NCCCO Telehandler study materials
NCCCO Telehandler study resources

NCCCO Telehandler cheat sheet

NCCCO Telehandler ยท Keep the key ideas within reach.

Quick reference

Pre-Operational Inspection

  • Walk-around inspection covers all four sides plus the machine's top and underside before every shift or after any operator change; a defect found here is corrected before the engine is started.

  • Fluid checks: engine oil on the dipstick between ADD and FULL marks; coolant at the cold-fill line on the surge tank; hydraulic reservoir at the sight-glass level with the boom fully retracted and lowered.

  • Tire rule: inspect for cuts, sidewall bulges, exposed cord, and lug-nut torque; a pneumatic tire showing less than 1/4 in (6 mm) of tread or any cord exposure is removed from service.

  • Boom and attachment inspection points: wear pads, extend/retract chains, hose sheaves, quick-attach pins and locks, and the attachment's locking lever fully engaged.

  • ROPS/FOPS structure is inspected for cracks, bends, or unauthorized welds; a damaged ROPS/FOPS is never field-repaired without manufacturer approval.

  • Seat belt, seat bar, and operator-presence switch are function-tested: the machine must not start or travel unless the operator is seated with the belt latched.

  • Load chart must be legible, mounted in the cab, and matched to the installed attachment and tire type; a missing or unreadable chart makes the machine out of service.

  • Brake and steering checks before travel: service brake stops the machine from low speed, parking brake holds on a slope, and steering responds in both directions.

  • Daily inspection record is written and retained; defects are logged, and out-of-service tags stay on the machine until a qualified person signs off the repair.

Quick reference

Evaluate Jobsite Conditions

  • Ground bearing is the controlling limit: telehandlers concentrate load on the outriggers or front axle, so check for uncompacted fill, voids, buried tanks, and utility trenches under the wheel path.

  • Rule of thumb for slope: travel only on grades within the manufacturer's rating, keep the boom low and retracted, and never operate the frame-level function or lift on a side slope.

  • Overhead hazard clearance: identify power lines and treat all lines as energized; maintain the utility- or site-specified minimum approach distance for the boom and load.

  • Soil capacity check: compare the maximum outrigger or tire load from the load chart against the site's verified allowable bearing pressure, not against the machine's gross weight.

  • Site survey items: access roads, gate widths, bridge and floor load limits, overhead obstructions, blind corners, pedestrian routes, and designated spotter positions.

  • Wind: stop lifting when wind exceeds the manufacturer's limit or when the load's sail area makes it uncontrollable; a tag line is used to control rotation, not to arrest swing.

  • Excavations and slopes: keep the machine back from the edge by at least the depth of the excavation or the engineered distance, whichever is greater.

  • Surface conditions that change capacity: soft ground, ice, mud, and loose gravel reduce stability; steel plates or mats are used to spread load only when the manufacturer permits them.

Quick reference

Pre-Lift Preparations

  • Load weight determination: use the shipping papers, a scale ticket, or a calculated weight with a documented margin; never estimate from appearance.

  • Load chart reading order: select the correct attachment column, enter with the boom angle or radius, then read the capacity at the actual boom extension and height; all three must be satisfied simultaneously.

  • Radius is measured horizontally from the center of rotation (or the manufacturer's stated point) to the center of gravity of the load, not to the attachment pin.

  • Deduct the weight of all rigging and attachments not already included in the chart: slings, shackles, spreader beams, and the quick-attach device where the chart requires it.

  • Rigging check: verify sling capacity at the actual sling angle, hook latch closed, no side-loading of the hook, and the load's center of gravity below the lift point.

  • Communication plan: one designated signal person, agreed hand signals or radio channel, and a stop signal that any worker on site may give.

  • Lift plan elements: load description and weight, attachment, boom length, radius and height, capacity versus demand, ground conditions, travel path, and emergency lowering procedure.

  • Personnel exclusion: no one stands or passes under a suspended load, and the operator keeps the load in view or follows the signal person when visibility is blocked.

  • Tag lines are used on long or odd-shaped loads to control rotation; they are held from outside the load's fall zone, never wrapped around the hand.

Quick reference

Operate the Telehandler

  • Leveling rule: set the frame level using the frame-level function before raising the boom; the load chart assumes a level machine, and tilt reduces capacity.

  • Boom sequencing: extend the boom before lowering the angle when placing a load far out, and retract before raising the angle when bringing it in, to keep the load within the chart.

  • Travel with a load: keep the boom retracted and low (typically just above ground clearance), keep the load uphill on grades, and use the manufacturer's travel position.

  • Capacity at height: the chart capacity may decrease as the boom is raised even at constant radius; recheck the chart at the actual lift height, not only at ground level.

  • Sway control: use the frame-level and boom functions smoothly and one at a time; simultaneous functions plus wind can induce oscillation that the chart does not cover.

  • Load placement: set the load down, verify stability, then release rigging; never leave a suspended load unattended or rely on hydraulics to hold a load while the operator leaves the seat.

  • Emergency lowering: know the manual descent procedure and the location of the emergency lowering valve or pump before the lift begins.

  • Shutdown and parking: park on level ground, boom retracted and lowered, attachment flat on the ground, parking brake set, controls neutralized, and keys removed.