NCCER Plumbing study materials
NCCER Plumbing study resources

NCCER Plumbing cheat sheet

NCCER Plumbing · Keep the key ideas within reach.

Quick reference

Plumbing - Journey-Level Craft Knowledge and Skills

  • Minimum slope for horizontal drainage pipe: 1/4 in. per foot for pipe 2-1/2 in. and smaller (about 2% grade); 1/8 in. per foot is allowed for 3 in. and larger pipe only where the developed length permits adequate velocity under the governing code.

  • Drainage fixture unit (dfu) values are assigned by fixture type and code table; a water closet is commonly 3 dfu (public) or 4 dfu, a lavatory 1 dfu, a floor drain 2 dfu. Convert total dfu to pipe size using the code's building drain and branch tables.

  • Water supply sizing uses fixture units and the Hunter curves or code tables: total supply fixture units → demand in gpm → pipe size based on allowable velocity (typically about 8 fps in supply mains) and pressure loss.

  • Developed length of pipe equals the measured length plus allowances for fittings: a 90° elbow is commonly counted as an equivalent length of 2-1/2 to 3 ft for small pipe, a 45° elbow about 1-1/2 ft, and a tee about 5 ft (code tables govern).

  • Vent sizing rule: a vent must be at least 1-1/4 in. (commonly 1-1/2 in. for a water closet), and the vent must not be smaller than one-half the drain it serves in many code tables. Each fixture trap requires a vent unless it is a listed combination waste-and-vent or an approved wet vent.

  • Trap seal depth is 2 to 4 in.; a trap must be installed level, with a cleanout, and the fixture arm (trap arm) length from trap weir to vent is limited by pipe size (e.g., 1-1/2 in. trap arm ≈ 3-1/2 ft, 2 in. ≈ 5 ft).

  • Water heater safety: T&P relief valve discharge must terminate within 6 in. of the floor (or outside), never be capped or reduced, and the T&P valve is set to the tank rating (commonly 150 psi / 210°F). A thermal expansion tank is required on closed systems.

  • Pressure test requirements: DWV systems are typically tested with a 10 ft head of water (or 10 psi air where allowed) for at least 15 minutes without drop; water supply systems are tested at working pressure plus 50 psi (or code-specified) for at least 1 hour.

  • Backflow protection: an air gap is the highest-level protection; atmospheric vacuum breakers (AVB) cannot be under continuous pressure; reduced-pressure principle assemblies (RPZ) and double-check valves are used for cross-connection control per degree of hazard.

Quick reference

Plumbing - Journey-Level Craft Knowledge and Skills

  • Copper tube sizing: Type K (thickest, green), Type L (blue), Type M (red, thinnest). Type L is common for plumbing; Type M is limited to above-ground, non-embedded use. Nominal size is not actual OD: 1/2 in. nominal copper has 5/8 in. OD.

  • Rough-in dimensions: a water closet rough-in is typically 12 in. from the finished wall to the drain center (10 in. and 14 in. also exist); a lavatory drain center is usually 17–18 in. above the floor; a shower valve is commonly 42 in. above the floor.

  • Soldering: use lead-free solder (95/5 or 50/50 only for non-potable where allowed), flux the tube and fitting, heat the fitting (not the solder), and draw solder into the joint; lead-free solder melts at about 420–460°F.

  • Press-fit and push-fit fittings require a square, burr-free cut, full insertion depth marked on the tube, and a deburring tool; press tools must be calibrated and the fitting not reused after pressing.

  • PVC solvent welding: cut square, chamfer, clean with primer, apply cement to both surfaces, assemble with a quarter-turn, and hold for 15–30 seconds; cure time depends on pipe size and temperature (e.g., 1-1/2 in. at 60–100°F ≈ 15 minutes before pressure testing).

  • Cast iron no-hub couplings: torque the clamps to the manufacturer's spec (commonly 60 in.-lb) with a calibrated torque wrench; the coupling sleeve must be centered on the joint.

