MD Well Driller study materials
MD Well Driller study resources

MD Well Driller flashcards

MD Well Driller · Build recall with a focused review session.

31 cards. Read the term and the definition here. The deck at the top of this page is optional.

Static water level
The level of water in a well when the pump has been off long enough for the water level to stabilize. It is measured from a reference point at the top of the casing.
Pumping water level
The water level in a well while the pump is operating at a constant rate after drawdown has stabilized. It is used with static level to compute drawdown.
Drawdown
The difference between the static water level and the pumping water level, measured in feet. It increases with pumping rate and reflects the cone of depression around the well.
Specific capacity
The pumping rate divided by drawdown, expressed in gallons per minute per foot. It measures well efficiency and declines as pumping rate increases.
Grout minimum thickness
The annular space must be grouted with a minimum thickness of 1.5 inches for boreholes up to 10 inches in diameter and 2 inches for larger boreholes.
Sanitary well seal
A watertight cap at the top of the casing that excludes surface water and insects. It must include a screened vent turned downward and openings for the pump and drop pipe.
Pitless adapter
A fitting that carries the discharge line through the casing below the frost line, allowing the pump to be removed without a pit. It must seal the casing watertight.
Casing material standards
Well casing must be new steel meeting ASTM A53 or A589, or NSF/ANSI 14 PVC, with minimum steel wall thickness of 0.188 inch and PVC of SDR 21 or heavier.
Setback from septic system
A well must be at least 50 feet from a septic tank or absorption field and 100 feet from a sewage lagoon or manure storage to protect the water supply from contamination.
Rotary air drilling
A drilling method that uses compressed air to cool the bit and lift cuttings. It works well in hard rock but needs foam or water where the formation caves.
Mud rotary drilling
A method that circulates bentonite or polymer drilling fluid to cool the bit, remove cuttings, and hold back formation fluids. Mud weight is monitored to prevent blowout.
Cable tool drilling
A percussion method using a heavy bit and bailer to break and remove rock. It is suited to unconsolidated sand and gravel and produces a clean borehole.
Hollow-stem auger
A flight auger with a hollow center and removable plug that allows drilling below the water table and installation of casing or sampling tools through the stem.
Down-the-hole hammer
A pneumatic hammer located at the bottom of the drill string that delivers high-frequency impacts to hard rock. Penetration depends on air volume and bit pressure.
Reverse circulation drilling
A method that pumps drilling fluid down the annulus and up the drill pipe, carrying cuttings upward inside the pipe. It allows large-diameter holes and continuous samples.
Tricone roller bit
A rotary bit with three rotating cones fitted with hardened teeth or inserts. It is used for soft to medium formations and is common in mud rotary drilling.
Annular velocity
The upward speed of drilling fluid in the space between the drill pipe and borehole wall. It must exceed the settling velocity of cuttings to prevent them from accumulating.
Well development
The process of removing drilling fluid and fine particles from the formation around the screen using surging, jetting, air-lifting, or overpumping to improve yield.
Development completion criteria
Development is complete when the discharge runs clear, sand content falls below 5 parts per million, and specific capacity has stabilized.
Constant-rate pump test
A test that pumps a well at a steady rate for at least two hours while recording water levels. It determines yield, drawdown, and specific capacity.
Step-drawdown test
A test that pumps a well at successively higher rates to separate formation loss from well loss. It is used to estimate well efficiency and the well-loss coefficient.
Chlorine disinfection dose
A new or repaired well must be disinfected with at least 50 milligrams per liter of chlorine and held for a contact time of at least 12 hours before use.
Chlorine demand
The amount of chlorine consumed by the formation, casing, and organic matter before a free residual remains. The dose must be checked during contact time.
Bacteriological sample handling
Samples are collected in sterile containers, chilled during transport, and analyzed within 30 hours of collection for total coliform and E. coli.
Pumping to waste after disinfection
After the contact time, the well is pumped to waste until the chlorine residual is gone and the water runs clear, before a bacteriological sample is collected.
MDE well permit
A permit from the local health department, under Maryland Department of the Environment rules in COMAR 26.04.04, must be obtained before drilling a new well.
Well completion report
A report filed with the Maryland Department of the Environment within 30 days of completion that records location, depth, casing, grout, yield, and static water level.
Notice of intent to drill
A notice filed with the Maryland Department of the Environment at least 3 business days before drilling begins, except emergency repairs, which require notice within 24 hours.
State Board of Well Drillers
The Maryland board that issues well driller licenses and may suspend or revoke a license for gross negligence, falsified reports, or improper well abandonment.
Well abandonment
A process that removes or perforates the casing, fills the borehole with grout or approved material, and files a report with the Maryland Department of the Environment.
License renewal requirements
A Maryland well driller license must be renewed with continuing education credit hours approved by the State Board of Well Drillers, along with required insurance and bond.