PKMC Module III · Keep the key ideas within reach.

Quick reference

Project Management Fundamentals and the Project Life Cycle

  • Project: a temporary endeavor undertaken to create a unique product, service, or result; temporary means it has a defined start and end, and unique means the deliverable differs in some way from prior work.

  • Operations are ongoing and repetitive; projects are temporary and unique. A work effort that produces the same output repeatedly on an indefinite basis is an operation, not a project.

  • A program is a group of related projects managed in a coordinated way to obtain benefits not available from managing them individually; a portfolio is a collection of projects, programs, and operations managed as a group to achieve strategic objectives.

  • Predictive (waterfall) life cycle: scope, time, and cost are determined early and changes are controlled through formal change requests; adaptive (agile) life cycle: scope is refined iteratively and time and cost boxes are fixed per iteration.

  • Project life cycle phases are typically: starting the project, organizing and preparing, carrying out the work, and closing the project. Cost and staffing levels are low at start, peak during execution, and drop rapidly at closure.

  • Stakeholder influence is highest and cost of changes is lowest at the start of the project; as the project progresses, stakeholder influence decreases and the cost of implementing changes increases.

  • Project management is the application of knowledge, skills, tools, and techniques to project activities to meet requirements, performed through integrating the five process groups: Initiating, Planning, Executing, Monitoring and Controlling, and Closing.

  • A project manager balances competing constraints: scope, schedule, cost, quality, resources, and risk. A change to one constraint generally requires adjustment to at least one other.

Quick reference

Project Initiation, Stakeholders, and Requirements

  • Business case: documents the business need and the justification for investing in the project; it is the primary input to the project charter and is often owned by the sponsor.

  • Project charter: a document issued by the sponsor that formally authorizes the project and the project manager to apply organizational resources; it names the PM, states high-level scope, and records high-level risks and success criteria.

  • Project manager is assigned as early as possible, ideally during charter development; the charter is the document that gives the PM authority, not the project management plan.

  • Stakeholder register: records identification information, assessment information (influence, interest, power), and classification of each stakeholder; it is a project document, not part of the project management plan.

  • Power/interest grid: high power-high interest = manage closely; high power-low interest = keep satisfied; low power-high interest = keep informed; low power-low interest = monitor.

  • Requirements traceability matrix links each requirement to its source (business need, stakeholder) and to the deliverables, test cases, and design components that satisfy it; it supports verifying that all requirements are met.

  • Requirements are documented in the requirements documentation and classified as business, stakeholder, solution, functional, or nonfunctional; only requirements that are approved and funded are baselined into scope.

  • A stakeholder is any individual, group, or organization that may affect, be affected by, or perceive itself to be affected by a decision, activity, or outcome of the project.

Quick reference

Scope, Work Breakdown Structure, and Schedule Planning

  • Scope management sequence: plan scope management, collect requirements, define scope, create WBS, validate scope, control scope. Validate scope is the formal acceptance of completed deliverables; control scope manages changes to the scope baseline.

  • Scope baseline = project scope statement + WBS + WBS dictionary. The scope statement includes product scope description, acceptance criteria, deliverables, exclusions, and constraints/assumptions.

  • WBS: a hierarchical decomposition of the total scope of work into deliverables-oriented work packages. The 100% rule: the WBS captures all work required to complete the project, and no work outside the WBS is performed.

  • Work package: the lowest level of the WBS, where cost and duration can be reliably estimated and managed; the WBS dictionary describes each component's deliverables, acceptance criteria, and responsible party.

  • Decomposition: the process of dividing deliverables into progressively smaller components until work packages are reached; the level of decomposition is driven by the needed degree of control and cost of management.

  • Critical path: the longest path through the network, which determines the shortest possible project duration; it has zero total float, and any delay on it delays the project finish date.

  • Total float = LS - ES or LF - EF; a task with total float greater than zero can slip by that amount without delaying the project finish. Free float is the amount a task can slip without delaying the early start of any successor.

  • Schedule compression: crashing adds resources to critical path activities, usually increases cost, and only works when duration is resource-dependent; fast tracking overlaps activities, increases risk, and only works when activities can overlap.

Quick reference

Cost Estimating, Budgeting, and Earned Value Management

  • Cost baseline = the time-phased approved budget, excluding management reserve. Total project budget = cost baseline + management reserve. Contingency reserve is included in the cost baseline and covers identified risks.

  • Estimate types by accuracy: rough order of magnitude (-25% to +75%), budgetary (-10% to +25%), and definitive (-5% to +10%); accuracy improves as the project progresses and design detail increases.

  • Analogous estimating uses historical data from similar projects, is fast and low cost, and is least accurate; parametric estimating uses a statistical relationship between historical data and variables (e.g., cost per unit) and is more accurate.

  • PV (planned value) = authorized budget for scheduled work; EV (earned value) = budget associated with work actually completed; AC (actual cost) = actual cost incurred for work performed.

  • SV = EV - PV (positive = ahead of schedule); CV = EV - AC (positive = under budget); SPI = EV / PV (greater than 1 = ahead of schedule); CPI = EV / AC (greater than 1 = under budget).

  • EAC forecast: EAC = BAC / CPI when current cost performance is expected to continue; EAC = AC + (BAC - EV) when remaining work is expected to proceed at the budgeted rate; EAC = AC + ETC.

  • TCPI = (BAC - EV) / (BAC - AC) for the budget-to-complete target; TCPI = (BAC - EV) / (EAC - AC) when a revised EAC is the target. TCPI greater than 1 means the remaining work must be performed more efficiently than planned.

