MI Roofing Contractor study materials
MI Roofing Contractor study resources

MI Roofing Contractor cheat sheet

MI Roofing Contractor · Keep the key ideas within reach.

Quick reference

Roofing Systems

  • Slope = rise ÷ run, expressed as rise per 12 horizontal units; a 4:12 roof rises 4 inches for every 12 inches of run.

  • Pitch multiplier for rise r per 12 = √(12² + r²) ÷ 12; sloped roof area ≈ plan area × pitch multiplier.

  • Roofing squares = roof area in square feet ÷ 100; order bundles, underlayment, and accessories by squares plus waste.

  • Asphalt shingles are limited to slopes of 2:12 or steeper; 2:12 to 4:12 requires double underlayment, and slopes below 2:12 require a low-slope membrane.

  • Attic ventilation net free area is at least 1/150 of attic floor area; 1/300 is permitted with a vapor retarder and balanced intake and exhaust.

  • Ice barrier membrane at eaves extends at least 24 inches inside the exterior wall line in cold climates.

  • Low-slope membranes include EPDM, TPO, PVC, and modified bitumen; steep-slope coverings include asphalt shingles, metal, tile, and wood shakes.

  • Balanced ventilation uses about 50% intake at soffits and 50% exhaust at ridge or static vents.

Quick reference

Materials and Components

  • Asphalt shingles consist of a fiberglass mat, asphalt coating, and mineral granules; the mat provides tensile strength and granules shield asphalt from UV.

  • Underlayment is No. 15 asphalt felt or a synthetic membrane; ice-and-water shield is self-adhering and used at eaves, valleys, and vulnerable edges.

  • Roofing nails are typically 11–12 gauge with heads at least 3/8 inch; fastener length must penetrate the deck at least 3/4 inch or through the sheathing.

  • Drip edge is corrosion-resistant metal at eaves and rakes; at eaves it goes under the underlayment, and at rakes it goes over the underlayment.

  • Step flashing is L-shaped metal installed at sidewalls and chimneys in courses that overlap the shingle course and the one below.

  • Valley flashing may be open metal, closed-cut, or woven; open metal valleys are required by some covering manufacturers and carry high runoff.

  • Galvanic corrosion occurs when dissimilar metals contact moisture; aluminum, copper, and galvanized steel must be separated or matched compatibly.

  • Low-slope single-ply membranes are seamed by adhesive, tape, or heat welding; seam strength and compatibility with cleaners matter.

Quick reference

Roof Installation

  • Deck sheathing must be sound, properly fastened, and free of large gaps; replace deteriorated panels before installing underlayment.

  • Asphalt felt underlayment laps 2 inches on sides and 4 inches at ends; upper courses overlap lower courses to shed water downslope.

  • Ice-and-water shield is installed at eaves before underlayment and extends at least 24 inches inside the warm wall line.

  • At eaves, drip edge is installed under the underlayment; at rakes, drip edge is installed over the underlayment.

  • Starter strip is installed along eaves and rakes before the first full shingle course to seal edges and improve wind resistance.

  • Fasteners for asphalt shingles are driven flush, not overdriven, and placed per manufacturer; high-wind areas often require six nails per shingle.

  • Step flashing is woven with each shingle course at walls; counterflashing covers the top edge and is embedded in the wall.

  • Valley flashing is installed before field shingles and must extend under shingles on both sides of the valley.

  • Ridge and hip caps cover the peak and intersections; they are fastened per manufacturer and overlapped to shed water.

Quick reference

Repair and Replacement Practices

  • Replacement is favored when shingles are brittle, granule loss is widespread, leaks are multiple, or decking is soft; isolated damage may be repaired.

  • Repair areas must integrate new underlayment and flashing with existing layers so water still sheds downslope.

  • Leak diagnosis starts uphill of the stain and checks penetrations, valleys, wall intersections, chimneys, and fasteners first.

  • Ice dams are addressed by air sealing, added insulation, and ventilation; roof-side measures include ice barrier and eave flashing.

  • Emergency tarping must secure the cover without creating new holes; remove or replace the tarp before permanent repair.