  • Water pipe support spacing: copper horizontal 1/2–3/4 in. ≈ 6 ft, 1 in. ≈ 8 ft; PVC horizontal ≈ 4 ft for 1 in. and smaller; vertical support at each floor.

  • Fixture installation: set the water closet on a new wax ring (or waxless seal) with the closet flange flush with or slightly above the finished floor; secure the closet bolts and shim the base without cracking the china.

  • Gas piping: black iron pipe is joined with approved pipe dope or tape; a drip leg (sediment trap) is installed at the appliance, and the gas line is tested at 1-1/2 times working pressure (commonly 10 psi for 1/2 psi systems) for at least 30 minutes.

Quick reference

Plumbing - Journey-Level Craft Knowledge and Skills

  • Safety: OSHA requires fall protection at 6 ft (general industry) or 10 ft (construction); a trench 5 ft or deeper requires a protective system (sloping, shoring, or shielding) unless in stable rock.

  • Confined space: a space with limited entry/exit, not designed for occupancy, and with a hazardous atmosphere requires a permit and atmospheric testing (O2 19.5–23.5%, LEL < 10%, H2S < 10 ppm) before entry.

  • Electrical safety: lockout/tagout (LOTO) must be applied before servicing equipment; use GFCI protection on temporary power; maintain 10 ft clearance from overhead power lines for equipment.

  • PPE: safety glasses with side shields, hearing protection above 85 dBA, gloves, and steel-toe boots; a respirator requires fit testing and medical clearance.

  • Hazard communication: SDS (Safety Data Sheet) must be available for every chemical; GHS pictograms identify hazards; store solvents away from open flame and in approved containers.

  • Lifting: keep the load close, bend at the knees, and use two-person lifts for loads over about 50 lb; use mechanical aids for pipe and water heaters.

  • Fire safety: a fire watch is required when hot work (soldering, brazing, cutting) is performed; keep a fire extinguisher rated for the hazard (ABC for general, BC for flammable liquids) and clear combustibles within 35 ft.

  • Excavation: spoil piles and equipment must be kept at least 2 ft from the trench edge; ladders in trenches must extend 3 ft above the top and be spaced within 25 ft of travel.

Quick reference

Plumbing - Journey-Level Craft Knowledge and Skills

  • Reading plans: plumbing drawings use a plan view, riser diagram, and isometric; the riser diagram shows pipe sizes, slopes, and vent connections, while the plan shows fixture locations and pipe routing.

  • Scale: a 1/4 in. = 1 ft scale means 1/4 in. on the drawing equals 12 in. actual; use an architect's scale, not an engineer's scale, for building plans.

  • Symbols: a circle with a cross is a floor drain; a square with a diagonal is a cleanout; a triangle is a vent through roof; dashed lines indicate concealed pipe; a solid line is exposed pipe.

  • Specifications: Division 22 (Plumbing) of MasterFormat covers plumbing; Division 21 is fire suppression; Division 23 is HVAC. The specs govern materials, testing, and submittals, and take precedence over drawings when they conflict (per general conditions).

  • Takeoff: count fixtures by type, measure pipe runs by scale, add fittings by counting from the isometric, and apply waste factors (commonly 5–10% for pipe, 2–5% for fittings).

  • Elevations: floor drains are set 1/4 in. below the finished floor; a water heater is set on a stand or in a pan with a drain; a hose bibb is commonly 18 in. above grade.

  • Change orders: a change in the work must be documented in writing and priced before work proceeds; RFIs (requests for information) clarify drawings before installation.

  • Code hierarchy: the adopted plumbing code (e.g., IPC or UPC), local amendments, and the manufacturer's installation instructions all apply; the most restrictive requirement governs.

