- Addendum acknowledgment
- A bidder records each addendum number and date on the bid form. An unacknowledged addendum can make the bid nonresponsive even when the price is competitive.
- Bid bond amount
- A bid bond is commonly 5 to 10 percent of the bid amount and guarantees the bidder will enter the contract if awarded. Performance and payment bonds are usually 100 percent of the contract sum.
- Unit price purpose
- Unit prices price changed quantities after award. They should be built from labor, material, and equipment rates, not derived by dividing the total bid by the total scope.
- Common scope gaps
- Scaffolding, hoisting, cleaning, flashing, lintels, grout pumps, temporary heat, and anchors are often assigned to other trades. The contract should state in writing which party provides each.
- Material escalation clause
- A contract provision that adjusts price when specified material costs move beyond a stated basis, such as per bag of mortar cement or per ton of reinforcement, during a long bid-to-build gap.
- Alternates pricing order
- Price the base bid first, then add or deduct alternates in the order the bid documents list them. Out-of-order alternates can produce a nonresponsive or miscompared bid.
- TMS 402 and TMS 602
- TMS 402 contains structural design requirements for masonry, including allowable stress and strength design. TMS 602 contains construction and materials requirements. Both are adopted through the building code.
- Mortar type selection
- Type M has the highest compressive strength, S is for general structural use, N for general use, O and K for low strength. Mortar is specified by type under ASTM C270.
- Grout coarse versus fine
- ASTM C476 grout is coarse when the clear grout space is 2 inches or more, and fine when the space is 2 to 4 inches. Grout is not mortar.
- Prism testing ASTM C1314
- Prisms built from the project units and mortar are tested to establish f'm. Prism strength is lower than unit strength, so design values come from prism or correlated values.
- Weep hole spacing
- Weep holes at the base of a cavity wall allow water to drain. They are placed above flashing and spaced per the specification, commonly no more than 24 inches on center.
- Empirical design limits
- TMS 402 empirical design applies to single-wythe hollow or solid walls within height and slenderness limits, with minimum f'm of 1,500 psi and mortar type M or S.
- Fire resistance equivalent thickness
- Masonry fire ratings depend on equivalent thickness, unit type, and whether cores are grouted or filled. Ratings are determined from TMS tables or ASTM E119 testing.
- Bid shopping defined
- Soliciting a lower price from a subcontractor after using that sub's number to win the prime contract. It is an ethics violation; award goes to the listed sub absent documented cause.
- Written change order rule
- No extra work proceeds without written authorization or a written directive. Verbal instructions are confirmed in writing the same day with scope, cost, and time impact stated.
- Pay-if-paid versus pay-when-paid
- Pay-if-paid makes owner payment a condition precedent to subcontractor payment. Pay-when-paid sets a timing obligation. The two clauses have different legal effects and should be identified in the subcontract.
- Mechanic's lien deadline
- Lien and preliminary notice deadlines run from first furnishing of labor or material, not from project completion. Missing the statutory deadline can forfeit lien rights.
- Conflict of interest disclosure
- Ownership, family, or financial relationships with suppliers, inspectors, or competing bidders must be disclosed. Undisclosed relationships can void an award and create legal liability.
- Substitution documentation
- A proposed product substitution requires written approval and documented equivalence to the specified product. Submitting a noncompliant product shifts risk to the contractor.
- ASTM C90 versus C129
- ASTM C90 covers loadbearing concrete masonry units. ASTM C129 covers nonloadbearing units. The units are not interchangeable, so the correct standard must be specified.
- Brick weathering grades
- Facing brick grades are SW for severe weathering, MW for moderate, and NW for negligible. Grade selection must match the exposure condition, not only the desired appearance.
- Mortar cement versus portland
- Mortar cement and masonry cement under ASTM C91 and C1329 are distinct from portland cement-lime mortar. They are not substituted without an approved mix design.
- Wall tie corrosion class
- Wire joint reinforcement, ties, and anchors must be galvanized or otherwise protected per ASTM A951 and A153. The coating class is selected for the exposure condition.
- Breathable versus film sealer
- Penetrating breathable sealers allow vapor transmission. Film-forming sealers can trap moisture and cause spalling, so selection depends on the wall assembly design.
- Lintel corrosion protection
- Steel lintels and shelf angles must be sized for load and protected against corrosion. The primer or galvanizing must match the exposure, and bearing length must meet the design.
- Field mock-up purpose
- A mock-up wall panel establishes workmanship standards for tooling, joint width, flashing, and cleaning before production. It is approved before the work proceeds.
- Mortar sampling ASTM C780
- ASTM C780 sets procedures for sampling and testing mortar. Test frequency is set by the specification, and results are compared with the specified compressive strength.
- Concealed work inspection
- Reinforcement placement, grout space cleanliness, flashing laps, weep placement, and anchor embedment are verified before grouting. These items cannot be inspected after concealment.
- Grout consolidation
- TMS 602 requires grout consolidation by mechanical vibrator or puddling. Lift height limits depend on grout type, and conventional grout in tall lifts requires reconsolidation.
- Water penetration ASTM E514
- ASTM E514 water penetration testing on mock-ups or field panels is a common exterior wall quality requirement. Results guide flashing and detailing corrections.
- Fall protection threshold
- OSHA 1926 Subpart M requires fall protection at 6 feet or more in construction. Options include guardrails, personal fall arrest, or a fall protection plan.
- Silica Table 1 controls
- OSHA 1926.1153 Table 1 assigns engineering controls by task. Wet cutting, integrated water delivery, and dust collection are specified, with respiratory protection following the table.