  • VAC = BAC - EAC; a negative variance indicates the project is forecast to exceed its approved budget.

Quick reference

Quality, Risk, and Issue Management

  • Quality planning identifies quality standards and how to satisfy them; quality assurance (manage quality) audits processes; quality control inspects deliverables and records results. Quality is conformance to requirements and fitness for use.

  • Cost of quality: prevention costs and appraisal costs are conformance costs; internal and external failure costs are nonconformance costs. The cost of preventing defects is generally lower than the cost of correcting them.

  • Seven basic quality tools: cause-and-effect (fishbone) diagram, flowchart, check sheet, Pareto diagram, histogram, control chart, and scatter diagram. Pareto analysis applies the 80/20 rule to prioritize the vital few causes.

  • Control charts use upper and lower control limits, typically set at plus or minus three sigma, to distinguish common-cause variation from special-cause variation. A process is out of control when a point falls outside a control limit or shows a nonrandom pattern.

  • Risk management sequence: plan risk management, identify risks, perform qualitative risk analysis, perform quantitative risk analysis, plan risk responses, implement risk responses, monitor risks.

  • Risk register contents: identified risks, causes, potential responses, risk owners, probability and impact ratings, risk score, and status. Risk score = probability x impact in qualitative analysis.

  • Negative risk responses: escalate, avoid, transfer, mitigate, accept. Positive risk (opportunity) responses: escalate, exploit, share, enhance, accept. Contingency plans address identified risks; fallback plans address risks whose contingency plan fails.

  • An issue is a risk that has occurred and is now affecting the project; it is tracked in an issue log with an owner, and management reserve is used for unplanned, unidentified work.

Quick reference

Procurement, Contracts, and Vendor Management

  • Make-or-buy analysis determines whether work is performed internally or purchased externally; it considers direct and indirect costs, capacity, and core competency.

  • Fixed-price (lump-sum) contracts place cost risk on the seller and are suitable when scope is well defined. Cost-reimbursable contracts place cost risk on the buyer and are suitable when scope is uncertain.

  • Time and materials contracts blend fixed-price and cost-reimbursable features; they are often used for staff augmentation and usually include a not-to-exceed cap.

  • Procurement sequence: plan procurement management, conduct procurements, control procurements, close procurements. The procurement statement of work describes the work to be performed by the seller.

  • Source selection criteria include price, technical capability, past performance, financial capacity, and production capacity; they are documented in the procurement management plan and used to score proposals.

  • Bidder conferences ensure all prospective sellers have a clear, common understanding of the procurement requirements; all questions and answers are communicated to every seller to maintain fairness.

  • Independent cost estimates are prepared by the buyer to validate seller proposals and to set a realistic budget before evaluating bids.

  • Contract change control system: all changes to a contract must be documented, approved, and incorporated through a formal written amendment; verbal agreements are not binding changes.

Quick reference

Communication, Leadership, and Team Development

  • Communication model: sender encodes, message travels through a medium, receiver decodes, and feedback confirms understanding; noise is anything that interferes with the transmission or reception of the message.

  • Number of communication channels = n(n - 1) / 2, where n is the number of stakeholders; adding stakeholders increases channel count and communication complexity nonlinearly.

  • Communication methods: interactive (meetings, calls) is most effective for complex or ambiguous topics; push (email, reports) sends to specific recipients; pull (shared repositories) requires recipients to retrieve information.

  • Tuckman's stages of team development: forming (orientation), storming (conflict about roles and approach), norming (agreement and cohesion), performing (productive collaboration), and adjourning (release of the team).

  • Sources of power: legitimate (formal authority), reward, penalty/coercive, expert (technical knowledge), referent (respect and personal trust), and informational. Expert and referent power tend to be most effective with knowledge workers.

  • Conflict management approaches: collaborate/problem-solve (win-win, generally preferred), compromise, force, smooth/accommodate, and withdraw/avoid. The approach chosen depends on the situation and the importance of the issue.

  • Servant leadership focuses on serving the team by removing impediments and enabling growth; transformational leadership inspires shared vision and motivates beyond transactional exchange.

  • Motivation theories: Maslow's hierarchy (physiological, safety, social, esteem, self-actualization); Herzberg's two factors (hygiene factors prevent dissatisfaction, motivators drive satisfaction); McGregor's Theory X and Theory Y assumptions about workers.

Quick reference

Project Control, Change Management, and Closure

  • Integrated change control: every change request is logged, assessed for impact on scope, schedule, cost, quality, and risk, then approved, rejected, or deferred by the change control board or delegated authority.

  • Only the approved change request is implemented; the change log records all change requests and their disposition, and approved changes update the relevant baselines and project documents.

  • Configuration management ensures that the versions and configuration of deliverables and documents are controlled and that changes are tracked against the correct baseline.

  • Performance reviews compare actual performance to the baselines using variance analysis, trend analysis, and earned value metrics; corrective action realigns performance with the plan, preventive action reduces the probability of future deviations.

  • Validate scope obtains formal acceptance of completed deliverables from the customer or sponsor; control quality verifies correctness before acceptance. Both should occur before the deliverable is handed over.

  • Close project or phase: confirm all work is complete, obtain final acceptance, archive project documents, release team resources, and update organizational process assets.

  • Lessons learned are captured throughout the project and consolidated at closure; they are stored in the organizational process assets for use by future projects.

  • Benefits realization is measured after project closure; the project manager may not see the benefits, and handover of the product to operations or the customer is a closure activity.

