NCIDQ study materials
NCIDQ study resources

NCIDQ flashcards

NCIDQ · Build recall with a focused review session.

32 cards. Read the term and the definition here. The deck at the top of this page is optional.

Reflected ceiling plan
A drawing showing the ceiling as viewed from above and projected down, so it mirrors the floor plan and aligns grid lines, columns, and partitions with the plan below.
Scale ratio equivalents
Common drawing scales expressed as ratios: 1/8 inch equals 1 foot is 1:96; 1/4 inch equals 1 foot is 1:48; 1/2 inch equals 1 foot is 1:24.
Line weight hierarchy
Heaviest lines mark elements cut by the section plane and solid poché; medium lines show surfaces beyond the cut; the lightest lines carry dimensions, notes, and reference grids.
Room finish schedule
A table listing each room against its floor, base, wall, and ceiling finish codes, keyed to a legend that specifies products, colors, and installation standards.
Revision cloud and delta
A scalloped cloud surrounds changed drawing content, and the adjacent numbered triangle refers to a revision block entry giving the date, description, and authorizing document.
MasterFormat Division 09
The MasterFormat division covering finishes, including gypsum board, tiling, acoustical ceilings, flooring, wall coverings, and paints and coatings.
Three-part specification section
Standard format in which Part 1 General covers references, submittals, and quality assurance; Part 2 Products covers materials and components; Part 3 Execution covers installation and field quality control.
Type X gypsum board
A gypsum panel with a specially formulated core that improves fire resistance, usually 5/8 inch thick and used in rated wall and ceiling assemblies tested to ASTM E119.
Performance specification
A specification stating the required end result, such as a fire rating or acoustic rating, while leaving selection of materials and installation methods to the contractor.
ASTM F2170 moisture test
An in-situ relative humidity probe test measuring moisture deep within a concrete slab before moisture-sensitive flooring or coatings are installed, compared against the manufacturer's limit.
Sound transmission class
An ASTM E90 single-number rating of how well a partition blocks airborne sound; higher values mean greater privacy, and STC 50 is generally good for offices.
ASHRAE 62.1
The standard establishing minimum ventilation rates and indoor air quality procedures for commercial buildings, expressed as cubic feet per minute per person plus per square foot by occupancy.
Lighting power density
Installed lighting power per unit of floor area in watts per square foot, capped by space type under ASHRAE 90.1 and the IECC, calculated separately for interior and exterior.
Noise criteria rating
A single-number rating of background noise from mechanical systems; roughly NC 25 to 30 suits private offices and conference rooms, while NC 35 to 40 suits open offices.
Drainage pipe slope
Horizontal drainage piping 2-1/2 inches and smaller slopes at 1/4 inch per foot, while piping 3 inches and larger may slope at 1/8 inch per foot.
Volatile organic compound limits
Low-emitting material criteria such as CDPH Standard Method Section 01350, GREENGUARD, or Green Seal cap emissions from adhesives, sealants, paints, and flooring.
Business occupant load factor
Group B business occupancy uses 100 gross square feet per occupant; occupant load equals the floor area divided by that factor, rounded up to the next whole person.
Common path of egress
The distance an occupant must travel before two independent egress routes exist; the code limits it to 75 feet, or 100 feet in sprinklered Group B occupancies.
Ramp slope and landings
Accessible ramps slope no steeper than 1:12, rise no more than 30 inches between landings, and provide 60-inch-long landings at the top, bottom, and turns.
Accessible reach range
Unobstructed high forward reach is 48 inches and low reach 15 inches above the floor; side reach over an obstruction up to 34 inches deep uses the same range.
Dead-end corridor limit
The code limits dead-end corridors to 20 feet, increased to 50 feet in sprinklered Group B occupancies where the code permits the longer dimension.
Two means of egress
At least two separate exits are required when the occupant load reaches 50 or more, and in other cases where common path or travel distance limits are exceeded.
Net to gross ratio
Net assignable area divided by gross building area; office planning commonly targets 75 to 85 percent efficiency, with the remainder going to circulation, cores, and mechanical space.
Adjacency matrix
A grid scoring the required proximity or separation between every pair of program spaces, used to generate bubble diagrams and block plans.
Post-occupancy evaluation
A structured assessment after move-in using surveys, observation, and measurement to determine whether the design met user and program needs.
BOMA rentable area
The BOMA measurement standard distinguishing rentable from usable area and applying a load factor that spreads shared spaces such as corridors and lobbies among tenants.
Schematic design phase
The early design phase establishing concept, program fit, and order-of-magnitude cost, typically representing a modest share of the architect's basic service effort.
AIA A201 general conditions
The standard document defining the rights, responsibilities, and procedures of owner, contractor, and architect, incorporated by reference into the construction contract.
AIA G702 payment application
The contractor's application and certificate for payment that the architect certifies, accompanied by G703 continuing the schedule of values and percent complete by line item.
Substantial completion
The stage when the work is sufficiently complete for the owner's intended use, starting warranties, permitting retainage reduction, and generating the punch list.
Architect's standard of care
The skill and diligence ordinarily exercised by design professionals performing similar services under similar conditions; it is a negligence standard, not a warranty of perfection.
Architect's Supplemental Instructions
A written clarification or minor change issued by the architect that does not alter contract sum or contract time; larger changes require a change order.