- SMART goal
- A goal that is Specific, Measurable, Achievable, Relevant and Time-bound. A goal without a measure or a deadline is not SMART and cannot be tracked.
- Tuckman team stages
- Forming, Storming, Norming, Performing, Adjourning. A team that takes on a new task or new members can regress to an earlier stage and needs renewed direction.
- Belbin team roles
- Nine roles grouped as action (Shaper, Implementer, Completer Finisher), people (Coordinator, Teamworker, Resource Investigator) and thought (Plant, Monitor Evaluator, Specialist). Balance across roles supports team performance.
- Thomas-Kilmann conflict modes
- Competing, collaborating, compromising, avoiding and accommodating. Collaborating suits issues important to both sides; avoiding suits trivial issues or when emotions must cool first.
- RACI matrix
- A responsibility chart assigning Responsible (does the work), Accountable (one per activity), Consulted and Informed. More than one accountable person per activity creates unclear ownership.
- Absence rate formula
- Days lost divided by average headcount multiplied by 100 over the same period. It is compared against a baseline or sector norm to judge whether action is needed.
- Hierarchy of control
- Risk controls ranked from most to least effective: eliminate, substitute, engineer, administrate, then personal protective equipment. PPE is the last resort, not the first choice.
- Business case contents
- A document stating the problem, options considered, costs, benefits, risks and a recommendation with an approval route. It enables a decision rather than describing an intention.
- Budget variance
- Actual cost minus budgeted cost. A positive cost variance is overspend; percentage variance is variance divided by budget multiplied by 100.
- Stakeholder power-interest grid
- Maps stakeholders by power and interest. High power and high interest means manage closely; low power and low interest means monitor with minimum effort.
- Five operations objectives
- Quality, speed, dependability, flexibility and cost. They describe operational performance and trade off against each other in process design decisions.
- PDCA cycle
- Plan, Do, Check, Act. A continuous improvement cycle that requires a measured baseline before a change and a check against that baseline afterwards.
- Service level agreement
- A contract term defining scope, response and resolution times, exclusions and review frequency. It converts an expectation into a measurable commitment with consequences.
- Gibbs reflective cycle
- Six stages: description, feelings, evaluation, analysis, conclusion and action plan. It turns an experience into documented learning and a specific change in practice.
- Validity and reliability
- Validity means a method measures what it claims; reliability means repeated measurement gives consistent results. A method can be reliable but still invalid.
- Informed consent
- Agreement to take part in data collection given freely after being told the purpose, use, risks, anonymity arrangements and the right to withdraw.
- Automation bias
- Over-reliance on a system's output at the expense of independent judgement. Mitigation is documented challenge points, audit sampling and authority for reviewers to override.
- Model drift
- Decline in model accuracy as real-world data diverges from training data. Monitoring compares live performance against an agreed threshold that triggers review or retraining.
- Human-in-the-loop
- A control where a person reviews and can override an AI output before it takes effect. It is required where the output affects rights, safety or access to services.
- GHG Protocol scopes
- Scope 1 is direct fuel combustion, Scope 2 is purchased energy and Scope 3 is value-chain emissions including suppliers and product use. They are reported separately.
- Net zero
- Reducing emissions in line with climate science and removing or offsetting only residual emissions. Offsetting is a last step, not a substitute for reduction.
- Science-based target
- A reduction target aligned with limiting global warming to 1.5°C or well below 2°C. It requires a baseline year, target year and a stated pathway.
- Porter's Five Forces
- Supplier power, buyer power, threat of new entrants, threat of substitutes and competitive rivalry. Together they indicate the attractiveness and profitability of an industry.
- Net present value
- The sum of future cash flows discounted at the cost of capital, less the initial investment. A positive NPV indicates value creation at the chosen discount rate.
- Ansoff matrix
- Four growth options ordered by risk: market penetration, product development, market development and diversification. Diversification carries the highest risk because both market and product are new.
- Director's duty to promote success
- A statutory duty to act in the way most likely to promote the success of the company for the benefit of members as a whole, having regard to stakeholders and long-term consequences.
- Board independence
- The extent to which non-executive directors are free from relationships that could affect judgement. It is supported by a majority of independents and separate chair and CEO roles.
- Enterprise risk management
- Aggregating risk across the whole organisation, with board-set appetite and tolerance limits per risk category, rather than managing risks in isolated silos.
- Cost of quality
- Prevention, appraisal, internal failure and external failure costs. External failure, such as recalls or lost customers, is usually the most expensive category.
- Cash conversion cycle
- Days inventory plus days receivable minus days payable. A shorter cycle releases working capital and reduces the funding needed to run operations.
- Materiality
- Information is material if omitting or misstating it could influence the decisions of users. It guides what is disclosed in reports and accounts.
- Circular economy
- An approach that designs out waste, keeps materials in use and regenerates natural systems, replacing the linear take-make-dispose model.