Quick reference

Plumbing - Journey-Level Craft Knowledge and Skills

  • Troubleshooting a clogged drain: start at the fixture, use a hand auger or closet auger for a water closet, a drum auger for branch lines, and a power auger or jetter for mains; confirm the blockage location by testing fixtures upstream and downstream.

  • A gurgling fixture or slow drain across multiple fixtures suggests a blocked vent or a partially blocked main; a sewer smell indoors suggests a dry trap, a broken vent, or a failed wax ring.

  • Water hammer is caused by sudden valve closure; fix with air chambers, water hammer arrestors, or by replacing worn valves and securing loose pipe.

  • No hot water: check the power/gas supply, the thermocouple or igniter, the dip tube, and the lower heating element; a leaking T&P valve may indicate excessive pressure or a failed expansion tank.

  • Leak diagnosis: a water meter that moves with all fixtures off indicates a supply leak; a dye test in the tank identifies a leaking flapper; a smoke or peppermint test locates a broken vent or sewer line.

  • Pressure problems: low pressure at one fixture suggests a clogged aerator or cartridge; low pressure throughout suggests a failed pressure-reducing valve, a partially closed valve, or a supply line restriction.

  • Pump and ejector: a sewage ejector basin must be vented and the pump controlled by a float; a simplex system must have an alarm; check the check valve and the float before replacing the pump.

  • Testing and inspection: after repair, pressure-test the affected section, verify slope with a level, and confirm the trap seal; document the repair and any code-required inspection.

Quick reference

Plumbing - Journey-Level Craft Knowledge and Skills

  • Water heater sizing: the first-hour rating (FHR) must meet peak demand; a storage tank's FHR depends on tank volume, recovery rate, and input BTU. A rule of thumb is 1 gallon per fixture for storage, but the code's sizing tables govern.

  • Gas water heater venting: a natural-draft water heater requires a vent connector with a minimum rise of 1/4 in. per foot and a draft hood; a Category III/IV appliance requires a listed vent and condensate management.

  • Tankless water heaters require a minimum flow rate to fire (commonly 0.5–0.75 gpm) and a gas supply sized for the full input; the vent must be listed for the appliance category.

  • Recirculation: a hot water return line or a dedicated recirculation pump reduces wait time; a thermostatic valve controls the return temperature; an on-demand system uses a push button or motion sensor.

  • Expansion tanks: a closed system requires a thermal expansion tank sized to the system volume and temperature rise; the tank precharge is set to the system's static pressure.

  • Water treatment: a water softener uses ion exchange resin and a brine tank; backwash and regeneration cycles are set by hardness and demand; a sediment filter is rated in microns.

  • Solar and heat pump water heaters: a heat pump water heater needs about 1,000 cubic feet of air space or ducted air; a solar system needs a backup element and a freeze-protection strategy.

  • Legionella control: store hot water at 140°F or higher and use a mixing valve to deliver 120°F or less at the fixture; flush unused fixtures and dead legs.

Quick reference

Plumbing - Journey-Level Craft Knowledge and Skills

  • Pipe sizing for gas: use the longest length method from the code's gas pipe tables; the longest run from the meter to the farthest appliance determines the size for the total load, and each branch is sized for its own load and length.

  • Gas appliance load: a typical residential gas water heater is 40,000 BTU/hr, a furnace 80,000–100,000 BTU/hr, and a range 40,000–65,000 BTU/hr; add loads to size the meter and main.

  • Gas leak testing: a new system is tested at 1-1/2 times the working pressure (commonly 10 psi for a 1/2 psi system) for at least 30 minutes with a gauge; soap bubbles or an electronic detector locate leaks.

  • Combustion air: a confined space requires two permanent openings (one high, one low) sized per the code's free area (commonly 1 sq in. per 1,000 BTU/hr for a direct-connect opening, and 1 sq in. per 2,000 BTU/hr for a vertical duct).

  • Venting: a natural-draft appliance requires a vent with a draft hood and a minimum height above the roof (commonly 2 ft above the roof within 10 ft of a wall or ridge); a chimney must be lined and sized for the appliance.

