  • Casing must extend at least 50 ft below grade and be grouted to a minimum depth of 50 ft; where the first confining layer is deeper, grout must extend at least 10 ft into that confining unit.

  • Minimum annular grout thickness is 1.5 in. for boreholes up to 10 in. diameter and 2 in. for larger boreholes; neat cement or bentonite grout is required, and drill cuttings or native material may not be used as grout.

  • A well must terminate at least 10 ft from a property line, 50 ft from a septic tank or absorption field, 100 ft from a sewage lagoon or manure storage, and 25 ft from a building foundation unless the casing is grouted to the required depth.

  • The well casing must be new steel meeting ASTM A53 or A589, or NSF/ANSI 14 PVC, with minimum wall thickness of 0.188 in. for steel and SDR 21 or heavier for PVC.

  • A pitless adapter must be installed with the discharge line below the frost line (typically 42-48 in. in Maryland) and the casing must be sealed watertight at the adapter.

  • Static water level is the level of water in a well when the pump is off and equilibrium is reached; pumping water level is measured while the pump is running at design capacity.

  • Drawdown equals pumping water level minus static water level; specific capacity equals pumping rate divided by drawdown, expressed in gallons per minute per foot (gpm/ft).

  • A well must be capped with a sanitary well seal and a vent that is screened and turned downward, with the vent opening at least 18 in. above grade.

Quick reference

Well Drilling Methods and Equipment

  • Rotary air drilling is preferred in hard rock; foam or water injection controls dust and stabilizes the borehole where air alone causes caving.

  • Mud rotary drilling uses bentonite or polymer mud to cool the bit, carry cuttings, and maintain hydrostatic pressure against formation fluids; mud weight is monitored to prevent blowout.

  • Cable tool (percussion) drilling uses a heavy bit and a bailer; it is suited to unconsolidated sand and gravel and produces a clean borehole but slower penetration in hard rock.

  • Auger drilling (flight or bucket) is limited to unconsolidated materials above the water table; hollow-stem augers can drill below the water table with a plug and casing.

  • Air rotary hammer drilling uses a down-the-hole hammer for hard rock; penetration rate depends on air volume (cfm), bit pressure, and rock hardness.

  • Reverse circulation drilling pumps fluid down the annulus and up the drill pipe, allowing large-diameter holes and continuous sample recovery.

  • Bit selection: tricone roller bits for soft to medium formations, drag bits for soft clay and sand, and diamond or button bits for hard rock.

  • Drilling fluid velocity in the annulus must exceed the settling velocity of cuttings; insufficient uphole velocity causes cuttings to accumulate and the drill string to stick.

Quick reference

Well Development, Testing, and Disinfection

  • Well development removes drilling fluid and fines from the formation near the borehole; methods include surging, jetting, air-lifting, and overpumping.

  • Development is complete when the discharge is clear, sand content is below 5 ppm, and specific capacity stabilizes.

  • A yield (pump) test should run at a constant rate for at least 2 hours, or until drawdown and pumping level stabilize, with measurements recorded every 15-30 minutes.

  • A step-drawdown test uses successively higher pumping rates to determine well efficiency and the well-loss coefficient; specific capacity declines as the rate increases.

  • Disinfection requires a chlorine concentration of at least 50 mg/L (ppm) in the well, with a contact time of at least 12 hours, before the well is put into service.

  • Chlorine demand of the formation and casing reduces free chlorine; the dose must be checked and re-established if free chlorine falls below 50 mg/L during contact time.

  • After disinfection, the well must be pumped to waste until the chlorine residual is gone and the water is clear before sampling for coliform bacteria.

  • A bacteriological sample must be collected in a sterile container, transported chilled, and analyzed within 30 hours of collection for total coliform and E. coli.

Quick reference

Maryland Well Regulations and Licensing Law

  • The Maryland Department of the Environment (MDE) regulates well construction under COMAR 26.04.04; a permit from the local health department is required before drilling a new well.

  • A Maryland Well Driller license is issued by the State Board of Well Drillers; a journeyman or master driller must be on site or directly supervise the work.

  • Well completion reports must be filed with MDE within 30 days of completion, documenting location, depth, casing, grout, yield, and static water level.

  • A notice of intent to drill must be filed with MDE at least 3 business days before drilling begins; emergency repairs may proceed with notice within 24 hours.

  • The Board may suspend or revoke a license for gross negligence, falsifying a completion report, or abandoning a well without proper sealing.

  • A well that is no longer in use must be properly abandoned: the casing is removed or perforated, the borehole is filled with grout or approved material, and a report is filed with MDE.

  • Continuing education is required for license renewal; the Board sets the credit hours and approves the courses.