may vary from what the drawing shows. Work outside tolerance must be corrected before it is accepted.
- Cube Test
- Related: Slump Test, Curing
A test in which concrete cubes are cast on site, cured and crushed in a laboratory to measure compressive strength. Results show whether the concrete meets the specified grade.
- Method Statement
- Related: Risk Assessment, Work Instruction, Toolbox Talk
A written description of how a work task will be carried out safely and in the correct sequence, including plant, materials, people and controls. Workers must follow it.
- Material Requisition
- Related: Material Stacking, Site Layout Plan
A formal request from the site team to the store or office for the materials needed for a task. It records the type, quantity and date required.
- Work Instruction
- Related: Method Statement, Toolbox Talk
A clear, step-by-step direction given to a worker or team on how to carry out a specific task, including quantities, sequence and the quality expected.