MO Water/Wastewater Operator · Give each week a clear focus.
8 weeks · About 6 hours per week
Drinking Water Treatment
Sketch the full drinking water treatment train from source to finished water, labeling each unit process and its purpose
Define the primary drinking water contaminant categories (microbial, inorganic, organic, radiological, disinfection byproducts) and list one example of each
Explain the difference between primary and secondary drinking water standards and give two examples of each
Calculate a simple chemical dose in mg/L given feed rate, flow, and solution strength
Your checkpoint
A one-page annotated treatment-train diagram with a 10-term glossary of contaminant categories written in your own words
Drinking Water Treatment
Describe coagulation, flocculation, sedimentation, filtration, and disinfection in sequence and state what each removes
Explain the purpose of jar testing and how you would interpret its results to adjust coagulant dose
Compare conventional, direct, and membrane filtration and state one operating condition favoring each
Compute CT (disinfectant concentration times contact time) for a simple chlorine disinfection scenario and compare it to a required value
Your checkpoint
A worked problem set of 5 treatment calculations (dose, detention time, CT, filter loading rate, backwash rate) with units shown at every step
Drinking Water Treatment & Drinking Water Distribution
Identify the regulated disinfection byproducts and describe two operational strategies to reduce their formation
Explain the purpose of the Lead and Copper Rule and describe how corrosion control treatment is selected
List the required monitoring frequency categories for a small community system and match each to a contaminant group
Describe the steps of a sanitary survey and name three common deficiencies an inspector would cite
Your checkpoint
A completed sample monitoring calendar for a hypothetical small system covering one year, with each sample type, frequency, and regulatory driver labeled
Drinking Water Distribution
Diagram a distribution system layout showing source, storage, booster pumping, valves, and dead-end flushing points
Explain how a storage tank's high-water level, operating range, and fire flow reserve are determined
Describe the causes of and remedies for nitrification and disinfection residual loss in distribution systems
Perform a chlorine residual decay check and decide whether flushing, tank turnover adjustment, or booster chlorination is warranted
Your checkpoint
A distribution-system schematic with a written 1-page troubleshooting guide mapping three symptom scenarios (low residual, taste complaints, pressure loss) to likely causes and corrective actions
Drinking Water Distribution & Wastewater Treatment
Explain the purpose of cross-connection control and describe backflow prevention devices and where each is required
Describe the steps of a main break repair from isolation through disinfection and bacteriological clearance
List the major unit processes of a conventional activated sludge wastewater plant in flow order
Define BOD, TSS, and ammonia and state what each indicates about plant performance
Your checkpoint
A written main-break repair procedure checklist of at least 10 sequential steps, plus a labeled wastewater process flow diagram
Wastewater Treatment
Explain the activated sludge process including aeration, mixed liquor, return sludge, and wasting, and define F/M ratio and SRT
Describe how to diagnose and correct filamentous bulking, foaming, and poor settling in a secondary clarifier
Explain nitrification and denitrification and describe the operating conditions that favor each
Describe disinfection and dewatering of solids and the difference between primary and secondary sludge
Your checkpoint
A process-control problem set of 5 calculations (F/M, SRT, sludge volume index, return sludge rate, solids loading) with a one-line interpretation of whether each result is acceptable
Wastewater Collection
Describe gravity sewer, force main, and lift station design considerations and when each is used
Explain the purpose of infiltration/inflow analysis and describe how flow monitoring identifies problem areas
Describe the steps of a lift station inspection and list three common pump and control failures
Explain the purpose of sewer rehabilitation methods such as lining, grouting, and replacement and match each to a defect type
Your checkpoint
A collection-system asset map for a hypothetical service area with 5 identified defect locations, each paired to a recommended repair method and justification
Drinking Water Treatment & Drinking Water Distribution & Wastewater Treatment & Wastewater Collection
Complete a timed 100-question cumulative practice set covering all four domains and review every missed item to its source concept
Re-derive from memory the key formulas for dose, detention time, CT, F/M, SRT, and loading rates
Summarize each domain on one index card with the five highest-yield facts
Identify your three weakest subtopics and write a targeted review action for each
Your checkpoint
A scored practice exam with a written error log listing every missed question, its domain, the correct concept, and the reason for the error
Milestones
Week 2: Score at least 80% on a 20-question self-quiz limited to drinking water treatment, and correctly solve all 5 treatment calculations without notes
Week 4: Explain the distribution system from source to tap, including storage and residual management, in a 5-minute spoken walkthrough with no reference material
Week 6: Score at least 75% on a 25-question mixed quiz covering treatment, distribution, and wastewater treatment, and correctly interpret all 5 process-control calculations