Personal protective equipment (PPE)

Gear worn to reduce injury risk, such as safety glasses, hearing protection, hard hat, gloves, and respirators. Employers must supply required items and train workers in their use and limitations.

Related: Fall protection, Silica dust control
Fall protection

Systems and practices preventing falls from heights, including guardrails, personal fall arrest harnesses, and ladder safety. Residential rules typically trigger at six feet for construction work and require anchorage, training, and inspection.

Related: Personal protective equipment (PPE), Scaffold
Scaffold

Temporary elevated work platform assembled from frames, planks, and braces. It must be plumb, fully planked, tied off where required, and equipped with guardrails and safe access before use.

Related: Fall protection, Lockout/tagout
Lockout/tagout

Procedure for isolating hazardous energy before servicing equipment such as saws or hoists. Energy sources are shut off, locked, tagged, and verified de-energized to prevent unexpected startup.

Related: Scaffold, Silica dust control
Silica dust control

Measures limiting respirable crystalline silica from cutting concrete, masonry, or engineered stone. Common controls include wet cutting, dust-collecting shrouds, ventilation, respirators, and housekeeping that avoids dry sweeping.

Related: Personal protective equipment (PPE), Lockout/tagout
Kickback

Sudden violent reaction when a saw blade binds or pinches in the kerf, throwing the workpiece or tool toward the operator. Riving knives, anti-kickback pawls, and proper support reduce the hazard.

Related: Riving knife, Guard
Riving knife

Metal fin behind a circular saw blade that follows blade height and keeps the kerf open, reducing binding and kickback. It sits closer to the blade than a traditional spreader or guard.

Related: Kickback, Guard
Guard

Physical barrier covering a cutting edge, belt, or blade. Guards must remain in place during operation and be adjustable so stock passes freely without exposing the operator to the hazard.

Related: Kickback, Riving knife
Nominal size

Label used to identify lumber before surfacing, such as a 2x4. Actual dressed dimensions are smaller after planing, so a nominal 2x4 measures about 1-1/2 by 3-1/2 inches when dry.

Related: Actual size, Surfaced lumber (S4S)
Actual size

Finished dimensions of lumber after planing and drying. Framing layout, sheathing thickness, and hardware selection must use actual sizes, not the nominal trade name printed on the piece.

Related: Nominal size, Surfaced lumber (S4S)
Surfaced lumber (S4S)

Lumber planed on four sides to a uniform size and smooth surface. S4S material is common for framing and trim, and its dressed dimensions differ from the nominal label.

Related: Nominal size, Actual size
Moisture content (MC)

Weight of water in wood expressed as a percentage of its oven-dry weight. Framing is typically installed near 19 percent or drier, while finish material needs lower moisture to limit shrinkage and gaps.

Related: Equilibrium moisture content (EMC), Shrinkage
Equilibrium moisture content (EMC)

Moisture level wood eventually reaches when exposed to steady temperature and relative humidity. Knowing local EMC helps predict whether installed lumber will swell or shrink after the building is enclosed.

Related: Moisture content (MC), Shrinkage
Shrinkage

Reduction in wood dimensions as moisture leaves the cells. It is greatest across the grain and least along the length, causing cupping, checking, and joint separation in improperly dried material.

Related: Moisture content (MC), Equilibrium moisture content (EMC)
Grade stamp

Mark applied by an accredited agency showing species, grade, moisture designation, mill, and certification. Inspectors use it to verify that framing meets the grade assumed in the plans.

Related: Visual grading, Design values
Visual grading

Assigning lumber grade by inspecting knots, slope of grain, checks, and wane against written rules. The grade reflects expected strength and appearance rather than a measured test of each board.

Related: Grade stamp, Design values
Design values

Tabulated strength and stiffness properties, such as bending and compression values, assigned to a species and grade. Engineers use them with adjustment factors to size members safely.

Related: Grade stamp, Span rating
Span rating

Number stamped on structural panels showing allowable roof and floor spans when spans are marked, such as 24/16. It tells the installer the maximum spacing for the intended application.

Related: Design values, Sheathing
Adhesive compatibility

Matching an adhesive to the materials, moisture exposure, and temperature of the joint. Solvent, water-based, and polyurethane products behave differently, and incompatible choices can fail or stain finishes.

Related: Subfloor adhesive, Cure time
Subfloor adhesive

Construction adhesive spread on joists before panels are fastened, reducing squeaks and adding stiffness. It must be applied within its open time and used with the specified fasteners.

Related: Adhesive compatibility, Cure time
Cure time

Period needed for an adhesive to develop full strength under stated temperature and humidity. Clamps usually stay until handling strength is reached, but loads should wait for full cure.

Related: Adhesive compatibility, Subfloor adhesive
Ledger board

Horizontal member fastened to a wall or beam to support joists or a deck frame. Attachment must use code-specified anchors and flashing so water does not enter the wall assembly.

Related: Joist hanger, Rim joist
Joist hanger

Metal bracket connecting a joist end to a header or beam, transferring load through the fasteners. Hangers must match joist size, be installed with approved nails, and not be field-modified without approval.

