NABCEP PV Associate study plan
NABCEP PV Associate · Give each week a clear focus.
8 weeks · About 6 hours per week
PV systems fundamentals and applications
Explain how photons, band gap, and semiconductor doping produce current in a PV cell
Distinguish irradiance from insolation and convert between W/m² and peak sun hours
Trace the I-V curve and label Voc, Isc, Vmp, Imp, and Pmax on a hand-drawn plot
Compare series and parallel array wiring effects on voltage and current
Identify the four main PV system architectures: stand-alone, grid-tied, grid-tied with battery, and hybrid
Your checkpoint
A one-page labeled I-V curve diagram with a written explanation of how temperature and irradiance shift the curve
PV systems fundamentals and applications & PV system design and installation
Calculate daily energy demand in Wh for a sample load list
Size a battery bank from days of autonomy, depth of discharge, and system voltage
Select an inverter rating from continuous and surge load requirements
Determine array tilt and azimuth for a given latitude and roof orientation
Compute wire voltage drop for a DC home-run circuit
Your checkpoint
A complete off-grid sizing worksheet for a 3 kWh/day cabin load, showing array, battery, inverter, and conductor selections with calculations
PV system design and installation
Compare roof-mount, ground-mount, and ballasted racking for wind uplift and waterproofing
Specify module clamping zones and torque values from a manufacturer datasheet
Identify shade sources and describe bypass diode and string-level mitigation
List the steps of a structural and roof-condition site assessment
Describe commissioning checks: torque, insulation resistance, polarity, and open-circuit voltage
Your checkpoint
A written installation sequence for a 10 kW roof-mounted array covering layout, attachment, flashing, and commissioning tests
Electrical safety and the National Electrical Code (NFPA 70)
Apply NEC Article 690 requirements for rapid shutdown and labeling
Calculate conductor ampacity with 690.8(A) and 690.8(B) factors
Size overcurrent protection and disconnects for a PV source circuit
Distinguish grounding electrode conductor from equipment grounding conductor roles
Apply 705.12 interconnection rules for supply-side and load-side connections
Your checkpoint
A code-citation reference sheet mapping 12 common PV field scenarios to the specific NEC article and section
Electrical safety and the National Electrical Code (NFPA 70) & Grid-connected PV system design and installation
Draw a single-line diagram for a grid-tied system with string inverter and AC disconnect
Select string size limits from module Voc temperature coefficient and inverter window
Apply the 125 percent continuous-load rule to inverter output conductors
Identify utility interconnection requirements: net metering, anti-islanding, and IEEE 1547
Explain the purpose of the 690.12 rapid shutdown boundary
Your checkpoint
A complete single-line diagram for a 12 kW grid-tied system with string sizing calculations and all code-required labels listed
Occupational safety and health regulations for construction (OSHA 29 CFR 1926)
Apply OSHA 1926 Subpart M fall protection thresholds and anchorage rules
Select PPE for arc flash, shock, and chemical hazards per NFPA 70E
Describe lockout/tagout steps for inverter and combiner servicing
Identify 1926 Subpart E and Subpart K electrical safety requirements for construction sites
Explain the hazards of DC arc faults and the role of string-level rapid shutdown
Your checkpoint
A site-specific job hazard analysis for a two-day rooftop installation, listing hazards, controls, and required PPE
Solar panel cleaning and system maintenance
Build a preventive maintenance schedule with inspection intervals for modules, inverters, and racking
Describe safe cleaning methods, water quality limits, and acceptable soiling thresholds
Diagnose common performance losses: soiling, shading, mismatch, and connector degradation
Interpret monitoring data to distinguish a string outage from a gradual degradation trend
Explain thermal imaging and insulation resistance testing for fault detection
Your checkpoint
A one-year maintenance checklist with measurable pass/fail criteria for each inspection item
PV systems fundamentals and applications & PV system design and installation & Electrical safety and the National Electrical Code (NFPA 70) & Grid-connected PV system design and installation & Occupational safety and health regulations for construction (OSHA 29 CFR 1926) & Solar panel cleaning and system maintenance
Complete a timed 60-question practice exam and score at least 80 percent
Review every missed item and write the governing concept for each error
Recompute string sizing, voltage drop, and battery sizing from memory
Recite NEC sections 690.8, 690.12, and 705.12 from a blank sheet
Rehearse safety scenarios covering fall protection and arc flash response
Your checkpoint
A scored practice exam plus a one-page error log categorizing every miss by domain, with the corrected rule for each
Milestones
Week 2: Score 80 percent or better on a 20-question quiz covering domains 1 and 2, including two sizing calculations
Week 4: Produce the NEC citation sheet from memory for at least 10 of 12 scenarios, and correctly size a source circuit overcurrent device
Week 6: Complete a single-line diagram and a job hazard analysis that a peer can review without asking clarifying questions
Week 8: Score 80 percent or better on a full-length timed practice exam with no domain below 70 percent