Quick reference

Project Management Fundamentals and the Project Life Cycle

  • Project: a temporary endeavor undertaken to create a unique product, service, or result; temporary means it has a defined start and end, and unique means the deliverable differs in some way from prior work.

  • Operations are ongoing and repetitive; projects are temporary and unique. A work effort that produces the same output repeatedly on an indefinite basis is an operation, not a project.

  • A program is a group of related projects managed in a coordinated way to obtain benefits not available from managing them individually; a portfolio is a collection of projects, programs, and operations managed as a group to achieve strategic objectives.

  • Predictive (waterfall) life cycle: scope, time, and cost are determined early and changes are controlled through formal change requests; adaptive (agile) life cycle: scope is refined iteratively and time and cost boxes are fixed per iteration.

  • Project life cycle phases are typically: starting the project, organizing and preparing, carrying out the work, and closing the project. Cost and staffing levels are low at start, peak during execution, and drop rapidly at closure.

  • Stakeholder influence is highest and cost of changes is lowest at the start of the project; as the project progresses, stakeholder influence decreases and the cost of implementing changes increases.

  • Project management is the application of knowledge, skills, tools, and techniques to project activities to meet requirements, performed through integrating the five process groups: Initiating, Planning, Executing, Monitoring and Controlling, and Closing.

  • A project manager balances competing constraints: scope, schedule, cost, quality, resources, and risk. A change to one constraint generally requires adjustment to at least one other.

Quick reference

Project Initiation, Stakeholders, and Requirements

  • Business case: documents the business need and the justification for investing in the project; it is the primary input to the project charter and is often owned by the sponsor.

  • Project charter: a document issued by the sponsor that formally authorizes the project and the project manager to apply organizational resources; it names the PM, states high-level scope, and records high-level risks and success criteria.

  • Project manager is assigned as early as possible, ideally during charter development; the charter is the document that gives the PM authority, not the project management plan.

  • Stakeholder register: records identification information, assessment information (influence, interest, power), and classification of each stakeholder; it is a project document, not part of the project management plan.

  • Power/interest grid: high power-high interest = manage closely; high power-low interest = keep satisfied; low power-high interest = keep informed; low power-low interest = monitor.

  • Requirements traceability matrix links each requirement to its source (business need, stakeholder) and to the deliverables, test cases, and design components that satisfy it; it supports verifying that all requirements are met.

  • Requirements are documented in the requirements documentation and classified as business, stakeholder, solution, functional, or nonfunctional; only requirements that are approved and funded are baselined into scope.

  • A stakeholder is any individual, group, or organization that may affect, be affected by, or perceive itself to be affected by a decision, activity, or outcome of the project.

Quick reference

Scope, Work Breakdown Structure, and Schedule Planning

  • Scope management sequence: plan scope management, collect requirements, define scope, create WBS, validate scope, control scope. Validate scope is the formal acceptance of completed deliverables; control scope manages changes to the scope baseline.

  • Scope baseline = project scope statement + WBS + WBS dictionary. The scope statement includes product scope description, acceptance criteria, deliverables, exclusions, and constraints/assumptions.

  • WBS: a hierarchical decomposition of the total scope of work into deliverables-oriented work packages. The 100% rule: the WBS captures all work required to complete the project, and no work outside the WBS is performed.

  • Work package: the lowest level of the WBS, where cost and duration can be reliably estimated and managed; the WBS dictionary describes each component's deliverables, acceptance criteria, and responsible party.

  • Decomposition: the process of dividing deliverables into progressively smaller components until work packages are reached; the level of decomposition is driven by the needed degree of control and cost of management.

  • Critical path: the longest path through the network, which determines the shortest possible project duration; it has zero total float, and any delay on it delays the project finish date.

  • Total float = LS - ES or LF - EF; a task with total float greater than zero can slip by that amount without delaying the project finish. Free float is the amount a task can slip without delaying the early start of any successor.

  • Schedule compression: crashing adds resources to critical path activities, usually increases cost, and only works when duration is resource-dependent; fast tracking overlaps activities, increases risk, and only works when activities can overlap.

Quick reference

Cost Estimating, Budgeting, and Earned Value Management

  • Cost baseline = the time-phased approved budget, excluding management reserve. Total project budget = cost baseline + management reserve. Contingency reserve is included in the cost baseline and covers identified risks.

  • Estimate types by accuracy: rough order of magnitude (-25% to +75%), budgetary (-10% to +25%), and definitive (-5% to +10%); accuracy improves as the project progresses and design detail increases.

  • Analogous estimating uses historical data from similar projects, is fast and low cost, and is least accurate; parametric estimating uses a statistical relationship between historical data and variables (e.g., cost per unit) and is more accurate.

  • PV (planned value) = authorized budget for scheduled work; EV (earned value) = budget associated with work actually completed; AC (actual cost) = actual cost incurred for work performed.

  • SV = EV - PV (positive = ahead of schedule); CV = EV - AC (positive = under budget); SPI = EV / PV (greater than 1 = ahead of schedule); CPI = EV / AC (greater than 1 = under budget).

  • EAC forecast: EAC = BAC / CPI when current cost performance is expected to continue; EAC = AC + (BAC - EV) when remaining work is expected to proceed at the budgeted rate; EAC = AC + ETC.

  • TCPI = (BAC - EV) / (BAC - AC) for the budget-to-complete target; TCPI = (BAC - EV) / (EAC - AC) when a revised EAC is the target. TCPI greater than 1 means the remaining work must be performed more efficiently than planned.

