EXIL-NEGOCIOS study materials
EXIL-NEGOCIOS study resources

Metalúrgica Andina: exit the fastener line?

EXIL-NEGOCIOS · Put your knowledge to work in context.

All case studies

Metalúrgica Andina: exit the fastener line?

Metalúrgica Andina makes metal components for industrial buyers. Revenue is €48M. Line A (standard fasteners) contributes €30M at an 8% contribution margin and consumes 62% of press hours. Line B (custom subassemblies for two OEMs) contributes €18M at 19%. Fixed costs are €6.4M. The controller proposes exiting Line A to free capacity for Line B, arguing that the company 'loses money on fasteners.' Two facts complicate this. First, 70% of Line A customers also buy Line B. Second, both OEM contracts require 48-hour replacement-part service, which is currently met using Line A's flexible short-run capacity. The union agreement requires 90 days' notice and €1.2M in severance, and only €900k of the fixed cost base is genuinely avoidable within two years.

1. Quantify the financial case for exiting Line A and identify the error in the controller's framing.

Read the worked answer

Current contribution picture

Line Revenue CM % Contribution
A €30.0M 8% €2.40M
B €18.0M 19% €3.42M
Total €48.0M - €5.82M

Contribution €5.82M against €6.4M fixed = −€0.58M operating result.

Year-1 effect of the exit as proposed

  • Lost contribution: −€2.40M
  • Avoidable fixed cost: +€0.90M
  • One-off severance: −€1.20M
  • Net: −€2.70M in year 1, and −€1.50M per year thereafter until the remaining €5.5M of fixed cost actually comes out (which the proposal does not explain).

The framing error. 'Line A loses money' is an average-cost artefact: fully loaded, A is being charged a share of shared fixed cost it does not cause. On a contribution basis Line A pays €2.40M toward common overhead. Exiting it does not create €2.40M of value; it destroys €2.40M of contribution and hopes to save €0.90M.

A second error: capacity is only valuable if there is demand for it. The proposal implicitly assumes Line B can absorb 62% of press hours at 19% margin. That is an assumption, not a fact in the file.

2. What evidence would you require before the board votes?

Read the worked answer

Four gaps, in order of decision weight:

  1. Confirmed incremental B demand. A signed or pipeline-weighted volume that fills the freed hours, at what price, with what tooling capex and ramp curve. If B demand fills only 30% of the hours, the exit converts a €0.58M loss into a larger loss.
  2. Shared-customer revenue at risk. 70% of A customers also buy B. Build the overlap: what share of B's €18M comes from accounts that also buy A, and what is the observed churn rate when an account stops buying one line? That number, not the 8% margin, is the real cost of the exit.
  3. Contractual exposure. Do the OEM agreements contain continuity-of-supply, single-source or change-of-scope clauses? A 48-hour replacement-part service level that depends on Line A's short-run flexibility is an operational dependency the board cannot waive by vote.
  4. Avoidability of fixed costs, line by line. Which supervisors, leases, presses and quality certifications actually disappear, and in which year. A €0.90M saving that lands in year 3 has a different NPV.

Add competitor capacity and price behaviour for fasteners: the €2.40M of contribution may be recoverable by re-pricing rather than exiting.

3. Give your recommendation, including the condition under which you would reverse it.

Read the worked answer

Recommendation: reject the exit as framed; restructure Line A instead.

  • Rationalise, don't exit. Segment Line A by SKU and customer and re-price or drop the bottom tail - typically the long tail of small orders carries most of the complexity cost. A 3-point price increase on the tail, with modest volume attrition, can lift Line A's contribution by more than the €0.90M the exit would save, without triggering €1.2M of severance or touching the shared-customer base.
  • Fund B on incremental capacity. Add shifts or capex against confirmed B orders rather than cannibalising A's hours.
  • Ring-fence the service obligation. Formalise the replacement-part capability cost and, if possible, charge for it - it is currently an unpriced service embedded in a low-margin line.

Reverse the decision - i.e. exit - if two conditions hold simultaneously: (a) the B pipeline covers at least ~80% of the freed hours at 19% or better within 12 months, and (b) the shared-customer overlap turns out to be low-value - the double-buying accounts represent a small share of B revenue, or churn at single-line accounts is measured and small. If both hold, the exit destroys little contribution and the €1.2M severance is a one-off worth paying. Until both are measured, the exit is a bet on an unverified demand forecast financed with certain cash.