MD Well Driller study plan
MD Well Driller · Give each week a clear focus.
8 weeks · About 6 hours per week
Water Supply and Well Construction & Maryland Well Regulations and Licensing Law
Map the four exam domains to their weightings and rank your personal weak spots before studying anything else
List every component of a drilled well (casing, screen, grout, annular seal, well cap, pitless adapter) and state the function of each in one sentence
Locate the Maryland well construction regulations governing casing depth, grout placement, and annular seal requirements and annotate each requirement with the article or section number
Define the difference between a domestic, public water supply, and monitoring well under Maryland law and note which rules attach to each
Your checkpoint
A one-page annotated well-component diagram with each part tied to its Maryland construction requirement and citation
Water Supply and Well Construction & Well Drilling Methods and Equipment
Explain how overburden and bedrock geology determine casing depth, screen selection, and open-hole versus screened completion
Compare rotary, air rotary, cable tool, and hollow-stem auger methods on hole stability, sample quality, and the formations each suits
Calculate annular volume for a given borehole and casing diameter to determine grout quantity for a set depth
Identify the causes of lost circulation, sand production, and formation collapse and describe the standard remedy for each
Your checkpoint
A grout-volume calculation worksheet solved for five different borehole/casing diameter combinations at a specified depth
Well Drilling Methods and Equipment & Maryland Well Regulations and Licensing Law
Trace the well permitting sequence in Maryland from application through final approval, naming the forms and the approving authority at each step
Describe the driller's notification and recordkeeping duties, including when the well completion report must be filed and what it must contain
Diagram a drilling rig's circulation system and label the pump, swivel, kelly or top drive, drill string, bit, and cuttings return path
List the safety hazards specific to each drilling method and the control for each
Your checkpoint
A one-page permit-to-completion flowchart with the required report contents listed at the final step
Water Supply and Well Construction & Well Drilling Methods and Equipment
Design a complete well for a stated scenario: given yield target, depth to bedrock, and water quality, select casing, screen, gravel pack, and grout specifications
Justify each design choice by citing the governing Maryland requirement or accepted industry practice
Compute the minimum casing length and grout interval required for a well completed in fractured bedrock
Identify three common construction defects that show up on inspection and explain how each is detected
Your checkpoint
A written well design package for one scenario with a cited justification for every specification
Well Development, Testing, and Disinfection
Distinguish well development methods (surging, jetting, air lifting, bailing, dispersants) by the formation and screen type each suits
Explain how to judge when development is complete using turbidity, sand content, and specific capacity trends
Calculate specific capacity from drawdown and pumping rate data and interpret what a low value indicates about the well
Outline a step-drawdown or constant-rate pumping test: duration, measurements, and the data recorded at each interval
Your checkpoint
A completed development and pump test data sheet with specific capacity calculated and a written interpretation of the result
Well Development, Testing, and Disinfection & Maryland Well Regulations and Licensing Law
Sequence the disinfection procedure for a new or repaired well: calculated chlorine dose, contact time, and the flushing step
State the Maryland and standard bacteriological sampling requirements, including who may collect the sample and how it is handled before analysis
List the required contents of a well completion report and cross-check your Week 4 design package against them
Describe the procedure for abandoning a well and the materials and sealing requirements Maryland imposes
Your checkpoint
A written disinfection and sampling protocol for one well, including the chlorine dose calculation and the abandonment procedure summary
Maryland Well Regulations and Licensing Law
Summarize the Maryland licensing framework: license categories, experience and examination requirements, renewal cycle, and continuing education obligations
List the grounds for disciplinary action and the consequences of drilling without a license or violating a construction standard
Explain the driller's duty to notify the property owner and the regulating authority at each stage of a well's life
Resolve five short regulatory scenarios by identifying the controlling rule and the correct action
Your checkpoint
A regulatory quick-reference sheet covering licensing, notification duties, and violations, with citations
Water Supply and Well Construction & Well Drilling Methods and Equipment & Well Development, Testing, and Disinfection & Maryland Well Regulations and Licensing Law
Take one full-length timed practice exam under exam conditions and score it by domain
Review every missed question and write the underlying rule or principle it tested
Re-drill your two weakest domains using your own notes and the annotated diagrams from earlier weeks
Recite the key formulas (annular volume, specific capacity, chlorine dose) from memory and verify each against your reference sheet
Your checkpoint
A scored practice exam with a written error log and a final one-page formula and citation sheet
Milestones
Week 2: Can explain, without notes, how geology drives casing and screen selection and can compute annular grout volume correctly for a new borehole size
Week 4: Can produce a fully cited well design for an unfamiliar scenario in under 45 minutes
Week 6: Can state the disinfection dose and contact time, the sampling requirements, and the completion report contents from memory
Week 8: Scores at least 80 percent overall on the timed practice exam with no domain below 70 percent