NABCEP PV Associate flashcards
NABCEP PV Associate · Build recall with a focused review session.
32 cards. Read the term and the definition here. The deck at the top of this page is optional.
- Standard Test Conditions
- Reference conditions for module ratings: 1000 W/m² irradiance, 25 °C cell temperature, and AM 1.5 spectrum. Nameplate power, voltage, and current are reported at STC.
- Insolation vs irradiance
- Irradiance is instantaneous power per area (W/m²); insolation is energy accumulated over time, typically kWh/m²/day. Insolation drives daily energy yield estimates.
- Temperature coefficient of power
- The percent change in module power per degree Celsius above 25 °C. For crystalline silicon it is usually about −0.3% to −0.45% per °C.
- Series and parallel wiring
- Series connections add voltages and share the lowest current; parallel connections add currents and share the lowest voltage. String design uses both to match inverter windows.
- Bypass diode function
- A diode across a module substring that provides an alternate current path when cells are shaded or faulty, limiting hot-spot heating and preserving string output.
- DC/AC ratio
- The ratio of array DC nameplate power to inverter AC rating. Values around 1.1–1.3 are common; higher ratios clip peak output but improve low-light production.
- Shading analysis
- Evaluation of obstructions across the year using a solar pathfinder or software. Partial shade on one cell can limit an entire series string, so layout matters.
- Voltage drop target
- Design limit for conductor losses, typically 2–3% on DC and AC circuits. Long home runs or undersized conductors increase drop and reduce delivered power.
- Commissioning checks
- Verification before energizing: open-circuit voltage, short-circuit current, insulation resistance, polarity, torque, and inverter startup. Results are compared against design values.
- Racking wind and snow load
- Mounting systems must be listed and rated for site design loads. Roof attachments require flashing and structural review to avoid leaks and failures.
- NEC Article 690
- The National Electrical Code article covering solar photovoltaic systems, including conductor sizing, disconnects, grounding, arc-fault protection, and labeling requirements.
- 125% continuous current rule
- NEC 690.8 requires PV source and output currents to be multiplied by 125% for conductor and overcurrent sizing, treating array output as a continuous load.
- Rapid shutdown
- NEC 690.12 requires conductors within the array boundary to be limited to 80 V within 30 seconds of shutdown, protecting firefighters and responders.
- Maximum PV system voltage
- Calculated using module open-circuit voltage corrected to the lowest expected ambient temperature, using the Voc temperature coefficient from the datasheet.
- Equipment grounding conductor
- A conductor bonding module frames, racking, and enclosures to the grounding system, providing a low-impedance fault path and shock protection.
- DC arc-fault protection
- NEC 690.11 requires listed DC arc-fault circuit interruption on PV systems above a threshold voltage to detect and interrupt series arcing.
- UL 1741 listing
- The safety standard for inverters and interconnection equipment. Listed inverters include anti-islanding functions required for grid-tied operation.
- Anti-islanding
- A function that stops inverter output when the utility source is lost, preventing an energized island that could endanger line workers during outages.
- 120% busbar rule
- NEC 705.12 permits the sum of overcurrent devices feeding a busbar to reach 120% of its rating when the load breaker is at the opposite end.
- Permission to operate
- Utility authorization granted after interconnection review and inspection, allowing the grid-tied system to export power legally.
- Net metering
- A billing arrangement crediting exported energy against consumption. Rules vary by utility and state, so the local tariff must be verified.
- Inverter MPPT window
- The input voltage range over which the inverter tracks maximum power. String voltage at temperature extremes must stay inside this window.
- Fall protection threshold
- OSHA 29 CFR 1926 Subpart M requires fall protection at 6 feet or more above a lower level for construction work.
- Ladder extension rule
- Extension ladders must extend 3 feet above the landing and use a 4:1 slope. Maintain three-point contact and secure the ladder.
- Lockout/tagout
- OSHA 1926 Subpart K procedure isolating energy sources before work. PV DC conductors remain energized even after AC shutdown, so verify with a meter.
- Hazard communication
- OSHA 1926.59 requires safety data sheets and training for hazardous chemicals used on site, such as sealants and cleaning agents.
- OSHA injury reporting
- Employers must report fatalities within 8 hours and severe injuries such as amputations or hospitalizations within 24 hours.
- Soiling losses
- Reduction in output from dust, pollen, bird droppings, and snow. Typical losses are 1–5% but can exceed 20% in dusty or agricultural areas.
- Cleaning best practice
- Use deionized or low-mineral water and soft brushes, avoid abrasives and high pressure, and clean when modules are cool to prevent thermal shock.
- Hot spot detection
- Thermal imaging reveals cells or connections running hotter than neighbors, indicating shading, damage, or failing bypass diodes that reduce output and safety.
- I-V curve tracing
- Measurement of current versus voltage for a string or module. Deviation from the expected curve identifies underperforming modules, soiling, or mismatch.
- Connector and torque checks
- Periodic inspection of MC4 mating, mounting hardware torque, and grounding bonds per manufacturer intervals prevents loose connections, arcing, and ground faults.