  • VAC = BAC - EAC; a negative variance indicates the project is forecast to exceed its approved budget.

Quick reference

Quality, Risk, and Issue Management

  • Quality planning identifies quality standards and how to satisfy them; quality assurance (manage quality) audits processes; quality control inspects deliverables and records results. Quality is conformance to requirements and fitness for use.

  • Cost of quality: prevention costs and appraisal costs are conformance costs; internal and external failure costs are nonconformance costs. The cost of preventing defects is generally lower than the cost of correcting them.

  • Seven basic quality tools: cause-and-effect (fishbone) diagram, flowchart, check sheet, Pareto diagram, histogram, control chart, and scatter diagram. Pareto analysis applies the 80/20 rule to prioritize the vital few causes.

  • Control charts use upper and lower control limits, typically set at plus or minus three sigma, to distinguish common-cause variation from special-cause variation. A process is out of control when a point falls outside a control limit or shows a nonrandom pattern.

  • Risk management sequence: plan risk management, identify risks, perform qualitative risk analysis, perform quantitative risk analysis, plan risk responses, implement risk responses, monitor risks.

  • Risk register contents: identified risks, causes, potential responses, risk owners, probability and impact ratings, risk score, and status. Risk score = probability x impact in qualitative analysis.

  • Negative risk responses: escalate, avoid, transfer, mitigate, accept. Positive risk (opportunity) responses: escalate, exploit, share, enhance, accept. Contingency plans address identified risks; fallback plans address risks whose contingency plan fails.

  • An issue is a risk that has occurred and is now affecting the project; it is tracked in an issue log with an owner, and management reserve is used for unplanned, unidentified work.

Quick reference

Procurement, Contracts, and Vendor Management

  • Make-or-buy analysis determines whether work is performed internally or purchased externally; it considers direct and indirect costs, capacity, and core competency.

  • Fixed-price (lump-sum) contracts place cost risk on the seller and are suitable when scope is well defined. Cost-reimbursable contracts place cost risk on the buyer and are suitable when scope is uncertain.

  • Time and materials contracts blend fixed-price and cost-reimbursable features; they are often used for staff augmentation and usually include a not-to-exceed cap.

  • Procurement sequence: plan procurement management, conduct procurements, control procurements, close procurements. The procurement statement of work describes the work to be performed by the seller.

  • Source selection criteria include price, technical capability, past performance, financial capacity, and production capacity; they are documented in the procurement management plan and used to score proposals.

  • Bidder conferences ensure all prospective sellers have a clear, common understanding of the procurement requirements; all questions and answers are communicated to every seller to maintain fairness.

  • Independent cost estimates are prepared by the buyer to validate seller proposals and to set a realistic budget before evaluating bids.

  • Contract change control system: all changes to a contract must be documented, approved, and incorporated through a formal written amendment; verbal agreements are not binding changes.

Quick reference

Communication, Leadership, and Team Development

  • Communication model: sender encodes, message travels through a medium, receiver decodes, and feedback confirms understanding; noise is anything that interferes with the transmission or reception of the message.

  • Number of communication channels = n(n - 1) / 2, where n is the number of stakeholders; adding stakeholders increases channel count and communication complexity nonlinearly.

  • Communication methods: interactive (meetings, calls) is most effective for complex or ambiguous topics; push (email, reports) sends to specific recipients; pull (shared repositories) requires recipients to retrieve information.

  • Tuckman's stages of team development: forming (orientation), storming (conflict about roles and approach), norming (agreement and cohesion), performing (productive collaboration), and adjourning (release of the team).

  • Sources of power: legitimate (formal authority), reward, penalty/coercive, expert (technical knowledge), referent (respect and personal trust), and informational. Expert and referent power tend to be most effective with knowledge workers.

  • Conflict management approaches: collaborate/problem-solve (win-win, generally preferred), compromise, force, smooth/accommodate, and withdraw/avoid. The approach chosen depends on the situation and the importance of the issue.

  • Servant leadership focuses on serving the team by removing impediments and enabling growth; transformational leadership inspires shared vision and motivates beyond transactional exchange.

  • Motivation theories: Maslow's hierarchy (physiological, safety, social, esteem, self-actualization); Herzberg's two factors (hygiene factors prevent dissatisfaction, motivators drive satisfaction); McGregor's Theory X and Theory Y assumptions about workers.

Quick reference

Project Control, Change Management, and Closure

  • Integrated change control: every change request is logged, assessed for impact on scope, schedule, cost, quality, and risk, then approved, rejected, or deferred by the change control board or delegated authority.

  • Only the approved change request is implemented; the change log records all change requests and their disposition, and approved changes update the relevant baselines and project documents.

  • Configuration management ensures that the versions and configuration of deliverables and documents are controlled and that changes are tracked against the correct baseline.

  • Performance reviews compare actual performance to the baselines using variance analysis, trend analysis, and earned value metrics; corrective action realigns performance with the plan, preventive action reduces the probability of future deviations.

  • Validate scope obtains formal acceptance of completed deliverables from the customer or sponsor; control quality verifies correctness before acceptance. Both should occur before the deliverable is handed over.

  • Close project or phase: confirm all work is complete, obtain final acceptance, archive project documents, release team resources, and update organizational process assets.

  • Lessons learned are captured throughout the project and consolidated at closure; they are stored in the organizational process assets for use by future projects.

  • Benefits realization is measured after project closure; the project manager may not see the benefits, and handover of the product to operations or the customer is a closure activity.

