MCAA Masonry · Give each week a clear focus.

8 weeks · About 6 hours per week

Week 1

Codes and Standards

  • Map the scope of the major model codes referenced in masonry practice (IBC, MSJC/TMS 402/602, ASTM material standards, and local amendments) and list which code governs which construction type.

  • Outline the load-path and structural-design provisions of TMS 402 for unreinforced and reinforced masonry, including prescriptive versus engineered approaches.

  • Compile a one-page cross-reference of ASTM test and specification standards (units, mortar, grout, anchors, reinforcement) to the code sections that invoke them.

  • Identify five common code-compliance questions a masonry contractor must resolve before bid (fire rating, seismic detailing, veneer attachment, lintel sizing, and grout spacing).

Your checkpoint

A 2-page code map: code/standard, governing body, what it covers, and the specific sections most likely to appear in MCAA exam scenarios, checked against your own notes for accuracy.

Week 2

Codes and Standards & Quality Assurance Best Practices

  • Explain the QA/QC requirements embedded in TMS 602 and how they differ from TMS 402 design requirements.

  • Draft a pre-construction QA checklist covering submittals, mock panels, material certification, and sampling/testing frequency.

  • Compare field-testing methods (mortar and grout compressive strength, prism testing, anchor pull tests) and state when each is required versus optional.

  • Write five short scenarios where a QA failure would trigger rejection or rework, and cite the standard that supports each decision.

Your checkpoint

A QA/QC checklist and a 5-scenario decision log that correctly cites the governing code or ASTM standard for each acceptance criterion.

Week 3

Ethics and Business Practice

  • Summarize the ethical obligations in bidding: bid accuracy, no bid-shopping, confidentiality of competitor information, and disclosure of errors.

  • Analyze three ethical dilemmas (post-bid error discovery, substitution requests, and change-order pricing) and write a defensible course of action for each.

  • Outline contract types (lump sum, unit price, cost-plus) and explain how each affects risk allocation and bid strategy.

  • List the business-practice records a masonry contractor must retain and why (bonding, lien rights, insurance certificates, certified payroll).

Your checkpoint

A one-page ethics and business-practice reference sheet with three dilemma responses, each citing a principle (fairness, honesty, contract fidelity) and a business consequence.

Week 4

Bidding Practices

  • Break down the bid process from invitation to submission: takeoff, pricing labor and material, overhead and profit, and bid review.

  • Perform a quantity takeoff for a simple masonry wall assembly (units, mortar, grout, reinforcement, ties, flashing) and price it using local unit costs.

  • Identify the documents that must be reviewed before bidding (drawings, specifications, addenda, geotechnical report, schedule) and flag common scope gaps.

  • Explain bid alternates, unit prices, and allowances and how each is presented on a bid form.

Your checkpoint

A complete practice bid package for a small wall section: takeoff quantities, unit-cost buildup, overhead/profit, and a one-page bid summary with assumptions and exclusions.

Week 5

Masonry Products

  • Classify masonry units by material (clay brick, concrete masonry, stone) and list the ASTM specification and grade/type designations for each.

  • Describe mortar types (M, S, N, O) and their appropriate applications, including the effect of cementitious materials on bond and durability.

  • Explain grout, reinforcement, anchors, ties, flashing, and sealant materials, including compatibility and corrosion-protection requirements.

  • Match five project conditions (high seismic, freeze-thaw, high wind, fire-rated, veneer) to the correct product selection and justify each choice.

Your checkpoint

A product-selection matrix: material category, ASTM standard, key properties, typical applications, and one project condition per row with justification.

Week 6

Quality Assurance Best Practices

  • Develop a field inspection plan for masonry construction covering layout, foundation interface, reinforcement placement, grouting, and flashing.

  • Describe the correct procedures for grout placement, consolidation, and reconsolidation, and identify defects that require removal and replacement.

  • Outline a mock-up and preconstruction testing program, including what the mock-up must demonstrate and who signs off.

  • Write a corrective-action protocol for three common defects (cold joints, missing reinforcement, inadequate mortar joint thickness) with acceptance criteria.

Your checkpoint

A field QA inspection plan and defect-response protocol that references specific code or ASTM acceptance criteria for each inspection point.

Week 7

Safety

  • Identify the major OSHA hazards in masonry work (falls, silica dust, struck-by, caught-in, electrical) and the corresponding 29 CFR 1926 subparts.

  • Explain silica exposure controls for cutting and grinding masonry, including Table 1 requirements, wet methods, and respiratory protection.

  • Describe scaffold and access requirements for masonry, including capacity, inspection, and fall-protection triggers.

  • Draft a daily safety briefing (toolbox talk) outline for a masonry crew covering hazard recognition and stop-work authority.

Your checkpoint

A hazard-control matrix mapping five masonry tasks to hazards, OSHA citations, and control measures, plus a one-page toolbox talk outline.

Week 8

Codes and Standards & Ethics and Business Practice & Quality Assurance Best Practices

  • Synthesize code, ethics, and QA content into a single integrated review, resolving any conflicting requirements between design, inspection, and business practice.

  • Complete a timed 60-question practice set weighted by domain percentages and score it by domain.

  • Review every missed question, write the correct rule and its source, and re-test those items after 48 hours.

  • Build a final one-page exam-day reference of the highest-risk facts (code section numbers, ASTM designations, OSHA thresholds, ethical principles).

Your checkpoint

A scored practice exam with a domain-by-domain error analysis and a corrected one-page final reference sheet; target at least 80% overall and no domain below 70%.

Milestones

Week 2: Explain, without notes, the difference between TMS 402 and TMS 602 requirements and name at least four ASTM standards invoked by masonry code provisions.

Week 4: Complete a practice bid takeoff and pricing exercise with no arithmetic errors and correctly identify all listed assumptions and exclusions.

Week 6: Present a field QA inspection plan that cites specific acceptance criteria for at least five inspection points and correctly describes grout consolidation.

Week 8: Score at least 80% on a timed 60-question weighted practice exam, with no domain below 70%, and document corrective review for every missed item.