NABCEP PV Associate study materials
NABCEP PV Associate study resources

NABCEP PV Associate study plan

NABCEP PV Associate · Give each week a clear focus.

8 weeks · About 6 hours per week

Week 1

PV systems fundamentals and applications

  • Explain how photons, band gap, and semiconductor doping produce current in a PV cell

  • Distinguish irradiance from insolation and convert between W/m² and peak sun hours

  • Trace the I-V curve and label Voc, Isc, Vmp, Imp, and Pmax on a hand-drawn plot

  • Compare series and parallel array wiring effects on voltage and current

  • Identify the four main PV system architectures: stand-alone, grid-tied, grid-tied with battery, and hybrid

Your checkpoint

A one-page labeled I-V curve diagram with a written explanation of how temperature and irradiance shift the curve

Week 2

PV systems fundamentals and applications & PV system design and installation

  • Calculate daily energy demand in Wh for a sample load list

  • Size a battery bank from days of autonomy, depth of discharge, and system voltage

  • Select an inverter rating from continuous and surge load requirements

  • Determine array tilt and azimuth for a given latitude and roof orientation

  • Compute wire voltage drop for a DC home-run circuit

Your checkpoint

A complete off-grid sizing worksheet for a 3 kWh/day cabin load, showing array, battery, inverter, and conductor selections with calculations

Week 3

PV system design and installation

  • Compare roof-mount, ground-mount, and ballasted racking for wind uplift and waterproofing

  • Specify module clamping zones and torque values from a manufacturer datasheet

  • Identify shade sources and describe bypass diode and string-level mitigation

  • List the steps of a structural and roof-condition site assessment

  • Describe commissioning checks: torque, insulation resistance, polarity, and open-circuit voltage

Your checkpoint

A written installation sequence for a 10 kW roof-mounted array covering layout, attachment, flashing, and commissioning tests

Week 4

Electrical safety and the National Electrical Code (NFPA 70)

  • Apply NEC Article 690 requirements for rapid shutdown and labeling

  • Calculate conductor ampacity with 690.8(A) and 690.8(B) factors

  • Size overcurrent protection and disconnects for a PV source circuit

  • Distinguish grounding electrode conductor from equipment grounding conductor roles

  • Apply 705.12 interconnection rules for supply-side and load-side connections

Your checkpoint

A code-citation reference sheet mapping 12 common PV field scenarios to the specific NEC article and section

Week 5

Electrical safety and the National Electrical Code (NFPA 70) & Grid-connected PV system design and installation

  • Draw a single-line diagram for a grid-tied system with string inverter and AC disconnect

  • Select string size limits from module Voc temperature coefficient and inverter window

  • Apply the 125 percent continuous-load rule to inverter output conductors

  • Identify utility interconnection requirements: net metering, anti-islanding, and IEEE 1547

  • Explain the purpose of the 690.12 rapid shutdown boundary

Your checkpoint

A complete single-line diagram for a 12 kW grid-tied system with string sizing calculations and all code-required labels listed

Week 6

Occupational safety and health regulations for construction (OSHA 29 CFR 1926)

  • Apply OSHA 1926 Subpart M fall protection thresholds and anchorage rules

  • Select PPE for arc flash, shock, and chemical hazards per NFPA 70E

  • Describe lockout/tagout steps for inverter and combiner servicing

  • Identify 1926 Subpart E and Subpart K electrical safety requirements for construction sites

  • Explain the hazards of DC arc faults and the role of string-level rapid shutdown

Your checkpoint

A site-specific job hazard analysis for a two-day rooftop installation, listing hazards, controls, and required PPE

Week 7

Solar panel cleaning and system maintenance

  • Build a preventive maintenance schedule with inspection intervals for modules, inverters, and racking

  • Describe safe cleaning methods, water quality limits, and acceptable soiling thresholds

  • Diagnose common performance losses: soiling, shading, mismatch, and connector degradation

  • Interpret monitoring data to distinguish a string outage from a gradual degradation trend

  • Explain thermal imaging and insulation resistance testing for fault detection

Your checkpoint

A one-year maintenance checklist with measurable pass/fail criteria for each inspection item

Week 8

PV systems fundamentals and applications & PV system design and installation & Electrical safety and the National Electrical Code (NFPA 70) & Grid-connected PV system design and installation & Occupational safety and health regulations for construction (OSHA 29 CFR 1926) & Solar panel cleaning and system maintenance

  • Complete a timed 60-question practice exam and score at least 80 percent

  • Review every missed item and write the governing concept for each error

  • Recompute string sizing, voltage drop, and battery sizing from memory

  • Recite NEC sections 690.8, 690.12, and 705.12 from a blank sheet

  • Rehearse safety scenarios covering fall protection and arc flash response

Your checkpoint

A scored practice exam plus a one-page error log categorizing every miss by domain, with the corrected rule for each

Milestones

Week 2: Score 80 percent or better on a 20-question quiz covering domains 1 and 2, including two sizing calculations

Week 4: Produce the NEC citation sheet from memory for at least 10 of 12 scenarios, and correctly size a source circuit overcurrent device

Week 6: Complete a single-line diagram and a job hazard analysis that a peer can review without asking clarifying questions

Week 8: Score 80 percent or better on a full-length timed practice exam with no domain below 70 percent