NABCEP PVSI study plan
NABCEP PVSI · Give each week a clear focus.
8 weeks · About 7 hours per week
Knowledge of applicable codes and ordinances
Map the NEC articles that govern PV installations (690, 705, 250, 310, 480, 250.122, 705.12) into a one-page cross-reference sheet
Locate the adopted code cycle and local amendments for three jurisdictions you plan to work in and note the differences in a comparison table
Practice applying 690.12 rapid shutdown boundary requirements to three hypothetical array layouts and write out where the controlled conductor limit falls
Define the permit submittal package contents for a residential rooftop PV system by listing every drawing, calculation, and form a typical AHJ requires
Your checkpoint
A one-page code cross-reference sheet plus a three-jurisdiction amendment comparison table, reviewed against your notes for accuracy
Knowledge of applicable codes and ordinances
Calculate minimum PV source and output circuit conductor ampacity using 690.8(A) and 690.8(B) factors for two string configurations
Determine 705.12(B)(2) busbar and feeder connection allowances for line-side, load-side, and supply-side connections and label each method
Size an equipment grounding conductor and system bonding jumper for a given inverter and array combination using 250.122 and 690.45
Identify labeling requirements from 690.56 and 705.12(B) and draft the exact text for each placard
Explain in writing how 690.15 disconnection means differ from 705.12(B) requirements for a supply-side connection
Your checkpoint
A worked calculation packet for two systems showing conductor ampacity, OCPD selection, busbar loading, and required labels
Identification of all system components
Diagram a full grid-tied string inverter system from array to point of interconnection, labeling every component and its function
Compare string, microinverter, and DC-optimizer architectures on shading tolerance, monitoring granularity, and rapid shutdown compliance
Specify module, inverter, and racking datasheet parameters that must be verified before design and list where each appears on a datasheet
Select and justify combiner box, DC disconnect, and surge protection components for a 10 kW residential system
Trace the AC and DC sides of a battery-backed hybrid system and identify the transfer and backup interface components
Your checkpoint
Three fully labeled single-line diagrams (string inverter, microinverter, hybrid with storage) with a component function key
Identification of all system components & Assessment of system safety and operation
Assemble a component specification matrix covering modules, inverters, racking, rapid shutdown devices, and conductors with voltage, current, and temperature ratings
Verify string sizing against inverter MPPT window and maximum system voltage at record low temperature using datasheet coefficients
Explain how module temperature coefficient of Voc drives cold-weather string length limits and show the calculation
List the safety hazards introduced by each major component and the protective device or practice that mitigates it
Your checkpoint
A component specification matrix plus a completed string sizing worksheet for a cold-climate design showing pass/fail against inverter limits
Assessment of system safety and operation
Describe the sequence for safe de-energization of a PV array including DC arc hazard controls and verify-the-absence-of-voltage steps
Identify arc-fault and ground-fault detection requirements for PV systems and explain how each protective function is tested
Evaluate a scenario where an array remains energized after AC disconnect and write the correct lockout and diagnostic procedure
List PPE and test instrument categories appropriate for PV DC and AC work, including CAT ratings for meters
Your checkpoint
A written de-energization and lockout procedure for a residential PV system with a test-verification checklist
Assessment of system safety and operation & Interpretation of design plans and building documents, on-site inspections, and reporting results
Read a sample permit drawing set and extract array layout, conductor routing, and interconnection details into an inspection checklist
Match each installed component to the approved plan and list the discrepancies an inspector would flag
Perform a virtual commissioning walkthrough covering insulation resistance, open-circuit voltage, and AC output verification, recording expected values
Draft a corrective-action report template for deficiencies found during an inspection
Your checkpoint
A completed mock inspection checklist on a sample drawing set with at least five discrepancies documented and corrective actions proposed
Interpretation of design plans and building documents, on-site inspections, and reporting results
Interpret structural and site plan sheets to confirm roof framing, attachment spacing, and setback compliance
Cross-check a utility interconnection application against the design to confirm export limits and metering configuration
Write inspection findings in a format that separates code citations from observations and recommended corrections
Explain how to document as-built changes and the revision process required before final inspection
Your checkpoint
A mock inspection report with code citations for each finding and a short as-built deviation log
Knowledge of applicable codes and ordinances & Identification of all system components & Assessment of system safety and operation & Interpretation of design plans and building documents, on-site inspections, and reporting results
Complete a timed 60-question practice set spanning all four domains and score each domain separately
Re-study the two weakest domains by reworking missed items to their underlying code or component principle
Recite from memory the key NEC sections for rapid shutdown, interconnection, conductor sizing, and grounding
Rehearse explaining an inspection finding verbally in under two minutes as if reporting to a client or AHJ
Your checkpoint
A scored practice exam with a domain-by-domain error analysis and a one-page final review sheet of weak areas
Milestones
Week 2: Can complete conductor ampacity, OCPD, and busbar loading calculations for a new system without referencing worked examples, scoring at least 80% on a self-made 10-question calculation quiz
Week 4: Can produce a labeled single-line diagram and correct string sizing for a new system in under 45 minutes with no datasheet lookups missed
Week 6: Can identify at least five plan-to-installation discrepancies in a sample drawing set and cite the governing code section for each
Week 8: Scores 75% or higher overall on the timed practice exam with no domain below 65%, and has a written remediation plan for any domain under 70%