MI Roofing Contractor study materials
MI Roofing Contractor study resources

MI Roofing Contractor flashcards

MI Roofing Contractor · Build recall with a focused review session.

32 cards. Read the term and the definition here. The deck at the top of this page is optional.

Roof slope formula
Slope is rise divided by run, expressed as inches of vertical rise per 12 inches of horizontal run; for example, 4:12 means 4 inches rise per 12 inches run.
Pitch multiplier
For a roof with rise r per 12, the pitch multiplier is the square root of (12² + r²) divided by 12; multiply plan area by it to estimate sloped area.
Roofing square
A roofing square is 100 square feet of roof surface. Divide total roof area in square feet by 100 to determine the number of squares for ordering.
Net free vent area
Attic ventilation requires net free vent area of at least 1/150 of the attic floor area; 1/300 is allowed when a vapor retarder and balanced intake and exhaust vents are installed.
Asphalt shingle composition
Fiberglass mat saturated and coated with asphalt, then surfaced with mineral granules; the mat provides strength and granules protect asphalt from ultraviolet light.
Ice-and-water shield
A self-adhering waterproof membrane installed at eaves and valleys; it seals around fasteners and resists ice-dam backup. It extends at least 24 inches inside the exterior wall line.
Galvanic corrosion
Dissimilar metals in contact with moisture can create an electrical current that corrodes one metal; avoid joining aluminum and copper or use compatible separators.
Drip edge function
A corrosion-resistant metal flashing at roof edges that directs water away from fascia and into gutters, protecting sheathing and siding from water damage.
Underlayment lap
Asphalt felt underlayment is lapped at least 2 inches on sides and 4 inches at ends, with upper layers overlapping lower layers so water sheds downslope.
Step flashing
L-shaped metal pieces woven with siding and shingles at sidewalls and chimneys; each piece overlaps the one below to shed water away from the wall.
Starter strip
A first row of shingles or purpose-made starter at eaves and rakes that seals shingle edges and helps resist wind uplift; it is installed before the first full course.
Valley flashing
Metal or membrane lining in a roof valley that carries concentrated runoff; it is installed before shingles and must extend under shingles on both slopes.
Repair versus replacement
Replacement is indicated when leaks are widespread, shingles are brittle or losing granules, or decking is damaged; isolated defects can be repaired.
Ice dam cause
Ice dams form when warm attic air melts snow that refreezes at the cold eave; water backs up under shingles. Fix by air sealing, insulation, and ventilation.
Emergency roof tarp
A temporary cover secured over a leak to prevent further water entry; fasten without creating new holes and remove or replace before permanent repair.
Flashing leak diagnosis
Check wall intersections, valleys, penetrations, and chimneys first; most leaks originate at flashings or fasteners rather than the field of shingles.
Michigan Residential Code
The state code for one- and two-family dwellings and townhouses, based on the International Residential Code with Michigan amendments; it governs roofing, ventilation, and energy provisions.
Roof replacement permit
Most Michigan local building departments require a permit before replacing a roof covering; ordinary repairs may be exempt, so verify with the authority having jurisdiction.
Ice barrier code trigger
The residential code requires an ice barrier at eaves where the average January temperature is 25°F or lower, which includes most of Michigan.
Michigan roofing license
Michigan does not issue a separate roofing license; residential roofing contractors generally need a Residential Builder or Maintenance and Alteration Contractor license from the state licensing agency.
Break-even revenue
Fixed costs divided by gross margin percentage gives the sales revenue needed to cover overhead before profit; it helps set minimum monthly sales targets.
Markup versus margin
Margin is profit divided by selling price; markup is profit divided by cost. Convert margin to markup with markup = margin ÷ (1 − margin).
Labor burden
The extra cost above base wages, including payroll taxes, workers compensation, insurance, and benefits; add it to hourly wage when estimating labor cost.
Job costing
Tracking actual labor, material, equipment, and subcontractor costs by project; comparing actual to estimated costs reveals profit or loss on each job.
Roof takeoff
A quantity survey of roof areas, edges, valleys, penetrations, and flashings, converted to squares and linear feet; add waste and accessories before pricing.
Written change order
A signed document describing a scope change, its price, and schedule effect before work proceeds; it prevents disputes and supports payment for extra work.
Workmanship warranty
A contractor's written promise to repair installation defects for a stated period; it is separate from manufacturer material warranties and should define exclusions.
Construction lien
A legal claim against property for unpaid labor or materials; contractors must follow statutory notice and recording deadlines to preserve the right.
Fall protection threshold
OSHA construction rules generally require fall protection when workers are exposed to falls of 6 feet or more, using guardrails, nets, or personal fall arrest.
Ladder setup angle
Set extension ladders at about a 4:1 ratio, one foot out from the wall for every four feet of working height, and extend 3 feet above the landing.
Personal fall arrest anchor
An anchor for personal fall arrest must support at least 5,000 pounds per worker or be designed by a qualified person and used with a full-body harness.
Scaffold guardrail height
Scaffold guardrails are typically 42 inches high with a midrail near 21 inches and toe boards; fall protection is required at 10 feet or more.