Reading the load chart for the boom length and radius you planned on paper rather than the radius the boom and load actually reach on the day, so capacity is selected from a shorter radius than the one being operated.
Candidates memorize a few chart values from practice questions and treat radius as a fixed design input. In the field, radius changes with boom angle, swing, boom deflection under load, and outrigger float position, so the chart value that matched the plan no longer matches the lift.
What to do instead
Before every lift, verify the actual operating radius at the boom tip with the load attached and the boom at working angle, and recheck it after the load comes off the ground and after any swing. Build the habit of selecting capacity from the measured radius plus a margin, and treat any radius change as a new lift requiring a fresh chart check.
Using the main boom capacity column when the lift requires a jib, boom extension, or stowed attachment, or using the 'over the rear' or 'over the side' values interchangeably without confirming which quadrant the chart line applies to.
Load charts are dense and candidates skim to the number that matches boom length and radius, ignoring headers for boom configuration, counterweight state, outrigger spread, and swing quadrant. Exam items deliberately place plausible values in the wrong column.
What to do instead
Read the chart from the top down every time: confirm crane model, counterweight configuration, outrigger or track configuration, boom or jib configuration, quadrant, and then the radius row. Practice by covering the numbers and stating each header aloud before selecting a value.
Treating the load weight as the weight of the payload only, without adding rigging, slings, shackles, spreader beams, and the hook block, and without accounting for the portion of a lifted component's weight that is carried when the lift is not vertical.
Candidates compute gross load from the object's marked weight and stop. They forget that the crane feels total suspended load, and that non-vertical sling legs and off-center pick points redistribute weight so one line or one crane carries more than a simple share.
What to do instead
Compute gross load as payload plus all rigging plus hook block, then apply a sling tension factor for leg angle and a load-share check for multi-point or multi-crane picks. Write the gross load on the lift plan and compare it to chart capacity at the measured radius before rigging is finalized.
Setting up with outriggers or tracks on unverified ground, or with floats partly extended or pads bridging a void, and then proceeding because the crane 'looks level'.
Candidates focus on the crane and the load and treat the ground as a given. They lack a routine for checking soil bearing, buried utilities, vaults, and previous excavation, and they do not connect outrigger load concentration to ground failure.
What to do instead
Use a setup routine: locate underground hazards through the utility locate and site drawings, assess soil and slope, use properly sized pads or mats that fully support each float, extend outriggers fully per the manufacturer, and confirm level with the crane's level indicator in both axes. If bearing capacity is unknown, get it evaluated before setup.
Rigging with sling legs at a wide horizontal angle and assuming each leg carries an equal share, or picking a sling by eye without checking the tag and the vertical load per leg.
Candidates know the sling angle increases tension but cannot convert that into a number under exam pressure, and they forget that an off-center center of gravity makes leg loads unequal regardless of sling geometry.
What to do instead
Calculate tension as load divided by the number of legs divided by the sine or cosine of the angle from horizontal, then compare to the sling's rated capacity in that configuration. For off-center loads, determine the center of gravity and treat the pick as unequal leg loading, or add a spreader or adjust pick points.
Accepting a hand signal from anyone on the site, or continuing a lift when signals become ambiguous, and failing to establish a single designated signal person with a known communication method before the lift starts.
Candidates treat signaling as a formality and assume the rigger will 'just wave them in'. On exam items about multiple signalers, obstructed views, or radio failure, they default to continuing the lift rather than stopping.
What to do instead
Before lifting, confirm one designated signal person, agree on hand signals or radio channel, and confirm the operator stops on any signal to stop from anyone. If the signal person is out of view or communication is lost, stop and hold until contact is reestablished. Know the standard hand signals cold, including stop, emergency stop, hoist, lower, and swing.
Skipping or shortening the pre-shift inspection, particularly wire rope, hook latch, limit switches, and outrigger components, and then operating a crane with a defect that should have removed it from service.
Candidates memorize inspection as a concept but not the specific rejection criteria, so they cannot tell a normal wear pattern from a removal-from-service condition. Time pressure on site reinforces the shortcut.
What to do instead
Learn the concrete removal criteria: broken wire counts in a lay, rope diameter reduction, kinks, bird-caging, and heat damage; hook throat opening and twist limits; latch function; and the function test of limit switches and anti-two-block devices. Perform the inspection in a fixed sequence and document it, and know that a failed critical item means the crane is out of service.
Planning the lift around capacity alone and ignoring the load chart's structural versus stability limits, the area of operation diagram, and proximity hazards such as power lines, excavations, and other crews.
Candidates chase the capacity number and stop there. They do not distinguish boom strength limits from tipping limits, do not check the working area against the manufacturer's diagram, and do not plan for encroachment on power line clearances.
What to do instead
For each lift, state whether the governing limit is structural or stability, confirm the swing path and load path stay inside the permitted area, and mark power line clearances and exclusion zones on the lift plan. Use a spotter or dedicated lookout where clearance is close, and treat any unplanned encroachment as a stop-work condition.
Handling a near-capacity or two-crane lift with the same informal approach as a routine pick, without a written lift plan, without verifying the crane's configuration matches the plan, and without a dry run of the load path.
Candidates underestimate when a lift becomes critical. They do not know the triggers that make a lift critical, and they assume that because a chart value exists, the lift is straightforward.
What to do instead
Know the triggers for a critical lift, including lifts near chart capacity, multiple cranes, personnel, hazardous loads, and lifts over occupied areas or sensitive facilities. For those, require a written and reviewed plan, verified configuration, calculated rigging, a defined load path with tag lines, and a dry run before the load leaves the ground.
Shutting down by parking the boom wherever it was, leaving the load or rigging suspended, or leaving the crane unattended with controls accessible and the boom elevated.
Candidates treat shutdown as an afterthought and do not know the manufacturer's parking requirements or the site rules for leaving a crane. They also underestimate wind and overnight weather effects on an elevated boom.
What to do instead
Follow a shutdown sequence: land the load and remove rigging, lower and stow the boom per the manufacturer, set brakes and locks, retract or secure outriggers as required, place controls in neutral with the lock engaged, remove the key, and secure the machine against wind and unauthorized access. Record the condition at handover.