NCCER Plumbing study materials
NCCER Plumbing study resources

NCCER Plumbing study plan

NCCER Plumbing · Give each week a clear focus.

8 weeks · About 7 hours per week

Week 1

Plumbing (journey-level craft knowledge and skills)

  • Map the Plumbing domain into its working sub-areas (pipe materials and joining, drainage and venting, water supply, fixtures, code and safety) and rate your current confidence in each on a 1-5 scale

  • Define every plumbing term you cannot yet explain aloud, building a personal glossary of at least 40 terms

  • Sketch from memory the path of water from the service line through the meter, distribution, fixture, drain, trap, and vent to the sewer, and label each component

  • Identify the code edition and local amendments that govern plumbing work in your jurisdiction and note where to look up a fixture-unit value

Your checkpoint

A one-page domain map with confidence ratings and a 40-term glossary

Week 2

Plumbing (journey-level craft knowledge and skills)

  • Compare the common pipe materials (copper, PEX, CPVC, PVC, cast iron, galvanized steel) by pressure rating, temperature limit, approved use, and joining method

  • Describe the correct procedure for soldering copper, solvent-welding plastic, and making a mechanical or push-fit connection, including preparation and cure times

  • Explain how to size a water supply branch using fixture units and developed length, working two examples by hand

  • List the safety controls for cutting, soldering, and working in a trench or confined space

Your checkpoint

A material-and-joining comparison table plus two worked supply-sizing calculations

Week 3

Plumbing (journey-level craft knowledge and skills)

  • Explain the purpose of the trap, the vent, and the trap arm, and state the rules that keep a trap seal intact

  • Calculate drain and vent sizes from fixture units for a small bathroom group and a kitchen group

  • Describe the difference between a wet vent, a common vent, and a circuit vent and when each is permitted

  • Identify the slope requirements for horizontal drainage pipe by diameter and explain why slope matters

Your checkpoint

A hand-drawn DWV isometric for a bathroom group with pipe sizes and slopes annotated

Week 4

Plumbing (journey-level craft knowledge and skills)

  • Walk through the installation sequence for a water heater, including relief valve, expansion control, venting, and seismic or support requirements

  • Explain backflow prevention devices and where each is required

  • Describe the steps to install and test a fixture set (water closet, lavatory, and kitchen sink) including supply stops and trap assembly

  • Diagnose three common fixture faults (running toilet, slow drain, low hot-water pressure) and state the likely cause and repair

Your checkpoint

A written troubleshooting sheet covering five fixture faults with cause and repair steps

Week 5

Plumbing (journey-level craft knowledge and skills)

  • Explain hydrostatic and air testing of DWV systems and the pressures and durations typically used

  • Describe the process for rough-in inspection and what an inspector checks at each stage

  • List the steps to isolate, drain, and repair a leaking section of supply or drain line without contaminating the system

  • Identify the roles and responsibilities on a plumbing crew, from apprentice to journeyman to master, and how work is coordinated with other trades

Your checkpoint

A rough-in inspection checklist you could use on a real job

Week 6

Plumbing (journey-level craft knowledge and skills)

  • Work through a full residential rough-in plan: count fixture units, size the main, branch, and vent, and lay out the piping

  • Estimate material quantities for that plan and produce a takeoff with a cost total

  • Explain the requirements for indirect waste, grease interception, and special wastes in commercial kitchens

  • Describe the design and installation considerations for a sump pump, sewage ejector, and storm drainage

Your checkpoint

A complete rough-in plan package with sizing calculations and a material takeoff

Week 7

Plumbing (journey-level craft knowledge and skills)

  • Review the code sections you flagged in week 1 and answer 100 practice questions under timed conditions

  • Re-teach the three sub-areas where your week 1 confidence ratings were lowest, writing a short explanation of each from memory

  • Practice reading a plumbing drawing and identifying pipe sizes, fixture locations, and riser details

  • Explain the requirements for potable water protection, cross-connection control, and disinfection after repair

Your checkpoint

A timed 100-question practice set with a scored review of every miss

Week 8

Plumbing (journey-level craft knowledge and skills)

  • Take two full-length timed practice exams and record your score by sub-area

  • Re-study only the sub-areas scoring below 75 percent and re-test those areas

  • Recite the key code values (fixture units, slopes, trap arm distances, vent distances) from memory without notes

  • Build a one-page pre-exam reference sheet of the facts you most often forget

Your checkpoint

Two scored practice exams with a written remediation log and a final one-page reference sheet

Milestones

Week 2: Can name the approved joining method for each common pipe material and complete a supply-sizing calculation unaided

Week 4: Can draw a correct DWV isometric with sizes and slopes and explain how a trap seal is protected

Week 6: Can produce a full residential rough-in plan with sizing and a material takeoff

Week 8: Scoring at or above 75 percent on full-length timed practice exams across all sub-areas