MI Roofing Contractor study plan
MI Roofing Contractor · Give each week a clear focus.
8 weeks · About 7 hours per week
Roofing Systems, Materials and Components
Distinguish steep-slope from low-slope systems and state the minimum slope for each material family
Match at least 8 membrane and covering types (asphalt shingle, metal, clay/concrete tile, TPO, EPDM, PVC, modified bitumen, built-up) to their permitted slope ranges and typical applications
Identify the function of each component in a steep-slope assembly: deck, underlayment, ice barrier, drip edge, valley lining, ridge vent, flashing
Define 25 core roofing terms (square, exposure, headlap, pitch vs slope, NFA, counterflashing, cricket) in your own words
Your checkpoint
A one-page comparison matrix covering 10 materials with slope range, expected service life, wind/fire classification, and relative cost tier, plus a 15-question self-quiz scored at 80% or better
Roofing Systems, Materials and Components & Roof Installation, Repair and Replacement Practices
Differentiate step, apron, counter, valley, and cricket flashing and assign each to the correct roof location
Calculate net free vent area for a given attic footprint using the 1/150 and 1/300 ratios and split intake-to-exhaust correctly
Sequence a steep-slope installation from deck preparation through ridge cap
List manufacturer limits on fastener type, length, penetration, and nailing pattern for shingle and single-ply attachment
Your checkpoint
A hand-sketched, fully labeled gable-roof section showing every flashing location, vent type, and underlayment overlap, checked against a 15-item rubric
Roof Installation, Repair and Replacement Practices
Sequence a tear-off and re-roof, including deck inspection, dry-in, and disposal staging
Diagnose six common leak and defect conditions from written symptom descriptions and prescribe the repair method
Convert roof dimensions into squares and compute bundle, underlayment roll, drip edge, ridge cap, and fastener quantities with a waste factor
Compare repair versus replacement decision criteria using age, deck condition, and extent of damage
Your checkpoint
A complete takeoff worksheet for a hypothetical 30-square gable roof that lands within 5% of the answer key on every line item
Roof Installation, Repair and Replacement Practices & Building Codes, Standards and Permit Requirements
Locate code provisions governing underlayment, flashing, ice barrier, and fastening and apply them to three worked scenarios
Outline the permit submittal process and identify the inspection hold points for a residential re-roof
Explain how to resolve a conflict between manufacturer instructions and code minimums
Review and correct the errors you made on the week 1-3 quizzes
Your checkpoint
A 40-question mixed quiz on Domains 1 and 2 scored at 75% or better, plus a one-page permit and inspection checklist
Building Codes, Standards and Permit Requirements
Interpret code text on slope-to-underlayment requirements and select the correct assembly for four given roof slopes
Identify fire classification, edge clearance, and ventilation requirements that affect material selection
Describe which changes during a job trigger a re-inspection or a revised permit
Distinguish code minimums from manufacturer requirements from warranty conditions when they differ
Your checkpoint
A 25-question code quiz scored at 80% or better and a citation sheet listing 10 code sections with a one-line plain-language summary of each
Business Management, Estimating and Contract Law
Build a bid from labor, material, equipment, overhead, contingency, and profit, and distinguish markup from gross margin
Compute break-even and selling price for three jobs using different overhead and margin inputs
Identify the elements required for an enforceable contract and the purpose of change orders, lien notices, and written warranties
Draft payment terms, scope exclusions, and a change-order clause for a sample project
Your checkpoint
A written estimate for one hypothetical job showing overhead at 15%, profit at 10%, and contingency at 5%, plus a one-page contract checklist with 12 required items
Job Site Safety and Fall Protection
Apply fall protection trigger heights and duty thresholds to decide when guardrails, safety nets, warning lines, or personal fall arrest are required
Select, inspect, and don personal fall arrest components and calculate total fall distance including lanyard, deceleration, and safety factor
Identify ladder placement, roof edge, skylight, and staging hazards and the control for each
Explain the components of a written fall protection plan and the roles of a competent person
Your checkpoint
A one-page written fall protection plan for a re-roof on a 6:12 pitch, covering anchor points, warning lines, ladder tie-off, and rescue, scored against a 12-point rubric
Roofing Systems, Materials and Components & Roof Installation, Repair and Replacement Practices & Building Codes, Standards and Permit Requirements & Business Management, Estimating and Contract Law & Job Site Safety and Fall Protection
Retake every domain quiz and log each missed item by domain and error type
Re-study only the two weakest domains using your own reference sheets
Complete a full-length timed practice exam under test conditions
Consolidate each domain into a single page of notes you can review in the final 48 hours
Your checkpoint
A full-length timed practice exam scored at 80% or better, with a written error log showing every missed item re-answered correctly
Milestones
Week 2: Material comparison matrix and labeled roof section both complete and self-scored at 80% or better on the rubric
Week 4: 40-question Domains 1-2 quiz passed at 75% or better and takeoff worksheet within 5% of the answer key
Week 6: Code quiz passed at 80% and the written estimate math verified line by line with no arithmetic errors
Week 8: Full-length timed practice exam passed at 80% or better with an error log showing all missed items corrected