Quick reference

Project Management Fundamentals and the Project Life Cycle

  • Project: a temporary endeavor undertaken to create a unique product, service, or result; temporary means it has a defined start and end, and unique means the deliverable differs in some way from prior work.

  • Operations are ongoing and repetitive; projects are temporary and unique. A work effort that produces the same output repeatedly on an indefinite basis is an operation, not a project.

  • A program is a group of related projects managed in a coordinated way to obtain benefits not available from managing them individually; a portfolio is a collection of projects, programs, and operations managed as a group to achieve strategic objectives.

  • Predictive (waterfall) life cycle: scope, time, and cost are determined early and changes are controlled through formal change requests; adaptive (agile) life cycle: scope is refined iteratively and time and cost boxes are fixed per iteration.

  • Project life cycle phases are typically: starting the project, organizing and preparing, carrying out the work, and closing the project. Cost and staffing levels are low at start, peak during execution, and drop rapidly at closure.

  • Stakeholder influence is highest and cost of changes is lowest at the start of the project; as the project progresses, stakeholder influence decreases and the cost of implementing changes increases.

  • Project management is the application of knowledge, skills, tools, and techniques to project activities to meet requirements, performed through integrating the five process groups: Initiating, Planning, Executing, Monitoring and Controlling, and Closing.

  • A project manager balances competing constraints: scope, schedule, cost, quality, resources, and risk. A change to one constraint generally requires adjustment to at least one other.

Quick reference

Project Initiation, Stakeholders, and Requirements

  • Business case: documents the business need and the justification for investing in the project; it is the primary input to the project charter and is often owned by the sponsor.

  • Project charter: a document issued by the sponsor that formally authorizes the project and the project manager to apply organizational resources; it names the PM, states high-level scope, and records high-level risks and success criteria.

  • Project manager is assigned as early as possible, ideally during charter development; the charter is the document that gives the PM authority, not the project management plan.

  • Stakeholder register: records identification information, assessment information (influence, interest, power), and classification of each stakeholder; it is a project document, not part of the project management plan.

  • Power/interest grid: high power-high interest = manage closely; high power-low interest = keep satisfied; low power-high interest = keep informed; low power-low interest = monitor.

  • Requirements traceability matrix links each requirement to its source (business need, stakeholder) and to the deliverables, test cases, and design components that satisfy it; it supports verifying that all requirements are met.

  • Requirements are documented in the requirements documentation and classified as business, stakeholder, solution, functional, or nonfunctional; only requirements that are approved and funded are baselined into scope.

  • A stakeholder is any individual, group, or organization that may affect, be affected by, or perceive itself to be affected by a decision, activity, or outcome of the project.

Quick reference

Scope, Work Breakdown Structure, and Schedule Planning

  • Scope management sequence: plan scope management, collect requirements, define scope, create WBS, validate scope, control scope. Validate scope is the formal acceptance of completed deliverables; control scope manages changes to the scope baseline.

  • Scope baseline = project scope statement + WBS + WBS dictionary. The scope statement includes product scope description, acceptance criteria, deliverables, exclusions, and constraints/assumptions.

  • WBS: a hierarchical decomposition of the total scope of work into deliverables-oriented work packages. The 100% rule: the WBS captures all work required to complete the project, and no work outside the WBS is performed.

  • Work package: the lowest level of the WBS, where cost and duration can be reliably estimated and managed; the WBS dictionary describes each component's deliverables, acceptance criteria, and responsible party.

  • Decomposition: the process of dividing deliverables into progressively smaller components until work packages are reached; the level of decomposition is driven by the needed degree of control and cost of management.

  • Critical path: the longest path through the network, which determines the shortest possible project duration; it has zero total float, and any delay on it delays the project finish date.

  • Total float = LS - ES or LF - EF; a task with total float greater than zero can slip by that amount without delaying the project finish. Free float is the amount a task can slip without delaying the early start of any successor.

  • Schedule compression: crashing adds resources to critical path activities, usually increases cost, and only works when duration is resource-dependent; fast tracking overlaps activities, increases risk, and only works when activities can overlap.

Quick reference

Cost Estimating, Budgeting, and Earned Value Management

  • Cost baseline = the time-phased approved budget, excluding management reserve. Total project budget = cost baseline + management reserve. Contingency reserve is included in the cost baseline and covers identified risks.

  • Estimate types by accuracy: rough order of magnitude (-25% to +75%), budgetary (-10% to +25%), and definitive (-5% to +10%); accuracy improves as the project progresses and design detail increases.

  • Analogous estimating uses historical data from similar projects, is fast and low cost, and is least accurate; parametric estimating uses a statistical relationship between historical data and variables (e.g., cost per unit) and is more accurate.

  • PV (planned value) = authorized budget for scheduled work; EV (earned value) = budget associated with work actually completed; AC (actual cost) = actual cost incurred for work performed.

  • SV = EV - PV (positive = ahead of schedule); CV = EV - AC (positive = under budget); SPI = EV / PV (greater than 1 = ahead of schedule); CPI = EV / AC (greater than 1 = under budget).

  • EAC forecast: EAC = BAC / CPI when current cost performance is expected to continue; EAC = AC + (BAC - EV) when remaining work is expected to proceed at the budgeted rate; EAC = AC + ETC.

  • TCPI = (BAC - EV) / (BAC - AC) for the budget-to-complete target; TCPI = (BAC - EV) / (EAC - AC) when a revised EAC is the target. TCPI greater than 1 means the remaining work must be performed more efficiently than planned.