  • Backdrafting: test for spillage at the draft hood with a mirror or smoke; a blocked flue, tight house, or undersized vent can cause backdrafting, which is a carbon monoxide hazard.

  • Gas piping materials: black steel pipe for above-ground, coated or wrapped pipe for underground, and listed CSST with bonding; a shutoff valve is required at each appliance.

  • Carbon monoxide: install CO alarms outside sleeping areas and on each level; a CO level of 9 ppm (8-hour) or 35 ppm (1-hour) is the EPA indoor air limit.

Quick reference

Plumbing - Journey-Level Craft Knowledge and Skills

  • Fixture unit conversion: 1 water closet = 3 dfu (public) or 4 dfu (private), 1 lavatory = 1 dfu, 1 bathtub/shower = 2 dfu, 1 kitchen sink = 2 dfu, 1 floor drain = 2 dfu; total dfu from the code table gives the drain size.

  • Water supply fixture units (wsfu) differ from dfu: a water closet is 2.5 wsfu (flush tank) or 10 wsfu (flushometer), a lavatory 1 wsfu, a bathtub 4 wsfu, a shower 2 wsfu.

  • Building drain sizing: a 3 in. building drain handles about 20–35 dfu depending on slope; a 4 in. drain handles about 160 dfu at 1/4 in./ft; always use the code table, not memory.

  • Fixture spacing: a water closet must have at least 15 in. from its center to a side wall and 30 in. of clear space in front; a lavatory needs 4 in. from its center to a side wall.

  • Accessibility (ADA): a water closet centerline is 16–18 in. from the side wall, the seat height is 17–19 in., and a lavatory must have a knee clearance of 27 in. high and 8 in. deep.

  • Grease interceptor sizing: use the code formula (commonly 1 cubic foot per fixture or the formula based on fixture capacity and flow rate); a grease interceptor must be accessible for cleaning.

  • Storm drainage: roof drains are sized by the roof area and the local rainfall rate (inches per hour); a 4 in. leader handles about 1,700 sq ft at 1 in./hr, but the code table governs.

  • Water pressure: a pressure-reducing valve is required when the supply exceeds 80 psi; the typical delivered pressure is 45–60 psi; a pressure gauge is used to verify.

Quick reference

Plumbing - Journey-Level Craft Knowledge and Skills

  • Soldering vs. brazing: soldering is below 840°F and uses lead-free solder for potable water; brazing is above 840°F and uses a filler such as Sil-Fos for high-temperature or medical gas work.

  • PEX: use a manifold or crimp/expansion system per the manufacturer; PEX must be protected from UV, supported every 32 in. horizontally, and not installed within 12 in. of a heat source.

  • Pipe cutting: a tubing cutter produces a square cut with a burr that must be reamed; a hacksaw cut must be squared and deburred; a plastic pipe cutter is used for PVC and CPVC.

  • Threading: use a die head sized to the pipe, oil the die, and cut threads to the proper length (about 3/4 in. for 1/2–3/4 in. pipe); a thread gauge verifies the thread.

  • Flaring: a flaring tool produces a 45° flare for flare fittings; the flare must be centered and not cracked; flare fittings are used for gas and refrigeration.

  • Joining plastic: CPVC requires a different cement than PVC; use the correct primer and cement for the material and pipe size, and allow the proper cure time before pressure testing.

  • Hangers and supports: use clevis hangers for horizontal pipe, riser clamps for vertical pipe, and insulators between dissimilar metals to prevent galvanic corrosion.

  • Insulation: pipe insulation is rated by R-value; a vapor retarder must face the warm side; a pipe in a freeze-prone area needs heat tape and insulation.

Quick reference

Plumbing - Journey-Level Craft Knowledge and Skills

  • Project documents: a submittal is a product data sheet or shop drawing submitted for approval before installation; a shop drawing is a detailed fabrication/installation drawing prepared by the contractor.

