crew leader

The person assigned to direct a small work group in the field, responsible for task assignment, quality, safety, and reporting progress to the superintendent while still performing hands-on work when needed.

Related: span of control, superintendent, foreman
span of control

The number of workers one supervisor can effectively direct. Keeping this number reasonable lets the leader observe work, correct problems early, and still handle planning and paperwork.

Related: crew leader, delegation, chain of command
chain of command

The defined line of authority from craft workers up through the crew leader, superintendent, and project manager. Clear lines prevent conflicting instructions and speed up decisions.

Related: span of control, superintendent, escalation
superintendent

The field manager responsible for overall site execution, scheduling, subcontractor coordination, and safety compliance. Crew leaders report progress, manpower, and problems to this role.

Related: crew leader, chain of command, three-week look-ahead
foreman

A working supervisor who leads a crew on a specific trade or area, often interchangeable with crew leader on smaller jobs, directing daily work and verifying that completed work meets specification.

Related: crew leader, quality control, punch list
delegation

Assigning a task and the authority to complete it to a crew member while remaining accountable for the result. Effective delegation includes clear expectations, resources, and a check-back point.

Related: span of control, accountability, task assignment
accountability

Owning the outcome of assigned work, including mistakes. Leaders build it by setting clear expectations, tracking results, and addressing shortfalls consistently rather than only when convenient.

Related: delegation, corrective action, progressive discipline
progressive discipline

A stepped response to repeated performance or conduct problems, typically verbal coaching, written warning, suspension, then removal, applied consistently and documented at each step.

Related: corrective action, accountability, documentation
corrective action

A specific step taken to fix a performance, quality, or safety deficiency, such as retraining, reassignment, or a written warning, with a follow-up date to confirm the fix held.

Related: progressive discipline, root cause analysis, toolbox talk
toolbox talk

A short, focused safety briefing held at the start of a shift covering the day's hazards, required controls, and worker questions. Attendance is recorded and topics match the actual tasks planned.

Related: job hazard analysis, pre-task planning, safety orientation
job hazard analysis

A written breakdown of a task into steps, the hazards at each step, and the controls that reduce them. It guides training and pre-task planning before work begins.

Related: toolbox talk, hierarchy of controls, pre-task planning
hierarchy of controls

The order of preference for reducing risk: eliminate the hazard, substitute something safer, use engineering controls, then administrative controls, with personal protective equipment as the last line of defense.

Related: job hazard analysis, personal protective equipment, permit-required confined space
personal protective equipment

Gear worn to shield a worker from hazards, such as hard hats, safety glasses, gloves, and fall protection. It protects the individual but does not remove the hazard itself.

Related: hierarchy of controls, fall protection, hazard communication
fall protection

Systems and practices that prevent or arrest falls from heights, including guardrails, personal fall arrest harnesses with anchorage, and safe ladder use, required above established trigger heights.

Related: personal protective equipment, competent person, job hazard analysis
permit-required confined space

A space with limited entry or exit that may contain a hazardous atmosphere, engulfment risk, or other serious danger, requiring an entry permit, atmospheric testing, attendant, and rescue plan before entry.

Related: competent person, hierarchy of controls, lockout/tagout
lockout/tagout

The procedure for isolating energy sources, applying locks and tags, and verifying zero energy before servicing equipment, preventing unexpected startup or release of stored energy that injures workers.

Related: permit-required confined space, job hazard analysis, near miss
competent person

A person capable of identifying existing and predictable hazards and authorized to take prompt corrective measures. Specific tasks such as scaffolding, excavations, and fall protection require one.

Related: fall protection, excavation competent person, job hazard analysis
near miss

An incident that did not cause injury or damage but could have. Reporting and investigating near misses reveals failing controls before someone is hurt.

Related: incident investigation, root cause analysis, safety observation
incident investigation

A structured review after an injury, property damage, or near miss to establish what happened, why controls failed, and what will change. Facts are gathered promptly and witnesses interviewed separately.

Related: near miss, root cause analysis, documentation
root cause analysis

A method such as the five whys or a fishbone diagram used to move past the immediate cause of a problem to the underlying system or planning failure that allowed it to happen.

Related: incident investigation, corrective action, near miss
safety observation

A planned, documented check of work in progress that notes safe and unsafe behaviors and conditions, then gives immediate feedback and tracks corrections to closure.

Related: near miss, toolbox talk, corrective action
safety orientation

The required introduction given to every worker before starting on site, covering site rules, hazards, emergency procedures, reporting, and the right to stop unsafe work.

Related: toolbox talk, stop-work authority, site logistics plan
stop-work authority

The right and duty of any worker to halt a task when conditions are unsafe or unclear, without fear of retaliation. Leaders reinforce it by thanking workers who use it.

Related: safety orientation, safety observation, accountability
excavation competent person

The designated person who inspects excavations daily and after rain or change, classifies soil, and determines protective systems such as sloping, shoring, or shielding before workers enter.

