NCCER Heavy Equipment study materials
NCCER Heavy Equipment study resources

NCCER Heavy Equipment flashcards

NCCER Heavy Equipment · Build recall with a focused review session.

32 cards. Read the term and the definition here. The deck at the top of this page is optional.

Swing radius
The arc swept by an excavator's counterweight and attachment as the house rotates. Personnel stay outside it because the tail swing can exceed the track width.
Three points of contact
A mounting rule requiring two hands and one foot, or two feet and one hand, on the machine at all times to prevent falls when entering or exiting equipment.
Call 811 before digging
The free utility locate notification made before excavation. Locators mark buried lines, and digging inside the marked tolerance zone must be done by hand.
ROPS
Roll-over protective structure: a frame that protects the operator if the machine overturns. It must never be welded, drilled, or modified, and it requires a worn seat belt.
Walk-around inspection
The pre-shift check in which the operator circles the machine looking for leaks, damaged hoses, loose pins, worn tires or tracks, and missing guards or safety devices.
Hour meter
A gauge that records machine running time. Maintenance intervals, oil changes, and filter service are scheduled from the hours it shows rather than from calendar dates.
Track tension
The amount of slack in a crawler track. Too loose causes derailment, while too tight accelerates wear on pins, bushings, and drive sprockets.
Stop hand signal
Arm extended horizontally to the side with the palm down, swung back and forth. The operator must stop the machine immediately when this signal is given.
Emergency stop signal
Both arms extended horizontally to the sides with palms down, swung back and forth, telling the operator to shut down movement at once.
Load radius
The horizontal distance from the machine's rotation center to the load. Lifting capacity decreases as the radius increases, so the load chart must be consulted.
Swell factor
The percentage by which soil volume increases when excavated from its natural bank state. Swell equals loose volume minus bank volume, divided by bank volume, times 100.
Load factor
Bank volume divided by loose volume for a given soil. Multiplying a loose cubic yard quantity by the load factor converts it to equivalent bank cubic yards.
Type A soil
OSHA classification for cohesive soil with an unconfined compressive strength of 1.5 tons per square foot or more. It cannot be fissured, subject to vibration, or previously disturbed.
Optimum moisture content
The water content at which a soil compacts to its maximum dry density. Adding or removing water from this point lowers the density that can be achieved.
Protective system
Shoring, shielding, sloping, or benching used to protect workers from cave-ins. It is required in trenches 5 feet deep or more unless the excavation is entirely in stable rock.
Trench box
A prefabricated shield that protects workers inside a trench. It does not shore the walls and must be rated, inspected, and installed according to the manufacturer's instructions.
Spoil pile setback
Excavated material and equipment are kept at least 2 feet back from the trench edge to reduce surcharge loading that can contribute to a cave-in.
Trench definition
An excavation that is deeper than it is wide and no more than 15 feet wide at the bottom. Deeper or wider cuts are classified as excavations instead.
Benchmark
A fixed point of known elevation used as the reference for all grade work on a site. Other elevations are measured from it or transferred from it.
Cut and fill
Cut equals existing elevation minus design elevation when positive. Fill equals design elevation minus existing elevation when the ground must be raised.
Percent grade
Rise divided by run, multiplied by 100. A 1 percent grade rises or falls 1 foot over a horizontal distance of 100 feet.
Slot dozing
A dozer technique of pushing in the same channel repeatedly so the blade loads are contained by the ridges, reducing spillage and increasing production.
Loader cycle
The four steps of loader production: load the bucket, travel to the truck, dump, and return. Cycle time is the main control on production.
Push loading
A dozer pushing the rear of a scraper during the cut to shorten load time and increase the load carried, raising production in stiff or tough soils.
Scraper bowl
The open, apron-controlled container on a scraper that cuts, holds, and dumps soil. It loads best in sandy or loamy material, not in rock.
Moldboard
The curved blade mounted mid-frame on a motor grader. Its angle, pitch, and side shift shape and move material for grading, ditching, and road crowning.
Backhoe stabilizers
Hydraulic legs lowered to lift and level the rear of a backhoe loader before digging. They transfer digging forces into the ground and keep the machine from moving.
Grader articulation
A joint that lets a motor grader's front frame swing relative to the rear, shortening the turning radius and allowing the blade to be offset for bank cutting.
Excavator tail swing
The distance the counterweight extends beyond the tracks as the house rotates. Reduced-tail-swing and zero-tail-swing machines minimize it for tight work areas.
Competent person
An individual capable of identifying existing and predictable hazards and authorized to take prompt corrective action, such as stopping work or ordering a trench evacuated.
Slope stake
A stake set beyond the edge of construction that marks where the designed cut or fill slope intersects the original ground surface at the catch point.
Hydraulic injection injury
A pinhole leak of pressurized hydraulic oil can pierce the skin and cause severe injury or amputation, so leaks are checked with cardboard, never a bare hand.