NATE Low-GWP study materials
NATE Low-GWP study resources

NATE Low-GWP study plan

NATE Low-GWP · Give each week a clear focus.

8 weeks · About 6 hours per week

Week 1

Low GWP Refrigerant (LGWP)

  • Define global warming potential (GWP) and distinguish it from ozone depletion potential (ODP), stating the reference gas and time horizon used for each

  • Rank the common low-GWP refrigerants (R-32, R-454B, R-466A, R-1234yf, R-1234ze, R-744, R-717) by GWP and by ASHRAE 34 safety class

  • Explain the Kigali Amendment phase-down schedule and how the A2L subclass was created to enable flammable-but-lower-risk refrigerants

  • Identify the three flammability criteria (lower flammability limit, heat of combustion, burning velocity) that separate A2L from A3

Your checkpoint

A one-page handwritten or typed reference table listing at least eight low-GWP refrigerants with GWP, safety class, and typical application, scored against an answer key you build from the standards

Week 2

Low GWP Refrigerant (LGWP)

  • Interpret ASHRAE 15 and ASHRAE 15.2 requirements for refrigerant concentration limit (RCL), occupied space, and institutional occupancy

  • Calculate the allowable charge for a given room volume using RCL and compare it to the nameplate charge

  • Describe how A2L refrigerants change ventilation, leak detection, and signage requirements versus A1

  • Explain the role of the refrigerant detection system in mitigating ignition risk

Your checkpoint

Three worked charge-limit calculations for a residential, a commercial, and an institutional space, each with the RCL source cited and a pass/fail conclusion

Week 3

Low GWP Refrigerant (LGWP)

  • List the required service-tool changes for A2L systems: recovery machine, vacuum pump, manifold, hoses, and leak detector ratings

  • Explain why standard A1 leak detectors and recovery cylinders may not be acceptable for A2L

  • Describe safe handling and cylinder storage practices for flammable refrigerants, including transport classification

  • Identify personal protective equipment and ignition-source controls needed during brazing and recovery

Your checkpoint

A service-van readiness checklist of at least 15 line items covering tools, PPE, signage, and cylinder storage, each item marked compliant or needs-purchase

Week 4

Low GWP Refrigerant (LGWP)

  • Trace the charge, recovery, evacuation, and recharge sequence for an A2L system from start to finish

  • Explain the effect of glide on charging method for zeotropic blends such as R-454B and R-466A

  • Describe how to charge a system in liquid phase and why vapor charging is prohibited for blends

  • Identify the leak-check and pressure-test procedures that differ for flammable refrigerants

Your checkpoint

A written step-by-step commissioning procedure for one A2L residential system, with glide, liquid charging, and leak-check notes, reviewed against manufacturer literature

Week 5

Low GWP Refrigerant (LGWP)

  • Compare retrofit versus replacement decisions when moving from R-410A to a low-GWP alternative

  • Explain oil compatibility and miscibility issues when changing refrigerant families

  • Describe the impact of low-GWP refrigerants on compressor discharge temperature, capacity, and pressure ratios

  • Identify which components (expansion device, controls, sensors) typically require change during a low-GWP conversion

Your checkpoint

A decision matrix comparing retrofit and replace options for two scenarios, with at least four technical criteria and a justified recommendation for each

Week 6

Low GWP Refrigerant (LGWP)

  • Explain the regulatory drivers: EPA Significant New Alternatives Policy (SNAP), the AIM Act, and HFC allowance allocation

  • Describe refrigerant reclamation, cylinder tracking, and recordkeeping obligations under current rules

  • Identify technician certification and training requirements tied to handling flammable refrigerants

  • Summarize how leak-rate reporting and refrigerant management plans apply to commercial equipment

Your checkpoint

A one-page compliance summary mapping five regulatory requirements to the specific on-site action each demands, with the rule citation for each

Week 7

Low GWP Refrigerant (LGWP)

  • Diagnose common A2L system faults: sensor faults, charge imbalance, and ignition-source proximity issues

  • Apply a systematic troubleshooting sequence that separates refrigerant-side from air-side and electrical faults

  • Interpret superheat, subcooling, and glide-adjusted saturation readings on a zeotropic system

  • Explain how leak detection system alarms should be verified and reset

Your checkpoint

Five fault scenarios written out with symptom, likely cause, diagnostic test, and corrective action, each checked against a manufacturer troubleshooting guide

Week 8

Low GWP Refrigerant (LGWP)

  • Review all prior deliverables and close gaps flagged in earlier self-checks

  • Rehearse explaining GWP, safety class, charge limits, and service procedures aloud without notes

  • Complete a timed practice set of at least 50 questions spanning the full domain

  • Identify the two weakest subtopics and write a targeted remediation plan for after the exam date

Your checkpoint

A timed practice exam score of at least 80 percent plus a written remediation plan naming the two weakest subtopics and the specific study action for each

Milestones

Week 2: Can state the GWP and safety class of eight low-GWP refrigerants from memory and complete an RCL charge calculation without reference

Week 4: Service-van checklist complete and commissioning procedure written; can list the tool changes required for A2L without notes

Week 6: Can explain the Kigali/AIM Act phase-down and name three recordkeeping obligations without reference

Week 8: Score at least 80 percent on a 50-question timed practice set and have a written remediation plan for the two weakest subtopics