MSCE Woodwork study materials
MSCE Woodwork study resources

MSCE Woodwork study plan

MSCE Woodwork · Give each week a clear focus.

8 weeks · About 7 hours per week

Week 1

Rough Framing: Floor, Wall, and Ceiling Systems

  • Identify the five main components of a floor system (sill, girder, joist, subfloor, blocking) and explain their load paths.

  • Calculate joist spans and spacing using a provided span table for common lumber species and grades.

  • Describe proper installation of rim joists, blocking, and bridging for stability.

  • Explain the difference between platform and balloon framing and list two advantages of each.

Your checkpoint

Create a one-page checklist for inspecting a floor system, including at least 10 checkpoints with code references.

Week 2

Rough Framing: Floor, Wall, and Ceiling Systems

  • Lay out and detail wall framing for a simple rectangular room, including plates, studs, headers, and cripples.

  • Compute the number of studs, plates, and headers needed for a given wall length and opening size.

  • Describe the purpose and installation of let-in bracing and shear panels.

  • Explain ceiling joist layout and the role of ceiling joists in tying walls together.

Your checkpoint

Produce a material takeoff for a 12 ft by 16 ft room with one window and one door, listing all framing members with quantities and lengths.

Week 3

Roof Framing and Sheathing

  • Identify the parts of a gable roof (ridge, common rafter, hip rafter, valley rafter, collar tie) and describe their functions.

  • Calculate rafter lengths using the Pythagorean theorem and slope ratios for common roof pitches.

  • Lay out and cut common rafters, including birdsmouth and plumb cuts, using a framing square.

  • Explain sheathing installation, including panel orientation, nailing patterns, and edge support.

Your checkpoint

Draw a roof framing plan for a 24 ft by 32 ft building with a 6/12 gable roof, labeling all rafters and showing rafter lengths and spacing.

Week 4

Roof Framing and Sheathing & Stair Layout and Construction

  • Describe the steps to frame a hip roof, including hip and jack rafter layout.

  • Calculate stair rise and run using the total rise and desired riser height, ensuring code compliance.

  • Lay out stringers, including the use of a framing square and stair gauges.

  • Identify stair code requirements for riser height, tread depth, handrail height, and landing dimensions.

Your checkpoint

Complete a stair layout worksheet: given a total rise of 8 ft 10 in, calculate the number of risers, riser height, tread depth, total run, and stringer length, and sketch the stair section.

Week 5

Safety, Tools, and Job Site Practices & Wood Materials, Lumber Grades, and Moisture Behavior

  • List the personal protective equipment required for common woodworking tasks and explain when each is necessary.

  • Demonstrate safe operation of circular saw, table saw, and nail gun, including kickback prevention and blade guard use.

  • Identify lumber defects and grading stamps, and explain how moisture content affects lumber selection.

  • Describe proper lumber storage and acclimation procedures for interior and exterior applications.

Your checkpoint

Create a safety audit checklist for a job site, covering at least 15 hazards and corresponding controls, with references to OSHA or local regulations.

Week 6

Fasteners, Adhesives, and Joinery & Exterior Finishing: Windows, Doors, Siding, and Trim

  • Select appropriate fasteners for given applications (e.g., joist hangers, deck ledger, finish trim) based on load and material.

  • Explain the differences between common adhesives (construction adhesive, wood glue, polyurethane) and their suitable uses.

  • Describe proper flashing and weather barrier installation around windows and doors.

  • List siding installation requirements, including clearance from grade, nailing schedules, and expansion gaps.

Your checkpoint

Write a step-by-step procedure for installing a window with proper flashing and air sealing, including a list of materials and tools.

Week 7

Interior Finishing: Drywall, Doors, Trim, and Cabinetry & Print Reading, Layout, and Estimating

  • Interpret architectural drawings, including floor plans, elevations, and sections, to extract dimensions and material specifications.

  • Estimate drywall quantities (sheets, joint compound, tape, screws) for a given room.

  • Describe proper drywall installation techniques, including screw spacing, joint treatment, and corner bead.

  • Explain the steps for hanging and trimming interior doors, including jamb installation and hardware preparation.

Your checkpoint

Complete a quantity takeoff for drywall and trim for a 12 ft by 16 ft room with one window and one door, including a cost estimate using local prices.

Week 8

Codes, Standards, and Inspection Requirements & Safety, Tools, and Job Site Practices & Wood Materials, Lumber Grades, and Moisture Behavior & Fasteners, Adhesives, and Joinery & Rough Framing: Floor, Wall, and Ceiling Systems & Roof Framing and Sheathing & Stair Layout and Construction & Exterior Finishing: Windows, Doors, Siding, and Trim & Interior Finishing: Drywall, Doors, Trim, and Cabinetry & Print Reading, Layout, and Estimating

  • Review key code requirements from the International Residential Code (IRC) for framing, stairs, and safety glazing.

  • Practice answering scenario-based questions that integrate multiple domains, such as a framing inspection or a stair violation.

  • Identify common inspection failures and how to prevent them.

  • Take a timed 50-question practice exam covering all domains and review incorrect answers.

Your checkpoint

Score at least 80% on the practice exam and create a personalized list of weak areas with a plan to review them before the exam.

Milestones

Week 4: Complete a 20-question quiz on framing and stairs with 80% or higher, and correctly calculate stair layout for three different total rise scenarios.

Week 8: Achieve a passing score (70% or higher) on a full-length practice exam under timed conditions, and demonstrate mastery of at least 8 out of 10 domains.