SLIA Part I flashcards
SLIA Part I · Build recall with a focused review session.
33 cards. Read the term and the definition here. The deck at the top of this page is optional.
- Vitruvian triad
- Firmitas, utilitas, venustas - structural soundness, functional appropriateness, and beauty. The three-part test is the oldest framework in architectural theory and is still applied to critique buildings today.
- Five Points of Architecture
- Le Corbusier's 1926 principles: pilotis, free ground plan, free facade, ribbon windows, and roof garden. They follow from reinforced concrete frame construction freeing walls from structural duty.
- Critical regionalism
- Kenneth Frampton's 1983 position that architecture should resist placeless universal technique while avoiding nostalgic pastiche, using tectonics, climate, light, and topography to root buildings in place.
- Athens Charter
- CIAM document of 1933 that zoned cities into dwelling, work, recreation, and circulation. Team X later criticised it for destroying street life and urban complexity.
- Decorated shed and duck
- Robert Venturi's distinction between buildings whose meaning comes from applied signage and ornament (shed) and buildings whose form itself is the symbol (duck).
- Thermal transmittance U-value
- Heat flow in watts through one square metre of construction per kelvin of temperature difference. It equals one divided by total thermal resistance, including surface films.
- Thermal bridging
- A path of higher conductivity through insulation, such as a balcony slab or steel lintel. It lowers overall R, risks condensation, and must be calculated separately from the clear field.
- Vapour control layer position
- Placed on the warm side of insulation so water vapour is stopped before it reaches the dew point. Wrong-side placement traps moisture and causes interstitial condensation and decay.
- Plastic moment capacity
- Mpl = Wpl × fy / γM0 for a steel section, where Wpl is the plastic section modulus. It governs bending resistance at the ultimate limit state.
- kmod and kdef
- Timber design factors: kmod reduces strength for load duration and moisture service class; kdef accounts for long-term creep deflection. Both are read from the relevant code tables.
- Fire resistance R E I
- R is loadbearing capacity, E is integrity against flames and hot gases, I is insulation against temperature rise. Each is expressed in minutes and tested independently.
- Concrete curing period
- Time during which moisture and temperature are maintained for hydration. Seven days is a common minimum for ordinary Portland cement at 20 °C; cold weather requires insulation and monitoring.
- Practical completion
- The point at which works are complete except for minor defects, possession passes to the client, risk transfers, and the defects liability period begins.
- Retention
- A percentage withheld from each payment, commonly 5% reducing to 2.5% after practical completion, to secure rectification of defects during the liability period.
- Variation valuation
- Order of valuation: rates in the contract bill, then analogous rates, then a fair valuation or quotation. The instruction must be in writing or promptly confirmed.
- Claims-made insurance
- Professional indemnity cover responds to claims notified during the policy period, regardless of when the work happened. Cover must therefore continue after the project ends.
- Letter of intent
- A pre-contract document authorising limited work before the main contract is signed. It should state scope, fee, duration, and a cap on liability.
- Architect's certifying duty
- When issuing certificates and valuations the architect must act fairly and independently, not as the client's agent. The duty is contractual and can be challenged by either party.
- Negligence elements
- A claim requires duty of care, breach of that duty, causation of loss, and recoverable damage. The standard is the ordinary skill of a reasonably competent practitioner.
- Statute of limitations
- Time limits for bringing claims, commonly six years for contract and tort, twelve for deeds, with a fifteen-year longstop in many jurisdictions from the act.
- Collateral warranty
- An agreement giving a funder, tenant, or purchaser direct contractual rights against the architect, avoiding reliance on tortious duty and its shorter limitation period.
- Copyright in drawings
- Copyright arises automatically on creation and usually stays with the author. The client normally receives a licence for the specific project, not ownership of the design.
- Conflict of interest
- Any interest that could influence professional judgement, such as a fee from a supplier or a role for a relative. It must be declared and managed in writing.
- Designer health and safety duty
- Designers must eliminate foreseeable hazards, reduce remaining risk, and provide information needed for safe construction, use, and maintenance. The duty cannot be delegated away.
- Ramp gradient limit
- One in twelve is the steepest commonly permitted ramp, with landings at intervals and at changes of direction. Steeper gradients are treated as stairs for accessibility purposes.
- Two directions of escape
- Required beyond a threshold occupancy so that a single fire cannot block all routes. Alternative routes must be independent and lead to a place of safety.
- Daylight factor
- Internal illuminance divided by unobstructed external horizontal illuminance, expressed as a percentage. A useful target is around 2% average over the working plane.
- Stair formula 2R + G
- Twice the riser plus the going should fall between about 550 and 700 millimetres. This matches comfortable human gait and is used to check stair geometry.
- Net-to-gross efficiency
- Net usable floor area divided by gross internal area, typically 75–85% for offices. Core, circulation, and structure consume the remainder and drive scheme viability.
- Occupancy load factor
- Floor area per person used to convert a space into a design population, which then sets exit widths, stair numbers, and sanitary provision.
- Whole-life carbon modules
- A1–A3 product, A4–A5 construction, B1–B7 use and maintenance, C1–C4 end of life, D beyond-boundary benefits. The framework standardises carbon reporting across a building's life.
- Airtightness at 50 Pa
- Air leakage measured in cubic metres per hour per square metre of envelope at 50 pascals. Good dwellings achieve around 3–5; passive-level targets are below 1.
- Solar control g-value
- The fraction of incident solar energy admitted through glazing. Lower values reduce overheating risk, and shading is generally more effective than adding cooling capacity.