MCAA Masonry study materials
MCAA Masonry study resources

MCAA Masonry key terms

MCAA Masonry · Get comfortable with the vocabulary.

Unit price bid

A bid format where the contractor quotes a fixed cost per unit of work, such as per square foot of wall, so the final contract amount depends on measured quantities actually installed.

Related: Lump sum bid, Quantity takeoff, Change order
Lump sum bid

A single fixed price offered to complete a defined scope of masonry work regardless of minor quantity variation, placing quantity risk largely on the contractor who submits it.

Related: Unit price bid, Quantity takeoff, Bid bond
Quantity takeoff

The systematic counting and measuring of materials and labor from drawings and specifications, producing the material quantities and hours used to price a masonry bid.

Related: Unit price bid, Waste factor, Addendum
Addendum

A written modification to bid documents issued before the bid deadline that changes drawings, specifications, or terms, and which every bidder must acknowledge in the proposal.

Related: Request for information, Quantity takeoff, Bid bond
Bid bond

A surety guarantee submitted with a proposal that obligates the surety to pay the owner a stated penalty if the winning bidder refuses to sign the contract or furnish required bonds.

Related: Performance bond, Payment bond, Lump sum bid
Performance bond

A surety instrument guaranteeing the owner that the contractor will complete the contracted masonry work according to the documents, or the surety will fund completion up to the bond amount.

Related: Bid bond, Payment bond, Retainage
Payment bond

A surety guarantee that protects the owner from mechanics liens by assuring subcontractors, suppliers, and laborers on the masonry project are paid for their furnished work and materials.

Related: Performance bond, Mechanics lien, Retainage
Retainage

A percentage of each progress payment withheld by the owner until substantial or final completion, providing leverage to correct defective masonry work and close out the project.

Related: Schedule of values, Payment bond, Substantial completion
Schedule of values

A line-item breakdown of the contract sum allocating value to each portion of the masonry scope, used as the basis for reviewing and approving monthly progress payment applications.

Related: Retainage, Change order, Substantial completion
Change order

A written agreement signed by owner and contractor that modifies the contract scope, price, or schedule, commonly used when masonry work differs from the original bid documents.

Related: Request for information, Schedule of values, Unit price bid
Request for information

A formal written question submitted to the design team seeking clarification of drawings or specifications, with the answer issued to all bidders or all contractors to keep interpretation consistent.

Related: Addendum, Change order, Shop drawing
Shop drawing

A project-specific detail prepared by the masonry contractor showing dimensions, reinforcement, anchoring, and coursing, submitted to the designer for review before fabrication or installation begins.

Related: Submittal, Request for information, Movement joint
Submittal

The formal package of product data, samples, and drawings the contractor sends to the design professional to demonstrate that proposed materials and methods conform to the specifications.

Related: Shop drawing, Mockup, Quality assurance plan
Mockup

A full-scale sample panel of masonry built on site or off site to establish workmanship standards, verify appearance, and test water penetration before production work begins.

Related: Submittal, Quality assurance plan, Field sample panel
ASTM C90

The standard specification for loadbearing concrete masonry units, setting minimum compressive strength, absorption, and dimensional tolerances for block used in structural and veneer walls.

Related: ASTM C270, Compressive strength, Concrete masonry unit
ASTM C270

The standard specification for mortar for unit masonry, defining mortar types M, S, N, and O by proportions and properties, and stating which type suits which exposure and loading condition.

Related: ASTM C90, Mortar type S, Mortar type N
ASTM C216

The standard specification for facing brick, classifying brick by durability grade and appearance type, and setting absorption and strength limits for exposed exterior masonry walls.

Related: Efflorescence, Mortar type S, Flashing
Mortar type S

A high-bond cement-lime mortar commonly specified for masonry below grade, at parapets, and in other severe exposures, offering good tensile bond strength and moderate compressive strength.

Related: Mortar type N, ASTM C270, Compressive strength
Mortar type N

A medium-strength cement-lime mortar widely used for above-grade exterior walls, balancing bond, flexibility, and compressive strength suited to normal exposed masonry conditions.

Related: Mortar type S, ASTM C270, Movement joint
Concrete masonry unit

A hollow or solid block molded from portland cement, aggregates, and water, cured to specified strength and absorption limits, and the primary building block for reinforced masonry walls.

