32 cards. Read the term and the definition here. The deck at the top of this page is optional.

Span of control
The number of workers one supervisor can effectively direct. First-line construction crews usually run five to twelve people; larger groups are split or given a lead worker.
Line authority
The right to direct the work of subordinates down the chain of command and to make binding decisions about their tasks. A crew leader holds line authority over assigned craft workers.
Progressive discipline
A stepped response to repeated performance or conduct problems: verbal coaching, written warning, suspension, termination. Each step is documented with the date, observed behavior, and required correction.
Situational leadership
Matching supervision style to worker readiness: directing for low skill and low will, coaching for low skill and high will, supporting for high skill and low will, delegating for high skill and high will.
Constructive feedback
A four-step conversation: state the observed behavior, describe its impact, agree on the specific change wanted, and set a follow-up date. It targets behavior, not personality.
Delegation
Assigning a task along with the authority, resources, and deadline needed to complete it. Confirm the worker has the skill and tools before releasing the task.
Maslow hierarchy
Needs ordered from basic to higher level: physiological, safety, social, esteem, self-actualization. On a jobsite, safety needs dominate and must be satisfied before motivation efforts work.
Grievance procedure
The contractual steps for resolving a worker complaint: hear it, verify facts against the agreement, respond within the stated time limit, and record the outcome.
Hierarchy of controls
Ranking of hazard controls from most to least effective: elimination, substitution, engineering controls, administrative controls, then personal protective equipment. PPE is the last line of defense.
Recordable incident rate
A frequency measure calculated as recordable cases times 200,000, divided by total hours worked. The 200,000 constant represents one hundred workers at forty hours for fifty weeks.
Fall protection thresholds
OSHA triggers for general construction work: six feet for general construction, ten feet on scaffolds, twenty-four feet on ladders, and fifteen feet for steel erection.
Competent person
A person who can identify existing and predictable hazards in the surroundings and who has authorization to take prompt corrective action to eliminate them.
Excavation edge distance
Spoil piles and equipment must stay at least two feet back from the trench edge. A competent person inspects the excavation daily and after rain, and access must be within twenty-five feet.
Hazard communication
Requires every hazardous chemical container to be labeled, a safety data sheet on site for each chemical, and worker training before any exposure occurs.
Lockout/tagout
Isolate the energy source, apply a lock and tag, and verify zero energy before work. Only the person who applied the lock may remove it.
Permit-required confined space
A space with a permit entry procedure: test the atmosphere before and during entry, keep an attendant outside, and have a rescue plan in place before anyone enters.
Near-miss reporting
Recording and investigating events that could have caused injury but did not. Near misses are leading indicators and are tracked to prevent recordable injuries.
Look-ahead schedule
A rolling three-week plan. The first week is committed work, weeks two and three are planned, and constraints are identified and removed before they block production.
Constraint removal
During look-ahead planning, identify missing material, labor, equipment, or information and assign each constraint an owner and a due date before the work week begins.
Critical path
The longest duration path through the project network. Any delay on the critical path delays project completion; activities off the path carry float.
Float
The amount of time an activity can slip without delaying project completion. It equals late start minus early start, or late finish minus early finish.
Earned value
Budgeted cost of work performed, calculated as percent complete times the budget. Dividing earned value by budget at completion gives percent complete by cost.
Crew balance
Matching crew size to the limiting resource, such as equipment, workspace, or material delivery. Adding workers beyond that limit raises cost without raising output.
Daily report
A daily record of date, weather, crew and hours, work performed by location, equipment, deliveries, visitors, delays, and safety events. It supports payment and delay claims.
Change order
A written modification to scope, price, or schedule. It requires a priced impact and owner approval before work proceeds; verbal direction does not authorize extra work.
Hold point
A stage in the work that cannot proceed until an inspection or sign-off occurs. It prevents later trades from covering nonconforming work.
Communication model
A sender encodes a message, it travels through a channel, the receiver decodes it, and feedback confirms understanding. Noise at any stage distorts the message.
Documentation rule
If it is not written down, it did not happen. Verbal directions, agreements, and field changes are confirmed in writing, such as a memo or email, the same day.
Request for information
A formal written question about unclear drawings or specifications. It states the reference, the question, a proposed solution, and any schedule impact, and is logged and tracked.
Meeting minutes
A written record of date, attendees, decisions, and action items with owner and due date. Minutes are distributed within twenty-four to forty-eight hours after the meeting.
Punch list
A walk-through list of deficiencies by location, each assigned to a responsible trade and date. Re-inspection and closure are required before final sign-off.
Client satisfaction drivers
Factors owners weigh most: on-time completion, site cleanliness, minimal disruption to their operations, responsiveness to concerns, and prompt punch-list closure.