NASCLA Contractor key terms
NASCLA Contractor · Get comfortable with the vocabulary.
- Critical Path Method (CPM)
- Related: Total Float, Schedule of Values
A scheduling technique that identifies the longest sequence of dependent activities in a project, thereby determining the minimum project duration and showing which activities cannot be delayed without delaying completion.
- Total Float
- Related: Critical Path Method (CPM)
The amount of time an activity can be delayed from its early start without delaying the project completion date; activities lying on the critical path have zero float.
- Schedule of Values
- Related: Earned Value Management, Retainage
An itemized breakdown of the contract sum allocated to individual work items, used to evaluate progress and calculate the amount of each monthly progress payment.
- Earned Value Management
- Related: Schedule of Values, Critical Path Method (CPM)
A cost-control method that compares the budgeted cost of work performed with actual costs and planned value to measure schedule and cost performance on a project.
- Change Order
- Related: Request for Information (RFI), Substantial Completion
A written amendment to the construction contract that modifies scope, price, or schedule, and becomes binding once signed by the owner and accepted by the contractor.
- Request for Information (RFI)
- Related: Submittal, Change Order
A formal written question from the contractor to the design professional asking for clarification of the contract documents; the response becomes part of the project record.
- Submittal
- Related: Request for Information (RFI), Mock-Up
Shop drawings, product data, samples, or similar documents the contractor provides to the designer for review and approval before fabricating or installing the related work.
- Retainage
- Related: Schedule of Values, Substantial Completion
A percentage of each progress payment withheld by the owner until completion or specified milestones, giving the owner leverage to ensure final completion and correction of defects.
- Substantial Completion
- Related: Punch List, Retainage
The stage at which the work is sufficiently complete in accordance with the contract documents that the owner can occupy or use it for its intended purpose.
- Liquidated Damages
- Related: Substantial Completion, Change Order
A pre-agreed amount charged to the contractor for each day of delay past the contract completion date, treated as an estimate of owner loss rather than a penalty.
- As-Built Drawings
- Related: Daily Field Report, Submittal
Marked-up drawings the contractor maintains during construction and delivers at closeout, showing actual dimensions, locations, and deviations from the original design documents.
- Bid Bond
- Related: Performance Bond, Payment Bond
A bond guaranteeing that a bidder will enter into the contract and furnish required performance and payment bonds if awarded the work; forfeited if the bidder defaults.
- Performance Bond
- Related: Payment Bond, Surety
A surety bond protecting the owner if the contractor fails to perform the contract, allowing the surety to complete the work or pay for its completion.
- Payment Bond
- Related: Lien, Performance Bond
A surety bond guaranteeing payment to subcontractors, laborers, and suppliers for work and materials furnished on the project, shielding the owner from mechanics liens.
- Contingency
- Related: Guaranteed Maximum Price (GMP), Change Order
A reserve included in an estimate or budget to cover unforeseen costs, minor scope changes, or price escalation; it is not a markup or profit item.
- Guaranteed Maximum Price (GMP)
- Related: Contingency, Construction Manager at Risk (CMAR)
A contract arrangement that caps the amount the owner will pay; savings may be shared, and the contractor absorbs overruns not caused by owner-directed changes.
- Lump Sum Contract
- Related: Unit Price Contract, Scope of Work
An agreement in which the contractor performs a defined scope for a single fixed price, bearing the risk of quantity and cost variations within that scope.
- Unit Price Contract
- Related: Lump Sum Contract, Change Order
An agreement that pays the contractor a fixed price for each unit of work actually performed, with the total contract value set by measured quantities.
- Work Breakdown Structure
- Related: Schedule of Values, Critical Path Method (CPM)
A hierarchical division of the project into manageable work packages used for estimating, scheduling, cost control, and assigning responsibility to specific parties.
- Design-Build
- Related: Construction Manager at Risk (CMAR), Guaranteed Maximum Price (GMP)
A delivery method in which a single entity contracts with the owner for both design and construction, concentrating responsibility and often shortening the overall schedule.
