Master Electrician study materials
Master Electrician study resources

Master Electrician cheat sheet

Master Electrician · Keep the key ideas within reach.

Quick reference

General Electrical Knowledge, Theory, and Definitions

  • Ohm's law: E = I × R; power P = E × I = I²R = E²/R.

  • AC impedance: Z = √(R² + (X_L − X_C)²); X_L = 2πfL; X_C = 1/(2πfC).

  • Balanced three-phase real power: P = √3 × V_L × I_L × PF; reactive power Q = √3 × V_L × I_L × sin θ.

  • Sine wave: RMS = peak ÷ √2; peak = RMS × 1.414; full-cycle average of a pure sine is zero.

  • Voltage drop: single-phase VD ≈ 2KIL/CM; three-phase VD ≈ 1.732KIL/CM, where K is conductor resistivity constant.

  • Continuous load: operates at maximum current for 3 hours or more; size conductors and OCPDs at 125% where required.

  • Ampacity depends on conductor size, insulation temperature rating, ambient temperature, and number of current-carrying conductors.

  • Grounded conductor is the neutral or circuit conductor intentionally connected to earth; grounding conductor is the equipment grounding conductor.

Quick reference

Wiring Methods, Materials, and Installation Practices

  • Raceway fill: 1 conductor 53%, 2 conductors 31%, 3 or more 40%; nipples 60% for 3 or more.

  • Box fill: 14 AWG = 2.0 in³, 12 AWG = 2.25 in³, 10 AWG = 2.5 in³; count each conductor, clamp, device, and ground.

  • NM cable support: within 12 in of box and every 4.5 ft; secure where required and protect from physical damage.

  • EMT support: within 3 ft of box and every 10 ft; RMC support every 10 ft; IMC similar to RMC.

  • Expansion fittings are required where raceway crosses building expansion joints or where thermal movement is expected.

  • Bushings are required where conductors 4 AWG and larger enter a raceway or box, to protect insulation.

  • Metal raceways and cables must be bonded and grounded; using raceway as EGC requires compliant continuity and fittings.

  • Direct-buried cable minimum cover depends on voltage and location; NEC Table 300.5 sets depths such as 24 in for general direct burial.

Quick reference

Branch Circuits, Feeders, and Load Calculations

  • Dwelling general lighting: 3 VA/ft²; small-appliance circuits: two or more 20A, 1500 VA each; laundry: 1500 VA.

  • Bathroom receptacle circuits must be 20A and may serve only bathroom outlets; kitchen counter receptacles need GFCI.

  • Continuous branch-circuit load: conductor and OCPD sized at 125% of continuous load plus 100% of noncontinuous load.

  • Non-dwelling receptacle load: 180 VA per yoke; dwelling receptacle outlets are included in general lighting unless specific.

  • Standard OCPD ratings: 15, 20, 25, 30, 40, 50, 60, 70, 80, 90, 100, 110, 125, 150, 175, 200 A.

  • Dwelling lighting demand: first 3000 VA at 100%, remaining general lighting at 35%; appliance demand factors apply separately.

  • Fixed electric space heating: branch circuit and OCPD sized at 125% of nameplate load.

  • Multiwire branch circuit: line-to-neutral loads; handle-tied breaker or simultaneous disconnect required.

Quick reference

Overcurrent Protection and Short-Circuit Coordination

  • OCPD must protect conductors at their ampacity; next higher standard rating permitted only where ampacity does not match a standard size and conditions are met.

  • Interrupting rating must be at least available fault current; series ratings require a listed combination.

  • Motor branch: overload protects motor; short-circuit/ground-fault device protects conductors; conductor ≥125% FLC.

  • Tap rule: 10-ft tap and 25-ft tap require specific ampacity, length, and enclosure conditions.

  • GFPE for 480Y/277V service disconnects 1000A or more: maximum 1200A setting with time delay for selectivity.

  • Selective coordination required for emergency systems, legally required standby, and critical operations power systems.

  • Ambient temperature and conductor bundling derating reduce ampacity before selecting OCPD.

  • Current-limiting devices reduce let-through energy but do not by themselves ensure coordination.

Quick reference

Grounding, Bonding, and Ground-Fault Protection

  • Service grounded conductor bonded to grounding electrode system at service; neutral must not be bonded downstream.

  • GEC sized from service conductors per NEC Table 250.66; EGC sized from OCPD rating per Table 250.122.