Related: competent person, job hazard analysis, permit-required confined space
hazard communication

The program for labeling containers, keeping safety data sheets accessible, and training workers on chemical hazards and protective measures where hazardous materials are stored or used.

Related: personal protective equipment, toolbox talk, safety orientation
pre-task planning

A short meeting before a specific activity where the crew reviews steps, hazards, controls, equipment, and who does what, confirming everyone understands before work starts.

Related: toolbox talk, job hazard analysis, task assignment
task assignment

Matching a defined scope of work to a worker or crew with the needed skills, tools, and information, stated with clear quantity, quality, and completion expectations.

Related: delegation, pre-task planning, manpower loading
three-week look-ahead

A rolling short-interval schedule showing work planned for the next few weeks, used to confirm materials, equipment, permits, and manpower are ready before crews arrive.

Related: look-ahead constraints, critical path, superintendent
look-ahead constraints

Anything that could block scheduled work, such as missing materials, unavailable equipment, incomplete predecessor work, or missing inspections. Constraints are identified early and cleared before the task start date.

Related: three-week look-ahead, critical path, material staging
critical path

The longest sequence of dependent activities that sets the project duration. Delay on the critical path delays completion, so these activities get priority for resources and attention.

Related: three-week look-ahead, look-ahead constraints, schedule variance
schedule variance

The difference between planned and actual progress for a task or project, expressed in time or percent complete. It signals where recovery or added resources may be needed.

Related: critical path, percent complete, production tracking
percent complete

The share of a defined scope already finished, ideally measured by installed quantity rather than hours spent, so progress reporting reflects real work in place.

Related: schedule variance, production tracking, quantity takeoff
production tracking

Recording installed quantities against labor hours over time to compare actual productivity with the estimate and to spot trends early enough to adjust crew size or methods.

Related: percent complete, schedule variance, quantity takeoff
quantity takeoff

A measured list of materials and work items derived from drawings and specifications, used for ordering, estimating labor, and setting the daily production target a crew works toward.

Related: production tracking, percent complete, material staging
material staging

Placing and organizing materials near where they will be installed so crews can work without delay, while keeping access, storage limits, and protection from damage or theft in mind.

Related: look-ahead constraints, site logistics plan, quantity takeoff
site logistics plan

A drawing and description of how the site is used: access routes, gates, laydown areas, temporary utilities, dumpsters, parking, and crane locations, updated as the project phase changes.

Related: material staging, safety orientation, look-ahead constraints
manpower loading

The planned number of workers by trade and day needed to meet the schedule. It is checked against available crew, space to work, and supervision capacity before committing.

Related: task assignment, span of control, three-week look-ahead
quality control

The planned inspections and checks that confirm installed work matches the drawings, specifications, and manufacturer instructions, done during construction rather than only at the end.

Related: punch list, rework, request for information
punch list

A written list of incomplete or deficient items found near the end of a project or phase, assigned to a responsible party with a due date and verified as corrected before closeout.

Related: quality control, rework, client satisfaction
rework

Labor and material spent correcting work that did not meet requirements the first time. Tracking rework by cause shows where training, planning, or inspection needs to improve.

Related: quality control, root cause analysis, punch list
request for information

A formal written question to the design team when drawings or specifications are unclear, conflicting, or missing. The answer is documented and becomes part of the project record.

Related: change order, as-built drawings, documentation
change order

A written, approved modification to scope, cost, or schedule signed by authorized parties. Work should not proceed on a change until direction is documented, even if pricing follows later.

Related: request for information, documentation, schedule variance
as-built drawings

Marked-up drawings kept current in the field showing actual installed locations, sizes, and routing that differ from the design documents, used for closeout and future maintenance.

Related: request for information, documentation, punch list
daily report

A record kept for each shift covering manpower, work performed, equipment used, deliveries, weather, visitors, delays, and incidents. It is the primary evidence for delay and change claims.

Related: documentation, schedule variance, change order
documentation

The practice of recording decisions, instructions, conditions, and events in writing close to when they happen, so the project has a reliable record if disputes or claims arise.

Related: daily report, change order, progressive discipline
escalation

Raising an issue to the next level of authority when it exceeds the leader's scope, resources, or decision rights, done promptly with the facts and options clearly stated.

Related: chain of command, request for information, accountability
constructive feedback

Specific, timely, behavior-focused input describing what happened, its effect, and what to do instead, delivered privately and followed by confirmation that the change occurred.

Related: corrective action, accountability, toolbox talk
active listening

Listening to understand rather than to reply: giving attention, asking clarifying questions, and restating the speaker's point before responding, which reduces miscommunication on noisy sites.

Related: constructive feedback, toolbox talk, escalation
client satisfaction

The owner's and end user's judgment of the finished work and the experience of getting there, shaped by quality, schedule reliability, cleanliness, responsiveness, and how problems were handled.

Related: punch list, quality control, daily report