Related: ASTM C90, Grout, Reinforced masonry
Grout

A high-slump cementitious mixture placed into reinforced block cores or collar joints to bond units, embed reinforcement, and increase wall strength and mass after curing.

Related: Concrete masonry unit, Reinforced masonry, Prism test
Reinforced masonry

Masonry construction in which steel reinforcement is embedded in grouted cores or bed joints so the assembly resists tensile and shear forces in addition to compression.

Related: Grout, Concrete masonry unit, Prism test
Movement joint

A deliberately detailed gap through the masonry wythe or wall that accommodates expansion, contraction, and differential movement, preventing random cracking and distress.

Related: Flashing, Weep hole, Mortar type N
Flashing

Impervious material installed at roof lines, sills, and wall bases to collect water entering the wall and direct it to weep holes and out of the assembly.

Related: Weep hole, Movement joint, Efflorescence
Weep hole

A small opening left in the mortar joint at the base of a cavity wall or above flashing that allows collected moisture to drain out of the wall cavity.

Related: Flashing, Efflorescence, Movement joint
Efflorescence

A white powdery salt deposit on the masonry surface caused by water carrying soluble salts to the face and evaporating, often signaling moisture entry rather than a structural defect.

Related: Flashing, Weep hole, ASTM C216
Prism test

A laboratory or field test of a small masonry assembly built from the project's units and mortar to verify that compressive strength meets the specified design value.

Related: Grout, Reinforced masonry, Compressive strength
Compressive strength

The maximum load a masonry unit, prism, or mortar can carry per unit area before crushing, a core specified property used in structural design and quality verification.

Related: Prism test, ASTM C90, Mortar type S
Quality assurance plan

A written project document defining inspections, tests, submittals, and acceptance criteria the contractor will follow to confirm masonry work meets the specifications.

Related: Mockup, Submittal, Prism test
Field sample panel

A mockup built at the project site using production materials and crews to set the visual and workmanship standard that all subsequent masonry installation must match.

Related: Mockup, Quality assurance plan, Submittal
Substantial completion

The stage when the masonry work is sufficiently finished for the owner to use the project for its intended purpose, triggering warranty periods and release of most retainage.

Related: Retainage, Schedule of values, Mechanics lien
Mechanics lien

A statutory claim filed against a property by contractors, subcontractors, or suppliers who were not paid for labor or materials furnished to improve it.

Related: Payment bond, Retainage, Substantial completion
Bid shopping

The unethical practice of disclosing one subcontractor's price to competitors to obtain a lower number, undermining fair competition and trust among bidders.

Related: Bid bond, Lump sum bid, Quantity takeoff
Scope gap

Work required by the contract documents but omitted from a bidder's price or assumed to be another trade's responsibility, a frequent source of disputes after award.

Related: Quantity takeoff, Addendum, Change order
Waste factor

A percentage added to calculated material quantities to cover breakage, cutting, and offcut loss, applied during estimating so purchased units exceed theoretical takeoff amounts.

Related: Quantity takeoff, Lump sum bid, Unit price bid
Scaffold

A temporary elevated platform and its supporting structure erected to give masons and laborers safe access to work areas above ground level.

Related: Fall protection, Competent person, Personal protective equipment
Fall protection

Systems and practices, including guardrails, personal fall arrest, and safe work platforms, that prevent workers from falling from elevations such as scaffolds and wall tops.

Related: Scaffold, Personal protective equipment, Competent person
Competent person

An individual designated by the employer who, through training and experience, is authorized to identify hazards and take prompt corrective action at the masonry work site.

Related: Fall protection, Scaffold, Personal protective equipment
Personal protective equipment

Employer-provided gear such as hard hats, safety glasses, gloves, and respirators worn by masonry workers to reduce exposure to struck-by, chemical, and dust hazards.

Related: Competent person, Silica dust exposure, Fall protection
Silica dust exposure

Inhalation of crystalline silica particles released when cutting, grinding, or sawing masonry, controlled through wet cutting, ventilation, and approved respiratory protection.

Related: Personal protective equipment, Competent person, Concrete masonry unit