  • Grounding electrodes include 8-ft rod, 2 AWG copper ground ring at least 20 ft, plate, pipe, and concrete-encased electrode.

  • Single rod, pipe, or plate: 25 ohms or less, or supplement with an additional electrode.

  • Class A GFCI trips at 4–6 mA; GFPE for equipment often 30 mA or higher.

  • Equipment bonding jumpers maintain fault path across water meters, gas piping, and removable sections.

  • EGC can be wire, busbar, or listed metal raceway; must be continuous and sized for fault current.

  • Receptacle grounding terminal must be connected to EGC; no neutral-to-ground connection at receptacles.

Quick reference

Services, Service Equipment, and Panelboards

  • One service per building or structure unless special occupancy or capacity exceptions apply.

  • Service conductors have short-circuit protection but no overload protection; service disconnect located nearest entry.

  • Service equipment must be listed and marked suitable for use as service equipment.

  • Working space: 30 in wide, 36 in deep for ≤600V, 6.5 ft high; more depth for higher voltages.

  • Panelboard dedicated space: 30 in wide, 36 in deep, 6 ft high, free of foreign piping and ducts.

  • Service-entrance conductor ampacity must carry calculated load; continuous load at 125%.

  • Main bonding jumper installed at service; grounding electrode conductor connected at service.

  • Panelboard neutral bar must be isolated from enclosure when not service equipment.

Quick reference

Motors, Motor Controls, Generators, and HVAC Equipment

  • Motor branch conductors ≥125% of FLC from NEC tables; overload sized per nameplate service factor.

  • Motor disconnecting means within sight and within 50 ft; lockable open if out of sight.

  • Motor short-circuit protection from tables; inverse-time breaker up to 250% FLC for standard motors.

  • Motor feeder demand factors apply for multiple motors; largest motor adds 25%.

  • Generator transfer switch prevents backfeed; optional standby systems require load management.

  • HVAC hermetic compressor circuits use nameplate rated-load amps; branch conductor ≥125% RLA.

  • Motor control circuit conductors protected per control transformer and overload requirements.

  • Generator neutral grounding depends on transfer switch switched or unswitched neutral; separately derived system rules apply.

Quick reference

Transformers and Power Distribution Systems

  • Transformer current: single-phase I = kVA×1000/V; three-phase I = kVA×1000/(√3×V).

  • Primary and secondary OCPD sized per NEC Table 450.3(B); next standard size permitted.

  • Transformer secondary conductors can use 10-ft or 25-ft tap rules with conditions.

  • Delta-wye transformer creates a separately derived system; X0 bonded to enclosure and EGC.

  • Dry-type transformer requires ventilation and clearances; install only where listed for the location.

  • Parallel transformers require same voltage ratio, impedance, and tap settings.

  • K-rated transformer handles harmonic loads; derating applies for nonlinear loads.

  • Transformer inrush current can trip fast-magnetic breakers; use dual-element fuses or thermal-magnetic devices.

Quick reference

Special Occupancies, Special Locations, and Special Equipment

  • Hazardous locations: Class I gases or vapors; Class II dust; Class III fibers or flyings; divisions or zones define probability.

  • Health care: life safety, critical, and equipment branches; essential electrical system transfer.

  • Swimming pools: equipotential bonding, GFCI protection, and no receptacles within 6 ft of pool edge.

  • Solar PV: rapid shutdown at array, DC labeling, and conductor sizing at 125% Isc.

  • Fire pumps: dedicated reliable power, listed controller, and no GFCI protection on fire pump circuits.

  • Assembly occupancies: emergency lighting and exit signs require battery or generator backup.

  • Agricultural buildings: equipotential plane in livestock areas and GFCI for receptacles.

Quick reference

Electrical Safety, Code Administration, and Plan Review

  • Lockout/tagout: de-energize, lock, tag, test with properly rated meter before work.

  • Approach boundaries: limited, restricted, prohibited; arc flash PPE based on incident energy.

  • Plan review verifies load calculations, available fault current, interrupting ratings, voltage drop, and clearances.

  • Rough-in inspection occurs before concealment; final inspection after complete installation.

  • Arc flash label includes nominal voltage, available fault current, clearing time, and incident energy.

  • Energized work requires permit and justification; PPE and insulated tools required.

  • Confined space entry requires permit, atmospheric testing, attendant, and rescue plan.