- Loi du 21 septembre 2006
- Luxembourg law governing residential leases (bail à usage d'habitation): written form, inventory, deposit capped at two months' rent, notice periods, and rent indexation rules.
- Trêve hivernale
- Winter truce from 1 November to 15 March during which enforcement of eviction from a dwelling is suspended, except by court order for specific grounds.
- Copropriété voting majorities
- Under the 1975 co-ownership law, structural works require a three-quarter majority of the general assembly; changing the building's destination requires unanimity.
- PAG
- Plan d'Aménagement Général: the communal land-use plan defining zones, building coefficients and urban rules; adopted after public enquiry and ministerial approval under the 2013 planning law.
- PAP
- Plan d'Aménagement Particulier: a project-level plan that must be compatible with the PAG; either 'quartier existant' or 'nouveau quartier', requiring a convention with the commune for infrastructure.
- COS vs CUS
- COS (coefficient d'occupation du sol) equals building footprint divided by plot area; CUS (coefficient d'utilisation du sol) equals gross floor area divided by plot area.
- Servitude urbanistique
- A planning easement (setback, building line, height limit) recorded in the PAG or PAP that binds all subsequent owners and runs with the land.
- Permis de construire
- Communal building permit required for new construction, substantial alteration, change of use and certain demolition; explicit authorisation is needed - silence does not grant it.
- Certificat d'urbanisme
- A non-binding information document issued by the commune stating the planning rules applicable to a specific plot; it does not authorise works.
- Recours au Conseil d'État
- Appeal against a building-permit refusal lodged with the administrative jurisdiction of the Conseil d'État within three months of notification; it does not automatically suspend the decision.
- PEB certificate
- Certificat de performance énergétique required for new buildings and for sale or rental; energy class A to I; valid for ten years under the 2016 energy-performance law.
- nZEB requirement
- Nearly zero-energy building standard (bâtiment à consommation quasi nulle) mandatory for new public buildings from 2021 and private buildings from 2023 in Luxembourg.
- K-value
- Global thermal transmission coefficient of a building envelope; new residential buildings must achieve K ≤ 0.30 W/m³K under Luxembourg PEB rules.
- Glaser method
- Steady-state calculation of temperature and vapour-pressure profiles through a building element to check for interstitial condensation risk; vapour barrier placed on the warm side.
- Eurocode national annex
- Luxembourg National Annexes (ANL) to the Eurocodes set nationally determined parameters such as snow load, wind velocity and seismic acceleration for design.
- Luxembourg seismic zone
- Luxembourg lies in a low-seismicity zone with design ground acceleration generally ≤ 0.04g; EN 1998-1 applies with the national annex for ordinary buildings.
- Imposed floor loads
- EN 1991-1-1 characteristic values: 1.5 kN/m² for residential floors, 3.0 kN/m² for stairs, 2.5 kN/m² for balconies (categories A and B).
- Luxembourg geology
- Luxembourg Sandstone (Lias) dominates the centre and east (Gutland); schist and quartzite form the Ardennes (Oesling); geotechnical investigation per EN 1997 precedes foundation design.
- VMC heat recovery
- Mechanical ventilation with heat recovery (η ≥ 80%) required for nZEB dwellings; minimum ventilation rate about 0.3 air changes per hour under EN 13141.
- RGIE / AREI
- Luxembourg general regulation on electrical installations: 30 mA differential protection for socket circuits, TN earthing, and inspection before energisation.
- Legionella prevention
- Domestic hot water stored at ≥ 60 °C and distributed at ≥ 50 °C to limit Legionella growth; dead legs and oversized tanks should be avoided.
- Lift inspection
- Lifts designed to EN 81-20/50 must be inspected every 12 months by an approved inspection body in Luxembourg.
- Coordinateur sécurité-santé
- Safety and health coordinator required under the 1994 law whenever several contractors work on a site; appointed from design phase through completion.
- Smoke detector obligation
- Under the 8 June 2004 law, every dwelling must have smoke detectors; common areas of apartment buildings also require detection and maintained escape routes.
- Reaction to fire classes
- EN 13501-1 classes A1 to F; floor coverings in escape routes must be at least Bfl-s1 and wall linings at least B-s1,d0 in common areas.
- Asbestos inventory
- Before renovating buildings completed before 2005, an asbestos inventory is required under the 2007 law; removal must be done by certified firms.
- Ramp slope limit
- Under the 2022 accessibility law, ramps in public buildings have a maximum slope of 6% (5% preferred), flights of at most 10 m, and landings of 1.5 m.
- Accessible door width
- Clear door width of at least 0.90 m for public buildings and 0.80 m minimum for interior doors in dwellings; threshold height ≤ 2 cm; lever handles at 1.00-1.10 m.
- Accessible parking space
- Minimum width 3.30 m (2.50 m plus 0.80 m transfer zone); at least one space per 50 spaces, located close to the accessible entrance.
- OAI mission phases
- Ordre des Architectes et des Ingénieurs-Conseils mission stages: esquisse, avant-projet, projet, dossier d'autorisation, appel d'offres, chantier, réception, defined in the architecture contract.
- Marché à forfait
- Lump-sum construction contract in which the price is fixed; variation claims are limited to unforeseen circumstances or client-ordered changes.
- Responsabilité décennale
- Ten-year liability of builders for structural and waterproofing defects; provisional acceptance starts the one-year perfect-completion guarantee.
- Retenue de garantie
- Five percent of the contract price retained until final acceptance; may be replaced by a bank guarantee under Luxembourg construction practice.