  • Overlaying new shingles over old is limited by code and manufacturer; tear-off is required when existing layers are damaged or exceed allowed layers.

  • Flashing repairs often require removing shingles around the penetration, replacing the boot or step flashing, and resealing only as a secondary measure.

  • Tear-off waste weight varies by covering; asphalt shingles are heavy, so dumpster size and load limits must be planned.

Quick reference

Building Codes, Standards and Permit Requirements

  • The Michigan Residential Code governs one- and two-family dwellings and townhouses; the Michigan Building Code governs commercial and multi-family construction.

  • A permit is generally required for roof replacement or alteration; ordinary repairs may be exempt, and the local authority having jurisdiction makes the final determination.

  • Inspections commonly cover deck condition, underlayment, flashing, and final roof covering; required inspection stages vary by jurisdiction.

  • Asphalt shingle attachment must follow the manufacturer's printed instructions and code requirements for wind resistance.

  • Ice barrier is required at eaves where the average January temperature is 25°F or lower; most Michigan locations meet this threshold.

  • Attic ventilation must provide net free area per code; intake and exhaust vents must be balanced and unobstructed by insulation.

  • Michigan does not issue a separate roofing license; residential contractors generally need a Residential Builder or Maintenance and Alteration Contractor license.

  • Permit applications commonly require proof of license and certificate of insurance for the contractor and subcontractors.

  • Energy code provisions address insulation, air sealing, and duct sealing in the attic, which affect roof performance and ice-dam risk.

Quick reference

Business Management

  • Break-even revenue = fixed overhead ÷ gross margin percentage; it is the sales level at which profit is zero.

  • Markup = margin ÷ (1 − margin); a 25% margin equals a 33.3% markup on cost.

  • Labor burden = payroll taxes + workers compensation + insurance + benefits; add it to base wage to get true labor cost per hour.

  • Gross profit = revenue − direct job costs; net profit = gross profit − overhead.

  • Job costing compares actual labor, material, equipment, and subcontractor costs against the estimate for each project.

  • Overhead includes office rent, vehicles, insurance, marketing, and management salaries; it is not charged directly to a single job.

  • Cash flow improves when deposits, progress billings, and final payments are tied to defined project milestones.

  • Accounts receivable days = (accounts receivable ÷ annual credit sales) × 365; lower days indicate faster collection.

Quick reference

Estimating and Contract Law

  • Roof takeoff quantities include field area in squares, eave and rake length, valleys, ridges, penetrations, and flashing linear feet.

  • Waste factor is added to field quantities; common shingle waste is 10% to 15%, higher for complex roofs with many hips and valleys.

  • Squares = measured roof area ÷ 100; bundle coverage varies by shingle type and must be confirmed from the manufacturer's label.

  • A written contract should define scope, price, payment schedule, change-order procedure, warranty, and cancellation rights.

  • Change orders should be written and signed before extra work begins; they should state price and schedule impact.

  • Construction lien rights depend on statutory notices and recording deadlines; missing a deadline can waive the lien.

  • Workmanship warranties cover installation defects, while manufacturer warranties cover material defects; both have exclusions and duration limits.

  • Bids should state inclusions and exclusions, such as deck replacement, permits, dumpster, and ice-and-water shield.

Quick reference

Job Site Safety and Fall Protection

  • OSHA construction fall protection is required at 6 feet or more above a lower level; options include guardrail systems, safety nets, and personal fall arrest.

  • Personal fall arrest systems use a full-body harness, lanyard, and anchor rated at 5,000 pounds per worker or designed by a qualified person.

  • Extension ladders are set at about a 4:1 angle and extend 3 feet above the landing; they must be secured against movement.

  • Scaffold guardrails are typically 42 inches high with a midrail at about 21 inches and toe boards; fall protection is required at 10 feet.

  • Roof edge protection may include guardrails, warning lines, or safety monitors depending on the task and fall distance.

  • MIOSHA construction safety standards follow federal OSHA requirements for fall protection, ladders, scaffolds, and training.

  • Workers must be trained on fall hazards, equipment inspection, and rescue procedures before using personal fall arrest.

  • High winds, lightning, and wet roofs increase fall and material-handling hazards; materials must be secured against wind uplift.