  • Scheduling: a critical path method (CPM) schedule identifies the longest sequence of dependent tasks; a delay on the critical path delays the project.

  • Estimating: labor hours are estimated using a productivity rate (e.g., hours per fixture or per foot of pipe); material costs include waste, freight, and sales tax.

  • Quality control: a punch list is a list of incomplete or defective work identified at substantial completion; the contractor must correct items before final payment.

  • Coordination: use a clash detection review (BIM) to resolve conflicts between plumbing, HVAC, and electrical before rough-in; an RFI documents a conflict and requests clarification.

  • Safety program: a written hazard communication program, a competent person for excavations, and a site-specific safety plan are required on commercial projects.

  • Codes and permits: a permit is required before work begins; the inspector performs rough-in and final inspections; work must comply with the adopted code and approved plans.

  • Warranty and closeout: provide operation and maintenance manuals, as-built drawings, and training to the owner; the warranty period is defined by the contract.

Quick reference

Plumbing - Journey-Level Craft Knowledge and Skills

  • Water heater installation: a water heater must be installed in a pan with a drain when leakage could cause damage, and it must be secured (strapped) in seismic zones; the T&P valve must be piped to a safe discharge.

  • Fixture carriers: a water closet carrier supports the fixture and connects to the drain; the carrier must be anchored to the structure and set at the correct rough-in height.

  • Floor drains: a floor drain requires a trap primer when the trap may evaporate; the drain body is set in the concrete with the clamping collar and membrane.

  • Shower pans: a shower pan requires a preslope (1/4 in. per foot) under the waterproof membrane, a clamping drain, and a weep hole path; the finished tile slope is also 1/4 in. per foot.

  • Water closet installation: the closet flange must be anchored to the floor and flush with the finished floor; the wax ring seals the outlet; the tank is bolted to the bowl with a gasket.

  • Faucet installation: use new supply lines and a new drain assembly; apply plumber's putty or silicone to the drain flange; check for leaks at the supply connections and the drain.

  • Dishwasher and ice maker: a dishwasher requires a high-loop or air gap for backflow protection; an ice maker requires a shutoff valve and a water hammer arrestor.

  • Sump pumps: the pump must discharge to a legal point (not to the sanitary sewer unless allowed), and the check valve prevents backflow; the pit must be covered.

Quick reference

Plumbing - Journey-Level Craft Knowledge and Skills

  • Water supply demand: peak demand is calculated from fixture units using the code's demand tables; the meter and service line are sized for the total demand plus the fire sprinkler demand where applicable.

  • Pressure loss: friction loss in pipe is calculated with the Hazen-Williams formula; loss increases with flow and decreases with pipe diameter; fittings add equivalent length.

  • Pump sizing: a booster pump is sized for the required flow (gpm) and head (ft); the pump curve shows flow vs. head, and the operating point is where the system curve crosses the pump curve.

  • Backflow prevention: an RPZ assembly is tested annually and must be installed above grade with a drain; an air gap is the only protection that does not require testing.

  • Water softener sizing: size by grains of hardness per gallon × daily gallons = grains per day; the resin capacity and regeneration frequency determine the salt dose.

  • Filtration: a carbon filter removes chlorine and taste/odor; a sediment filter removes particulates; a reverse osmosis unit removes dissolved solids and requires a drain connection.

  • Hot water recirculation: a dedicated return line with a pump and a check valve keeps hot water at the fixture; a timer or aquastat controls the pump.

  • Cross-connection survey: identify all connections between potable and non-potable systems, including hose bibbs, boilers, irrigation, and chemical feed systems, and protect each with the appropriate device.

Quick reference

Plumbing - Journey-Level Craft Knowledge and Skills

  • Vent types: a continuous vent is a vertical vent from a fixture drain; a revent connects two vents; a wet vent carries waste and serves as a vent for another fixture; a stack vent extends the soil stack through the roof.

