NCCCO Rigger Level II flashcards
NCCCO Rigger Level II · Build recall with a focused review session.
31 cards. Read the term and the definition here. The deck at the top of this page is optional.
- Steel plate weight per square foot
- Steel plate weighs about 40.8 pounds per square foot for each inch of thickness, derived from the 490 pounds per cubic foot density of steel.
- Net crane capacity
- Rated capacity at the working radius minus the weight of jib, hook block, slings, spreader beams, and all other below-hook devices and attachments.
- Critical lift definition
- A lift that exceeds 75 percent of the crane's rated capacity, involves more than one crane, or travels over personnel or an occupied structure.
- Tandem lift load share
- Total load times the distance from the other crane's pick point to the load center of gravity, divided by the distance between the two pick points.
- Power line minimum clearance
- Minimum approach for rigging near energized lines: 10 feet up to 50 kV, 15 feet for 50 to 200 kV, and 20 feet for 200 to 350 kV.
- Outrigger ground bearing pressure
- Total weight of crane plus load divided by the effective area of the outrigger float or mat; larger mats reduce the pressure in pounds per square inch.
- Rigging weight in capacity check
- Weight of all slings, shackles, spreader beams, and below-hook hardware must be added to the load when comparing against crane capacity.
- Choker hitch wire rope efficiency
- A choker hitch develops about 75 percent of the sling's single-leg vertical rated capacity, and that reduced value is used for all choker calculations.
- Sling tension formula
- Tension per leg equals the total load divided by the number of load-bearing legs, multiplied by the sling leg length divided by the head height.
- Sling angle multipliers
- Measured from horizontal, leg tension is 1.155 times its vertical share at 60 degrees, 1.414 times at 45 degrees, and 2.0 times at 30 degrees.
- Thirty degree minimum sling angle
- Keep sling legs at 30 degrees or more above horizontal; flatter angles greatly increase both leg tension and the horizontal force squeezing the load.
- Web sling hitch factors
- Synthetic web slings are rated at 100 percent capacity vertical, 80 percent in a choker hitch, and 200 percent in a basket hitch with vertical legs.
- Legs sharing a bridle load
- Assume only two legs of a three-leg bridle carry the load, and only three legs of a four-leg bridle, because load sharing is never equal.
- Spreader beam purpose
- It holds slings vertical or near vertical, converting the horizontal sling component into compression in the beam, which must be rated for that load.
- Wire rope sling broken wire limit
- Remove a wire rope sling from service when 10 randomly distributed broken wires appear in one lay, or 5 broken wires in one strand in one lay.
- Chain sling wear limit
- Remove chain when link diameter is worn more than 10 percent, links are cracked, bent, or twisted, or the sling has stretched beyond the manufacturer's limit.
- Hook throat opening limit
- Remove a hook when its throat opening has increased more than 15 percent, wear exceeds 10 percent, or it is bent or twisted more than 10 degrees.
- Shackle wear removal
- Remove a shackle when the bow or pin is worn more than 10 percent of its original dimension, or shows cracks, distortion, or damaged threads.
- Periodic inspection interval
- A documented periodic inspection of rigging equipment is required at least annually by a designated person, in addition to a visual check before each use.
- Web sling damage removal
- Remove web slings with holes, cuts, snags, burns, ultraviolet or chemical damage, broken stitching, knots, or missing or illegible capacity tags.
- Sling identification tag
- Every sling must carry a legible tag showing rated capacity, material, length, manufacturer, and serial number; slings without one are removed from service.
- Trial lift check
- Lift the load a few inches and verify the rigging, load balance, brake holding, and crane stability before hoisting to full height.
- Shock loading
- Sudden starts, stops, or jerks multiply the dynamic force on rigging well above the static weight and can exceed the rated capacity of slings and hardware.
- Tag line function
- It controls rotation and swinging of a suspended load; use at least one, more for long or high sail-area loads, and never wrap it around a hand.
- Vertical hoist line requirement
- Hoist lines must stay vertical; pulling or dragging a load sideways side-loads the boom and is allowed only with the manufacturer's approval.
- Multi-crane lift coordination
- One lift director coordinates the operation, each crane has its own qualified signal person, and load distribution is monitored to stay within the planned share.
- Emergency stop signal
- Both arms extended horizontally with palms down and moved rapidly side to side; any person on the job site may give this signal.
- Hoist hand signal
- Arm extended with the forearm vertical, forefinger pointing up, and the hand moved in small horizontal circles to raise the load.
- Designated signal person rule
- Only one designated, qualified signal person directs the operator at a time, but anyone may give a stop signal in an emergency.
- Radio signal protocol
- Use a dedicated channel tested before the lift, give clear commands that are acknowledged and repeated, and identify the signal person and crane being directed.
- Qualified signal person
- Knows the standard hand and voice signals, understands crane operations, and positions with a clear view of the operator and load, relaying signals when needed.