Related: Ledger board, Rim joist
Rim joist

Outer joist running perpendicular to the common joists along the floor edge. It closes the floor frame, supports the ends of joists, and provides a nailing surface for sheathing and siding.

Related: Ledger board, Joist hanger
Bridging

Cross bracing or solid blocking between joists that limits twisting and distributes load. It is installed in a straight line and fastened so joists stay plumb under load.

Related: Rim joist, Joist hanger
Top plate

Horizontal member at the top of a wall that carries ceiling and roof loads. Double top plates lap at corners and intersections, and splices must occur over studs where required.

Related: King stud, Header
King stud

Full-height stud beside a rough opening that supports the header and ties the wall together. Jack studs sit inside it to carry the header directly.

Related: Header, Top plate
Header

Horizontal structural member spanning a rough opening to carry loads above it. Size and grade depend on span, load, and species, and jack studs transfer header load to the floor.

Related: King stud, Top plate
Roof pitch

Slope of a roof expressed as rise over run, often as a ratio such as 4:12. Pitch determines rafter length, sheathing layout, flashing details, and the class of roofing allowed.

Related: Rafter length, Fascia
Rafter length

Distance along a rafter from the ridge to the heel, including any overhang. It is calculated from run, pitch, and the Pythagorean relationship, then adjusted for ridge thickness and seat cuts.

Related: Roof pitch, Birdsmouth cut
Birdsmouth cut

Notch at the rafter heel that seats the rafter flat on the wall plate. The seat cut and plumb cut must be limited so the remaining rafter depth stays adequate for the load.

Related: Rafter length, Fascia
Fascia

Trim board attached to rafter tails or the roof edge, supporting gutters and closing the eave. Fascia material must resist moisture, and its alignment affects soffit and gutter installation.

Related: Roof pitch, Drip cap
Sheathing

Panels or boards fastened over framing to brace it and receive roofing or siding. Sheathing thickness, span rating, and fastener schedule are set by the plans and code.

Related: Span rating, Fascia
Unit rise and unit run

Rise and run measured for one stair step, with unit run commonly 10 or 11 inches and unit rise near 7-3/4 inches. Consistent units keep each step within safe tolerances.

Related: Total rise, Nosing
Total rise

Vertical distance from the finished floor below to the finished floor above. Dividing total rise by a target unit rise gives the number of risers and, after one deduction, the number of treads.

Related: Unit rise and unit run, Nosing
Nosing

Projection of a tread beyond the riser below it, improving footing and appearance. Nosing profile and projection are limited by code and must stay consistent on every tread.

Related: Unit rise and unit run, Total rise
Drip cap

Flashing over a window or door head that sheds water past the wall below. It must lap the flange or weather barrier correctly and slope outward to prevent water entry.

Related: Weather-resistive barrier, Fascia
Weather-resistive barrier

Sheet material behind siding that blocks wind-driven rain while allowing vapor to escape. It is lapped shingle-style, integrated with flashing, and sealed around penetrations.

Related: Drip cap, Flashing
Flashing

Metal or membrane used to direct water away from joints and penetrations. Correct lapping, integration with the weather barrier, and end dams are essential at roofs, walls, and openings.

Related: Drip cap, Weather-resistive barrier
Casing

Trim surrounding a door or window opening on the interior or exterior. It covers the frame-to-wall gap and is mitered or coped at corners for a tight joint.

Related: Baseboard, Drywall joint compound
Baseboard

Trim at the bottom of an interior wall, covering the drywall edge and protecting the wall from scuffs. It is fitted with coped or mitered inside corners and scribed to uneven floors.

Related: Casing, Drywall joint compound
Drywall joint compound

Gypsum-based paste used to embed tape and fill joints and fastener heads. It is applied in thin coats, sanded smooth, and must be dry before recoating or priming.

Related: Casing, Baseboard
Scale

Ratio between a drawing measurement and the real distance it represents, such as 1/4 inch equals one foot. The scale must be confirmed on each sheet before scaling dimensions.

Related: Plan view, Takeoff
Plan view

Drawing looking down on a building, showing walls, openings, and fixtures in horizontal layout. It is used with elevations and sections to understand a complete assembly.

Related: Scale, Takeoff
Takeoff

Systematic list of quantities and materials taken from drawings and specifications. Accurate takeoffs include waste factors, unit conversions, and notes on substitutions or allowances.

Related: Scale, Plan view
Rough opening

Framed opening sized larger than the window or door unit to allow shimming and adjustment. Its dimensions come from manufacturer data and must match the framing and trim details.

Related: Header, King stud
Prescriptive code

Code path giving specific, measurable requirements a builder can follow without engineering. Alternative paths may require design professional involvement and documented calculations.

Related: Permit, Inspection
Permit

Official authorization to perform work under approved plans. Work must follow the permitted scope, and changes usually require plan revision and reapproval before proceeding.

Related: Prescriptive code, Inspection
Inspection

Required review of completed work by an authority before covering it up or advancing to the next phase. Common stages include foundation, framing, rough-in, insulation, and final.

Related: Permit, Prescriptive code