  • Vent terminal: a vent must extend at least 6 in. above the roof (or 12 in. where snow accumulates) and at least 3 ft from a window or air intake; a vent must be at least 10 ft from a chimney.

  • Trap arm: the distance from the trap weir to the vent is limited by pipe size (1-1/4 in. ≈ 2-1/2 ft, 1-1/2 in. ≈ 3-1/2 ft, 2 in. ≈ 5 ft, 3 in. ≈ 6 ft, 4 in. ≈ 10 ft).

  • Sizing vents: a vent must be at least 1-1/4 in. and not less than one-half the drain size; a vent stack serving a building drain is sized by the total dfu.

  • Air admittance valves (AAV): an AAV is a one-way valve that admits air but does not allow sewer gas to escape; it must be installed in an accessible location and is limited to a single fixture or a small group.

  • Wet venting: a wet vent must be at least 2 in. and may serve only a water closet and one other fixture (per many codes); a wet vent cannot be a toilet drain for another toilet.

  • Vent slope: a horizontal vent must slope back to the drain at 1/4 in. per foot so condensate drains; a vent must not have a sag or trap.

  • Common vent: a common vent connects two fixture drains to a single vent; the vent must be sized for the combined load and the fixtures must be on the same floor.

Quick reference

Plumbing - Journey-Level Craft Knowledge and Skills

  • Water quality: hardness is measured in grains per gallon (gpg); 0–3 gpg is soft, 3–7 is moderate, 7–10 is hard, and above 10 is very hard.

  • pH: a pH below 7 is acidic and can corrode copper pipe; a pH above 8.5 can cause scale; a neutralizing filter raises pH with calcite or magnesium oxide.

  • Iron and manganese: iron above 0.3 ppm causes staining; a greensand or oxidizing filter removes iron; manganese above 0.05 ppm causes black staining.

  • Chlorine: a carbon filter or an activated carbon block removes chlorine; a UV light is used to disinfect water but requires clear water (low turbidity) to work.

  • Backflow prevention: an air gap is the highest protection; an RPZ is used for high hazard; a double check is used for low hazard; a pressure vacuum breaker protects against backsiphonage only.

  • Water testing: test for bacteria (total coliform), nitrates, lead, and hardness; a private well should be tested annually for bacteria and nitrates.

  • Cross-connection control: a hose bibb requires a vacuum breaker; a boiler fill line requires a backflow preventer; an irrigation system requires an RPZ or a pressure vacuum breaker.

  • Water treatment maintenance: replace filter cartridges per the manufacturer, recharge the softener with salt, and test the treated water after service.

Quick reference

Plumbing - Journey-Level Craft Knowledge and Skills

  • Pipe expansion: PEX and CPVC expand with temperature; install expansion loops or offsets, and do not trap the pipe in a tight hole; the expansion rate for PEX is about 1 in. per 100 ft per 10°F.

  • Freeze protection: a pipe in an unheated space needs insulation and heat tape; a freeze-proof hydrant drains back after each use; a hose bibb should be shut off and drained in winter.

  • Water hammer: install an arrestor near the valve or appliance; size the arrestor to the system volume; secure loose pipe with hangers.

  • Noise: a noisy pipe can be caused by high velocity (above 8 fps), a loose washer, or a worn valve; a pressure-reducing valve reduces noise from high pressure.

  • Corrosion: dissimilar metals require a dielectric union; copper and steel must be separated; a stray current can cause electrolytic corrosion.

  • Thermal expansion: a closed system with a backflow preventer requires an expansion tank; the tank precharge is set to the static pressure.

  • Pipe support: support horizontal pipe at the code's spacing; support vertical pipe at each floor; allow for expansion at the hangers with a roller or a slide.

  • Testing: after installation, flush the system, test for leaks, and verify the pressure and temperature at the fixtures; document the test results.