  • VAC = BAC - EAC; a negative variance indicates the project is forecast to exceed its approved budget.

Quick reference

Quality, Risk, and Issue Management

  • Quality planning identifies quality standards and how to satisfy them; quality assurance (manage quality) audits processes; quality control inspects deliverables and records results. Quality is conformance to requirements and fitness for use.

  • Cost of quality: prevention costs and appraisal costs are conformance costs; internal and external failure costs are nonconformance costs. The cost of preventing defects is generally lower than the cost of correcting them.

  • Seven basic quality tools: cause-and-effect (fishbone) diagram, flowchart, check sheet, Pareto diagram, histogram, control chart, and scatter diagram. Pareto analysis applies the 80/20 rule to prioritize the vital few causes.

  • Control charts use upper and lower control limits, typically set at plus or minus three sigma, to distinguish common-cause variation from special-cause variation. A process is out of control when a point falls outside a control limit or shows a nonrandom pattern.

  • Risk management sequence: plan risk management, identify risks, perform qualitative risk analysis, perform quantitative risk analysis, plan risk responses, implement risk responses, monitor risks.

  • Risk register contents: identified risks, causes, potential responses, risk owners, probability and impact ratings, risk score, and status. Risk score = probability x impact in qualitative analysis.

  • Negative risk responses: escalate, avoid, transfer, mitigate, accept. Positive risk (opportunity) responses: escalate, exploit, share, enhance, accept. Contingency plans address identified risks; fallback plans address risks whose contingency plan fails.

  • An issue is a risk that has occurred and is now affecting the project; it is tracked in an issue log with an owner, and management reserve is used for unplanned, unidentified work.

Quick reference

Procurement, Contracts, and Vendor Management

  • Make-or-buy analysis determines whether work is performed internally or purchased externally; it considers direct and indirect costs, capacity, and core competency.

  • Fixed-price (lump-sum) contracts place cost risk on the seller and are suitable when scope is well defined. Cost-reimbursable contracts place cost risk on the buyer and are suitable when scope is uncertain.

  • Time and materials contracts blend fixed-price and cost-reimbursable features; they are often used for staff augmentation and usually include a not-to-exceed cap.

  • Procurement sequence: plan procurement management, conduct procurements, control procurements, close procurements. The procurement statement of work describes the work to be performed by the seller.

  • Source selection criteria include price, technical capability, past performance, financial capacity, and production capacity; they are documented in the procurement management plan and used to score proposals.

  • Bidder conferences ensure all prospective sellers have a clear, common understanding of the procurement requirements; all questions and answers are communicated to every seller to maintain fairness.

  • Independent cost estimates are prepared by the buyer to validate seller proposals and to set a realistic budget before evaluating bids.

  • Contract change control system: all changes to a contract must be documented, approved, and incorporated through a formal written amendment; verbal agreements are not binding changes.

Quick reference

Communication, Leadership, and Team Development

  • Communication model: sender encodes, message travels through a medium, receiver decodes, and feedback confirms understanding; noise is anything that interferes with the transmission or reception of the message.

  • Number of communication channels = n(n - 1) / 2, where n is the number of stakeholders; adding stakeholders increases channel count and communication complexity nonlinearly.

  • Communication methods: interactive (meetings, calls) is most effective for complex or ambiguous topics; push (email, reports) sends to specific recipients; pull (shared repositories) requires recipients to retrieve information.

  • Tuckman's stages of team development: forming (orientation), storming (conflict about roles and approach), norming (agreement and cohesion), performing (productive collaboration), and adjourning (release of the team).

  • Sources of power: legitimate (formal authority), reward, penalty/coercive, expert (technical knowledge), referent (respect and personal trust), and informational. Expert and referent power tend to be most effective with knowledge workers.

  • Conflict management approaches: collaborate/problem-solve (win-win, generally preferred), compromise, force, smooth/accommodate, and withdraw/avoid. The approach chosen depends on the situation and the importance of the issue.

  • Servant leadership focuses on serving the team by removing impediments and enabling growth; transformational leadership inspires shared vision and motivates beyond transactional exchange.

  • Motivation theories: Maslow's hierarchy (physiological, safety, social, esteem, self-actualization); Herzberg's two factors (hygiene factors prevent dissatisfaction, motivators drive satisfaction); McGregor's Theory X and Theory Y assumptions about workers.

Quick reference

Project Control, Change Management, and Closure

  • Integrated change control: every change request is logged, assessed for impact on scope, schedule, cost, quality, and risk, then approved, rejected, or deferred by the change control board or delegated authority.

  • Only the approved change request is implemented; the change log records all change requests and their disposition, and approved changes update the relevant baselines and project documents.

  • Configuration management ensures that the versions and configuration of deliverables and documents are controlled and that changes are tracked against the correct baseline.

  • Performance reviews compare actual performance to the baselines using variance analysis, trend analysis, and earned value metrics; corrective action realigns performance with the plan, preventive action reduces the probability of future deviations.

  • Validate scope obtains formal acceptance of completed deliverables from the customer or sponsor; control quality verifies correctness before acceptance. Both should occur before the deliverable is handed over.

  • Close project or phase: confirm all work is complete, obtain final acceptance, archive project documents, release team resources, and update organizational process assets.

  • Lessons learned are captured throughout the project and consolidated at closure; they are stored in the organizational process assets for use by future projects.

  • Benefits realization is measured after project closure; the project manager may not see the benefits, and handover of the product to operations or the customer is a closure activity.

