NCCCO Rigger Level II study materials
NCCCO Rigger Level II study resources

NCCCO Rigger Level II cheat sheet

NCCCO Rigger Level II · Keep the key ideas within reach.

Quick reference

Site and Lift Planning

  • Load weight data: steel 490 lb/ft³ (plate ≈ 40.8 lb/ft² per inch of thickness), concrete 150 lb/ft³, water 62.4 lb/ft³; add rigging, attachments, and any absorbed water or debris.

  • Net capacity = manufacturer's rated capacity at the actual radius and boom configuration, minus jib, hook block, slings, spreader beam, and all below-hook device weights.

  • Sling angle factor = 1 ÷ sin θ, with θ measured from horizontal: 60° = 1.155, 45° = 1.414, 30° = 2.0 times the vertical share.

  • Tandem lift share: load on crane A = total load × d(B) ÷ (d(A) + d(B)), where d is the horizontal distance from each pick point to the load center of gravity.

  • Ground bearing pressure = total weight (crane plus load) ÷ effective mat or float area; doubling both mat dimensions quarters the pressure per unit area.

  • OSHA minimum approach distance to energized lines: 10 ft up to 50 kV; 15 ft for 50–200 kV; 20 ft for 200–350 kV; 25 ft for 350–500 kV; 35 ft for 500–750 kV; 45 ft for 750–1000 kV.

  • Critical lift triggers: over 75% of rated capacity, more than one crane, travel over personnel or occupied structures, or proximity to energized lines - each requires an engineered lift plan.

  • Site survey checklist: soil bearing and underground voids or utilities, slope, overhead obstructions and lines, access and swing clearance, landing area, and exclusion zone boundaries.

Quick reference

Rigging Selection and Configuration

  • Sling tension per leg: T = (W ÷ n) × (L ÷ H), where n is the number of load-bearing legs, L the sling leg length, and H the head height from hook to load.

  • Wire rope sling efficiency: vertical 100%, choker about 75%, basket 200% (D/d ≥ 25 with vertical legs); apply the angle factor to any leg that is not vertical.

  • Synthetic web sling hitch factors: vertical 1.0, choker 0.8, basket 2.0; never knot a web sling and protect it from cuts, sharp edges, and heat.

  • Count only 2 load-bearing legs on a 3-leg bridle and only 3 on a 4-leg bridle, because leg loading is never equal.

  • Keep sling legs 30° or more above horizontal; at 30° the horizontal component equals 0.866 of the vertical share per leg, which can crush or slide the load.

  • Shackles: pin fully seated, load carried on the bow, and screw-pin shackles avoided where rotation could back the pin out; never substitute a bolt for the pin.

  • The hook point must be directly above the load center of gravity; an off-center pick tilts the load and shifts weight into fewer sling legs.

  • A spreader beam carries the horizontal sling component as compression in the beam; verify beam capacity, end fitting capacity, and top sling angles.

  • Rigging hardware working load limit must equal or exceed the calculated leg tension, accounting for hitch type and angle.

Quick reference

Inspection of Rigging Equipment

  • Two inspection levels: a visual pre-use inspection by the user before every lift, and a documented periodic inspection by a designated person at least annually.

  • Wire rope sling removal: 10 randomly distributed broken wires in one lay, 5 broken wires in one strand in one lay, or any kink, birdcage, core protrusion, or severe corrosion and abrasion.

  • Chain sling removal: cracks, bent or twisted links, gouges or nicks, wear over 10% of link diameter, stretch beyond the manufacturer's limit, or a missing grade tag.

  • Web sling removal: holes, cuts, snags, burns, ultraviolet or chemical degradation, broken or worn stitching, knots, or a missing or illegible tag.

  • Hook removal: throat opening increased more than 15%, wear more than 10% of the original dimension, bend or twist more than 10°, cracks, or a latch that will not close.

  • Shackle, ring, and link removal: wear over 10% of original diameter, cracks, distortion, or damaged threads.

  • Any sling or fitting without a legible tag showing rated capacity, reach, material, and manufacturer is removed from service.

  • Defective gear is tagged DO NOT USE, physically removed from the work area, and the finding is documented in the inspection record.

Quick reference

Execution of Complex Lifts

  • The pre-lift meeting covers plan, load weight, rigging configuration, roles, signal method, lift sequence, exclusion zone, and emergency stop procedure.

  • Trial lift: raise the load a few inches and verify balance, rigging, brake holding, and crane stability before hoisting to full height.

  • Never shock load; start and stop smoothly, keep hoist lines vertical, and do not drag or side-pull a load.

  • Tag lines control rotation and swing; use at least one, more for long or high sail-area loads, and keep hands clear of wrap and pinch points.

  • No personnel under a suspended load; use push sticks and tag lines rather than hands to guide the load.

  • Multi-crane lifts: one lift director, one qualified signal person per crane, and continuous verification that each crane carries its planned share.

  • Monitor wind and weather continuously; stop when wind exceeds the manufacturer's limit or the load's sail area makes it uncontrollable.

  • Before release: confirm landing surface capacity, blocking or cribbing, load stability, and that rigging can be removed without pinch-point exposure.

Quick reference

Communication, Signaling, and Load Control

  • Only one designated, qualified signal person directs the crane at a time; anyone on site may give an emergency stop signal.

  • Hoist: forearm vertical, forefinger up, hand moved in small horizontal circles. Lower: arm extended downward, forefinger down, small horizontal circles.

  • Stop: arm extended, palm down, hand moved side to side. Emergency stop: both arms extended horizontally, palms down, moved rapidly side to side.

  • Radio: dedicated channel tested before the lift; commands are clear, acknowledged, and identify the crane and the signal person transmitting.

  • Voice signals are permitted only when distance and conditions allow and the operator and signal person have agreed on them in advance.

  • If a signal is unclear or conflicting signals are received, the operator stops until the designated signal person resumes control.

  • The signal person positions with an unobstructed view of both operator and load, and uses relay signalers when the sight line is blocked.