- Construction Manager at Risk (CMAR)
- Related: Guaranteed Maximum Price (GMP), Design-Build
A delivery method in which a construction manager is engaged early for a fee to advise on design and cost, then holds a contract to build within a guaranteed maximum price.
- Scope of Work
- Related: Lump Sum Contract, Change Order
A written statement defining the work, materials, and deliverables included in a contract, and by implication the items that are excluded.
- Job Safety Analysis
- Related: Competent Person, Personal Protective Equipment (PPE)
A procedure that breaks a task into steps, identifies hazards at each step, and defines controls before work starts, often documented as a pre-task briefing.
- Competent Person
- Related: Job Safety Analysis, Excavation Protective System
An individual designated by the employer who can identify existing and predictable hazards in the surroundings and has authority to take prompt corrective action.
- Personal Protective Equipment (PPE)
- Related: Job Safety Analysis, Fall Protection
Items such as hard hats, safety glasses, gloves, and fall harnesses worn by workers to reduce exposure to hazards when other controls cannot fully eliminate them.
- Hazard Communication Standard
- Related: Personal Protective Equipment (PPE), Job Safety Analysis
The OSHA rule requiring chemical hazard evaluation, container labeling, safety data sheets, and worker training so employees understand the chemicals they handle.
- Excavation Protective System
- Related: Competent Person, Job Safety Analysis
A method such as sloping, benching, shoring, or shielding used to protect workers in trenches from cave-ins, generally required for excavations five feet deep or more.
- Fall Protection
- Related: Personal Protective Equipment (PPE), Competent Person
Systems and practices such as guardrails, safety nets, and personal fall arrest equipment used to protect workers from falls at elevations of six feet or more in construction.
- Punch List
- Related: Substantial Completion, Quality Control Plan
A list of incomplete or defective items identified near project completion that the contractor must correct before final acceptance and release of final payment.
- Mock-Up
- Related: Submittal, Quality Control Plan
A full-size physical sample of a building component or assembly built on site to establish a quality standard and obtain approval before full-scale installation.
- Quality Control Plan
- Related: Punch List, Mock-Up
A project-specific document describing inspection procedures, testing requirements, acceptance criteria, and the parties responsible for verifying that work meets the specifications.
- Certificate of Occupancy
- Related: Occupancy Classification, Substantial Completion
An official document issued by the local building authority confirming that a completed structure complies with applicable codes and is approved for its intended use.
- Occupancy Classification
- Related: Certificate of Occupancy, Fire-Resistance Rating
The category assigned to a building based on its intended use, such as business, mercantile, or residential, which drives allowable height, area, and fire protection requirements.
- Fire-Resistance Rating
- Related: Occupancy Classification, Egress
The period, usually stated in hours, that a building assembly resists a standardized fire exposure, used to satisfy code requirements for separations and structural protection.
- Egress
- Related: Occupancy Classification, Fire-Resistance Rating
The continuous path for leaving a building, comprising exit access, the exit itself, and exit discharge, sized and arranged so occupants can evacuate safely in an emergency.
- Building Information Modeling (BIM)
- Related: Work Breakdown Structure, Submittal
A digital three-dimensional model of a building containing coordinated geometry and data used for design coordination, clash detection, quantity takeoff, and construction planning.
- Daily Field Report
- Related: As-Built Drawings, Request for Information (RFI)
A record kept by site supervision documenting weather, workforce, equipment, deliveries, visitors, and notable events each day, supporting progress tracking and later claims.
- Lien
- Related: Payment Bond, Retainage
A legal claim against real property filed by a party who furnished labor or materials and was not paid, potentially allowing the property to be sold to satisfy the debt.
- Surety
- Related: Performance Bond, Bid Bond
A company that issues bonds guaranteeing a contractor's performance or payment obligations, after evaluating the contractor's financial strength, experience, and capacity to complete work.