Quick reference

Project Management Fundamentals and the Project Life Cycle

  • Project: a temporary endeavor undertaken to create a unique product, service, or result; temporary means it has a defined start and end, and unique means the deliverable differs in some way from prior work.

  • Operations are ongoing and repetitive; projects are temporary and unique. A work effort that produces the same output repeatedly on an indefinite basis is an operation, not a project.

  • A program is a group of related projects managed in a coordinated way to obtain benefits not available from managing them individually; a portfolio is a collection of projects, programs, and operations managed as a group to achieve strategic objectives.

  • Predictive (waterfall) life cycle: scope, time, and cost are determined early and changes are controlled through formal change requests; adaptive (agile) life cycle: scope is refined iteratively and time and cost boxes are fixed per iteration.

  • Project life cycle phases are typically: starting the project, organizing and preparing, carrying out the work, and closing the project. Cost and staffing levels are low at start, peak during execution, and drop rapidly at closure.

  • Stakeholder influence is highest and cost of changes is lowest at the start of the project; as the project progresses, stakeholder influence decreases and the cost of implementing changes increases.

  • Project management is the application of knowledge, skills, tools, and techniques to project activities to meet requirements, performed through integrating the five process groups: Initiating, Planning, Executing, Monitoring and Controlling, and Closing.

  • A project manager balances competing constraints: scope, schedule, cost, quality, resources, and risk. A change to one constraint generally requires adjustment to at least one other.

Quick reference

Project Initiation, Stakeholders, and Requirements

  • Business case: documents the business need and the justification for investing in the project; it is the primary input to the project charter and is often owned by the sponsor.

  • Project charter: a document issued by the sponsor that formally authorizes the project and the project manager to apply organizational resources; it names the PM, states high-level scope, and records high-level risks and success criteria.

  • Project manager is assigned as early as possible, ideally during charter development; the charter is the document that gives the PM authority, not the project management plan.

  • Stakeholder register: records identification information, assessment information (influence, interest, power), and classification of each stakeholder; it is a project document, not part of the project management plan.

  • Power/interest grid: high power-high interest = manage closely; high power-low interest = keep satisfied; low power-high interest = keep informed; low power-low interest = monitor.

  • Requirements traceability matrix links each requirement to its source (business need, stakeholder) and to the deliverables, test cases, and design components that satisfy it; it supports verifying that all requirements are met.

  • Requirements are documented in the requirements documentation and classified as business, stakeholder, solution, functional, or nonfunctional; only requirements that are approved and funded are baselined into scope.

  • A stakeholder is any individual, group, or organization that may affect, be affected by, or perceive itself to be affected by a decision, activity, or outcome of the project.

Quick reference

Scope, Work Breakdown Structure, and Schedule Planning

  • Scope management sequence: plan scope management, collect requirements, define scope, create WBS, validate scope, control scope. Validate scope is the formal acceptance of completed deliverables; control scope manages changes to the scope baseline.

  • Scope baseline = project scope statement + WBS + WBS dictionary. The scope statement includes product scope description, acceptance criteria, deliverables, exclusions, and constraints/assumptions.

  • WBS: a hierarchical decomposition of the total scope of work into deliverables-oriented work packages. The 100% rule: the WBS captures all work required to complete the project, and no work outside the WBS is performed.

  • Work package: the lowest level of the WBS, where cost and duration can be reliably estimated and managed; the WBS dictionary describes each component's deliverables, acceptance criteria, and responsible party.

  • Decomposition: the process of dividing deliverables into progressively smaller components until work packages are reached; the level of decomposition is driven by the needed degree of control and cost of management.

  • Critical path: the longest path through the network, which determines the shortest possible project duration; it has zero total float, and any delay on it delays the project finish date.

  • Total float = LS - ES or LF - EF; a task with total float greater than zero can slip by that amount without delaying the project finish. Free float is the amount a task can slip without delaying the early start of any successor.

  • Schedule compression: crashing adds resources to critical path activities, usually increases cost, and only works when duration is resource-dependent; fast tracking overlaps activities, increases risk, and only works when activities can overlap.

Quick reference

Cost Estimating, Budgeting, and Earned Value Management

  • Cost baseline = the time-phased approved budget, excluding management reserve. Total project budget = cost baseline + management reserve. Contingency reserve is included in the cost baseline and covers identified risks.

  • Estimate types by accuracy: rough order of magnitude (-25% to +75%), budgetary (-10% to +25%), and definitive (-5% to +10%); accuracy improves as the project progresses and design detail increases.

  • Analogous estimating uses historical data from similar projects, is fast and low cost, and is least accurate; parametric estimating uses a statistical relationship between historical data and variables (e.g., cost per unit) and is more accurate.

  • PV (planned value) = authorized budget for scheduled work; EV (earned value) = budget associated with work actually completed; AC (actual cost) = actual cost incurred for work performed.

  • SV = EV - PV (positive = ahead of schedule); CV = EV - AC (positive = under budget); SPI = EV / PV (greater than 1 = ahead of schedule); CPI = EV / AC (greater than 1 = under budget).

  • EAC forecast: EAC = BAC / CPI when current cost performance is expected to continue; EAC = AC + (BAC - EV) when remaining work is expected to proceed at the budgeted rate; EAC = AC + ETC.

  • TCPI = (BAC - EV) / (BAC - AC) for the budget-to-complete target; TCPI = (BAC - EV) / (EAC - AC) when a revised EAC is the target. TCPI greater than 1 means the remaining work must be performed more efficiently than planned.

