Governor tripping speed range
Car governor tripping speed is set between 115% and 140% of rated speed, and must not exceed the A17.1 table value for that rated speed. Verify with a tachometer during annual testing.
Rope safety factor
A17.1 requires at least 12 for traction elevators above 50 ft/min and at least 16 for drum machines. The factor is the rope breaking strength divided by the maximum static load.
Traction ratio formula
Traction ratio equals total load on the sheave divided by the lesser rope tension. A 1:1 roping gives 1, 2:1 gives 2, and higher ratios reduce rope load while doubling rope travel.
Synchronous speed formula
Synchronous speed in rpm equals 120 times frequency in hertz divided by the number of poles. A 4-pole motor on 60 Hz has a synchronous speed of 1800 rpm.
Percent slip calculation
Percent slip equals synchronous speed minus measured speed, divided by synchronous speed, times 100. NEMA Design B motors typically run 2 to 4 percent slip at rated load.
Hydraulic relief valve setting
The relief valve must open at no more than 150% of full-load pressure. Test with the car at rest and loaded, and record the opening pressure on the maintenance record.
Hydraulic speed relation
Rated speed equals pump flow divided by plunger area. Doubling plunger area halves speed at the same flow, which is why cylinder diameter and pump displacement must be matched.
Oil buffer threshold
Oil buffers are required for rated speeds above 200 ft/min; spring buffers are permitted below that. Buffer stroke must match the A17.1 table for the rated speed.
Brake rated holding capacity
The brake must hold 125% of rated load. It is spring-set and power-released, so loss of electrical or hydraulic power applies the brake, not releases it.
Five-year safety test
Every five years the safety device is tested at 125% of rated load, along with a full-load test of the machine and brake. Record stopping distance and even safety engagement.
Escalator maximum rise
A single escalator unit may not exceed 60 ft (18.3 m) of rise. Speed is limited to 125 ft/min above 20 ft rise and 100 ft/min at or below 20 ft.
Car minimum clear height
Clear inside car height must be at least 7 ft (2.13 m). Car doors must be at least 6 ft 8 in (2.03 m) high with an unobstructed clear opening.
Car emergency lighting duration
Emergency lighting must provide at least 5 ft-candles at the car threshold for 4 hours. Normal car lighting must give at least 2 ft-candles at the floor with doors closed.
Machine room door requirements
Access doors must be self-closing, self-locking, open outward, and measure at least 30 in wide by 6 ft 8 in high. The room must be kept locked against unauthorized entry.
Three-phase power formula
Real power in watts equals 1.732 times line voltage times line current times power factor. Use this to size feeders and confirm motor branch-circuit capacity.
Across-the-line inrush current
Direct-on-line starting draws roughly six times nameplate full-load current. Wye-delta and reduced-voltage starters cut inrush but also reduce starting torque.
NEMA AC-3 contactor rating
AC-3 is the utilization category for squirrel-cage motor starting. Size contactors by horsepower rating and category, not by amp rating alone.
VFD shielded cable grounding
Shielded motor cable must be grounded at the drive end. Long unshielded runs cause reflected-wave overvoltage at motor terminals and damage insulation.
Suspension rope minimum count
Traction elevators require at least three suspension ropes, each independently terminated and equalized. Fiber-core ropes are not permitted for traction suspension.
Sheave-to-rope diameter ratio
Traction sheave diameter must be at least 40 times the rope diameter. Smaller ratios accelerate fatigue and require more frequent rope inspection and replacement.
Counterweight balance point
The counterweight equals car weight plus roughly 40 to 50 percent of rated load. This balances tension so the machine sees near-equal loads up and down.
Instantaneous safety speed limit
Instantaneous safeties are permitted only below about 200 ft/min for cars. Above that, type A or type B progressive safeties are required to limit deceleration.
Governor rope minimum diameter
The governor rope must be at least 1/4 in (6.4 mm) in diameter and properly tensioned so the governor trips before the car reaches the pit buffers.
Final limit switch function
Final limit switches are independent of normal limits and must open the power circuit before the car or counterweight reaches the buffer, preventing overtravel damage.
Annual hydraulic test items
Annual tests include the safety device with rated load, governor tripping speed, buffer test, brake test, and relief valve test on hydraulic units. Record all measured values.
Escalator skirt clearance
Step-to-skirt clearance must not exceed 3/16 in per side. Also check comb teeth engagement, handrail speed, and stop switch operation during inspection.
Michigan licensing authority
The Elevator Safety Board within LARA issues mechanic and contractor licenses and adopts ASME A17.1 and A17.3 by reference. Unlicensed work carries civil penalties.
Michigan certificate of operation
A certificate of operation must be posted in the car or machine room and renewed annually after inspection. The owner arranges and pays for periodic inspections.
Michigan permit requirement
A permit is required before installing or altering an elevator. The contractor submits plans, and the state inspects before the unit is placed in service.
OSHA fall protection trigger
General industry requires fall protection at 4 ft; construction at 6 ft. Hoistway work uses a full-body harness with a rated anchor of 5,000 lb per worker.
Sling angle capacity reduction
Sling capacity drops with angle from horizontal. At 30 degrees, capacity is 50 percent of the vertical rating; at 60 degrees it is about 87 percent.
Lockout/tagout requirement
Under 29 CFR 1910.147, isolate all energy sources, verify zero energy, and apply personal locks before working in the hoistway or machine room.