NABCEP PVSI · Give each week a clear focus.

8 weeks · About 7 hours per week

Week 1

Knowledge of applicable codes and ordinances

  • Map the NEC articles that govern PV installations (690, 705, 250, 310, 480, 250.122, 705.12) into a one-page cross-reference sheet

  • Locate the adopted code cycle and local amendments for three jurisdictions you plan to work in and note the differences in a comparison table

  • Practice applying 690.12 rapid shutdown boundary requirements to three hypothetical array layouts and write out where the controlled conductor limit falls

  • Define the permit submittal package contents for a residential rooftop PV system by listing every drawing, calculation, and form a typical AHJ requires

Your checkpoint

A one-page code cross-reference sheet plus a three-jurisdiction amendment comparison table, reviewed against your notes for accuracy

Week 2

Knowledge of applicable codes and ordinances

  • Calculate minimum PV source and output circuit conductor ampacity using 690.8(A) and 690.8(B) factors for two string configurations

  • Determine 705.12(B)(2) busbar and feeder connection allowances for line-side, load-side, and supply-side connections and label each method

  • Size an equipment grounding conductor and system bonding jumper for a given inverter and array combination using 250.122 and 690.45

  • Identify labeling requirements from 690.56 and 705.12(B) and draft the exact text for each placard

  • Explain in writing how 690.15 disconnection means differ from 705.12(B) requirements for a supply-side connection

Your checkpoint

A worked calculation packet for two systems showing conductor ampacity, OCPD selection, busbar loading, and required labels

Week 3

Identification of all system components

  • Diagram a full grid-tied string inverter system from array to point of interconnection, labeling every component and its function

  • Compare string, microinverter, and DC-optimizer architectures on shading tolerance, monitoring granularity, and rapid shutdown compliance

  • Specify module, inverter, and racking datasheet parameters that must be verified before design and list where each appears on a datasheet

  • Select and justify combiner box, DC disconnect, and surge protection components for a 10 kW residential system

  • Trace the AC and DC sides of a battery-backed hybrid system and identify the transfer and backup interface components

Your checkpoint

Three fully labeled single-line diagrams (string inverter, microinverter, hybrid with storage) with a component function key

Week 4

Identification of all system components & Assessment of system safety and operation

  • Assemble a component specification matrix covering modules, inverters, racking, rapid shutdown devices, and conductors with voltage, current, and temperature ratings

  • Verify string sizing against inverter MPPT window and maximum system voltage at record low temperature using datasheet coefficients

  • Explain how module temperature coefficient of Voc drives cold-weather string length limits and show the calculation

  • List the safety hazards introduced by each major component and the protective device or practice that mitigates it

Your checkpoint

A component specification matrix plus a completed string sizing worksheet for a cold-climate design showing pass/fail against inverter limits

Week 5

Assessment of system safety and operation

  • Describe the sequence for safe de-energization of a PV array including DC arc hazard controls and verify-the-absence-of-voltage steps

  • Identify arc-fault and ground-fault detection requirements for PV systems and explain how each protective function is tested

  • Evaluate a scenario where an array remains energized after AC disconnect and write the correct lockout and diagnostic procedure

  • List PPE and test instrument categories appropriate for PV DC and AC work, including CAT ratings for meters

Your checkpoint

A written de-energization and lockout procedure for a residential PV system with a test-verification checklist

Week 6

Assessment of system safety and operation & Interpretation of design plans and building documents, on-site inspections, and reporting results

  • Read a sample permit drawing set and extract array layout, conductor routing, and interconnection details into an inspection checklist

  • Match each installed component to the approved plan and list the discrepancies an inspector would flag

  • Perform a virtual commissioning walkthrough covering insulation resistance, open-circuit voltage, and AC output verification, recording expected values

  • Draft a corrective-action report template for deficiencies found during an inspection

Your checkpoint

A completed mock inspection checklist on a sample drawing set with at least five discrepancies documented and corrective actions proposed

Week 7

Interpretation of design plans and building documents, on-site inspections, and reporting results

  • Interpret structural and site plan sheets to confirm roof framing, attachment spacing, and setback compliance

  • Cross-check a utility interconnection application against the design to confirm export limits and metering configuration

  • Write inspection findings in a format that separates code citations from observations and recommended corrections

  • Explain how to document as-built changes and the revision process required before final inspection

Your checkpoint

A mock inspection report with code citations for each finding and a short as-built deviation log

Week 8

Knowledge of applicable codes and ordinances & Identification of all system components & Assessment of system safety and operation & Interpretation of design plans and building documents, on-site inspections, and reporting results

  • Complete a timed 60-question practice set spanning all four domains and score each domain separately

  • Re-study the two weakest domains by reworking missed items to their underlying code or component principle

  • Recite from memory the key NEC sections for rapid shutdown, interconnection, conductor sizing, and grounding

  • Rehearse explaining an inspection finding verbally in under two minutes as if reporting to a client or AHJ

Your checkpoint

A scored practice exam with a domain-by-domain error analysis and a one-page final review sheet of weak areas

Milestones

Week 2: Can complete conductor ampacity, OCPD, and busbar loading calculations for a new system without referencing worked examples, scoring at least 80% on a self-made 10-question calculation quiz

Week 4: Can produce a labeled single-line diagram and correct string sizing for a new system in under 45 minutes with no datasheet lookups missed

Week 6: Can identify at least five plan-to-installation discrepancies in a sample drawing set and cite the governing code section for each

Week 8: Scores 75% or higher overall on the timed practice exam with no domain below 65%, and has a written remediation plan for any domain under 70%