  • VAC = BAC - EAC; a negative variance indicates the project is forecast to exceed its approved budget.

Quick reference

Quality, Risk, and Issue Management

  • Quality planning identifies quality standards and how to satisfy them; quality assurance (manage quality) audits processes; quality control inspects deliverables and records results. Quality is conformance to requirements and fitness for use.

  • Cost of quality: prevention costs and appraisal costs are conformance costs; internal and external failure costs are nonconformance costs. The cost of preventing defects is generally lower than the cost of correcting them.

  • Seven basic quality tools: cause-and-effect (fishbone) diagram, flowchart, check sheet, Pareto diagram, histogram, control chart, and scatter diagram. Pareto analysis applies the 80/20 rule to prioritize the vital few causes.

  • Control charts use upper and lower control limits, typically set at plus or minus three sigma, to distinguish common-cause variation from special-cause variation. A process is out of control when a point falls outside a control limit or shows a nonrandom pattern.

  • Risk management sequence: plan risk management, identify risks, perform qualitative risk analysis, perform quantitative risk analysis, plan risk responses, implement risk responses, monitor risks.

  • Risk register contents: identified risks, causes, potential responses, risk owners, probability and impact ratings, risk score, and status. Risk score = probability x impact in qualitative analysis.

  • Negative risk responses: escalate, avoid, transfer, mitigate, accept. Positive risk (opportunity) responses: escalate, exploit, share, enhance, accept. Contingency plans address identified risks; fallback plans address risks whose contingency plan fails.

  • An issue is a risk that has occurred and is now affecting the project; it is tracked in an issue log with an owner, and management reserve is used for unplanned, unidentified work.

Quick reference

Procurement, Contracts, and Vendor Management

  • Make-or-buy analysis determines whether work is performed internally or purchased externally; it considers direct and indirect costs, capacity, and core competency.

  • Fixed-price (lump-sum) contracts place cost risk on the seller and are suitable when scope is well defined. Cost-reimbursable contracts place cost risk on the buyer and are suitable when scope is uncertain.

  • Time and materials contracts blend fixed-price and cost-reimbursable features; they are often used for staff augmentation and usually include a not-to-exceed cap.

  • Procurement sequence: plan procurement management, conduct procurements, control procurements, close procurements. The procurement statement of work describes the work to be performed by the seller.

  • Source selection criteria include price, technical capability, past performance, financial capacity, and production capacity; they are documented in the procurement management plan and used to score proposals.

  • Bidder conferences ensure all prospective sellers have a clear, common understanding of the procurement requirements; all questions and answers are communicated to every seller to maintain fairness.

  • Independent cost estimates are prepared by the buyer to validate seller proposals and to set a realistic budget before evaluating bids.

  • Contract change control system: all changes to a contract must be documented, approved, and incorporated through a formal written amendment; verbal agreements are not binding changes.

Quick reference

Communication, Leadership, and Team Development

  • Communication model: sender encodes, message travels through a medium, receiver decodes, and feedback confirms understanding; noise is anything that interferes with the transmission or reception of the message.

  • Number of communication channels = n(n - 1) / 2, where n is the number of stakeholders; adding stakeholders increases channel count and communication complexity nonlinearly.

  • Communication methods: interactive (meetings, calls) is most effective for complex or ambiguous topics; push (email, reports) sends to specific recipients; pull (shared repositories) requires recipients to retrieve information.

  • Tuckman's stages of team development: forming (orientation), storming (conflict about roles and approach), norming (agreement and cohesion), performing (productive collaboration), and adjourning (release of the team).

  • Sources of power: legitimate (formal authority), reward, penalty/coercive, expert (technical knowledge), referent (respect and personal trust), and informational. Expert and referent power tend to be most effective with knowledge workers.

  • Conflict management approaches: collaborate/problem-solve (win-win, generally preferred), compromise, force, smooth/accommodate, and withdraw/avoid. The approach chosen depends on the situation and the importance of the issue.

  • Servant leadership focuses on serving the team by removing impediments and enabling growth; transformational leadership inspires shared vision and motivates beyond transactional exchange.

  • Motivation theories: Maslow's hierarchy (physiological, safety, social, esteem, self-actualization); Herzberg's two factors (hygiene factors prevent dissatisfaction, motivators drive satisfaction); McGregor's Theory X and Theory Y assumptions about workers.

Quick reference

Project Control, Change Management, and Closure

  • Integrated change control: every change request is logged, assessed for impact on scope, schedule, cost, quality, and risk, then approved, rejected, or deferred by the change control board or delegated authority.

  • Only the approved change request is implemented; the change log records all change requests and their disposition, and approved changes update the relevant baselines and project documents.

  • Configuration management ensures that the versions and configuration of deliverables and documents are controlled and that changes are tracked against the correct baseline.

  • Performance reviews compare actual performance to the baselines using variance analysis, trend analysis, and earned value metrics; corrective action realigns performance with the plan, preventive action reduces the probability of future deviations.

  • Validate scope obtains formal acceptance of completed deliverables from the customer or sponsor; control quality verifies correctness before acceptance. Both should occur before the deliverable is handed over.

  • Close project or phase: confirm all work is complete, obtain final acceptance, archive project documents, release team resources, and update organizational process assets.

  • Lessons learned are captured throughout the project and consolidated at closure; they are stored in the organizational process assets for use by future projects.

  • Benefits realization is measured after project closure; the project manager may not see the benefits, and handover of the product to operations or the customer is a closure activity.