Master Electrician flashcards
Master Electrician · Build recall with a focused review session.
32 cards. Read the term and the definition here. The deck at the top of this page is optional.
- Ohm's law formula
- For a resistive circuit, voltage equals current times resistance (E = I × R); power equals voltage times current, or current squared times resistance.
- Three-phase power formula
- In a balanced three-phase circuit, real power equals the square root of three times line voltage times line current times power factor.
- Continuous load definition
- A load expected to operate at maximum current for three hours or more; conductors and overcurrent devices are sized at 125 percent where the Code requires.
- Voltage drop formula
- Single-phase voltage drop approximately equals two times conductor constant K times current times one-way length divided by circular mils; three-phase uses square root of three.
- NM cable support spacing
- Nonmetallic-sheathed cable must be secured within 12 inches of boxes and at intervals not exceeding 4.5 feet along runs.
- Raceway conductor fill
- For three or more conductors in a raceway, total conductor area may not exceed 40 percent of the raceway interior cross-sectional area.
- Box fill counting
- Each 14 AWG conductor counts 2.0 cubic inches, 12 AWG counts 2.25, and 10 AWG counts 2.5; clamps, devices, and grounds add volume.
- Small appliance circuits
- Dwelling kitchens require at least two 20-ampere small-appliance branch circuits, each calculated at 1,500 volt-amperes, serving countertop receptacles.
- General lighting load
- For dwelling units, the general lighting load is calculated at 3 volt-amperes per square foot of floor area, with demand factors applied.
- Receptacle load calculation
- In non-dwelling occupancies, each receptacle outlet is calculated at 180 volt-amperes per yoke unless the load is known to be greater.
- Interrupting rating
- An overcurrent device's interrupting rating must equal or exceed the available fault current at its line terminals; otherwise it may fail violently.
- Motor short-circuit protection
- Motor branch-circuit short-circuit and ground-fault protection is selected from Code tables and is separate from overload protection, which protects the motor from overheating.
- Series-rated system
- A series-rated combination must be tested and listed as a unit; replacing one device with an unlisted type voids the rating.
- Grounding electrode conductor
- The grounding electrode conductor is sized from the service-entrance conductor using the Code table, and it connects the grounded system to the grounding electrode system.
- Equipment grounding conductor
- The equipment grounding conductor provides a low-impedance fault path and is sized from the overcurrent device rating using the Code table.
- GFCI trip level
- A Class A ground-fault circuit interrupter trips at 4 to 6 milliamperes of ground-fault current and is intended to protect personnel.
- Main bonding jumper
- The main bonding jumper connects the grounded service conductor to the service equipment enclosure and grounding electrode conductor at the service.
- Service disconnect location
- Service disconnecting means must be installed at a readily accessible location nearest the point of entry of service conductors, either outside or inside nearest entry.
- Working clearance depth
- For equipment operating at 600 volts or less, the minimum working space depth is 36 inches, with 30-inch width and 6.5-foot height.
- Dedicated panel space
- Panelboards require a dedicated space 30 inches wide, 36 inches deep, and 6 feet high, kept free of foreign piping and ducts.
- Motor conductor sizing
- Motor branch-circuit conductors must have an ampacity of at least 125 percent of the motor full-load current from the Code tables.
- Motor disconnect location
- A motor disconnecting means must be within sight of the motor and within 50 feet, unless the disconnecting means is capable of being locked open.
- Generator transfer switch
- A transfer switch prevents a generator from backfeeding the utility supply by disconnecting the normal source before connecting the generator.
- HVAC compressor circuit
- Hermetic refrigerant motor-compressor branch circuits are sized from the nameplate rated-load amperes, not from standard motor full-load current tables.
- Transformer current formula
- Single-phase transformer current equals kVA times 1,000 divided by voltage; for three-phase, divide by the square root of three times voltage.
- Transformer secondary tap
- Secondary conductors may be protected by the primary device under the 25-foot tap rule only when specific conditions for length and enclosure are met.
- System bonding jumper
- In a separately derived system, the system bonding jumper connects the transformer secondary neutral to the equipment grounding conductor and enclosure.
- Hazardous location classification
- Class I locations contain flammable gases or vapors; Class II contains combustible dust; Class III contains ignitable fibers or flyings.
- Swimming pool bonding
- Equipotential bonding around a swimming pool ties together metal parts, pool water, and equipment to reduce voltage gradients.
- Health care critical branch
- The critical branch supplies selected patient-care and life-support loads and must be separate from the equipment branch.
- Lockout tagout
- Before work, the circuit must be de-energized, locked, tagged, and tested with a meter rated for the voltage to verify absence of voltage.
- Plan review fault current
- Plan review checks available fault current against equipment interrupting and withstand ratings, plus conductor ampacity, voltage drop, and working clearances.