NCIDQ key terms
NCIDQ · Get comfortable with the vocabulary.
- Programming
- Related: Adjacency matrix, Bubble diagram
The pre-design phase in which the designer gathers and analyzes client goals, user needs, code limits, and budget to produce written and graphic requirements that guide the design.
- Bubble diagram
- Related: Adjacency matrix, Programming
A simple schematic drawing showing each space as a labeled circle, with lines or arrows indicating required adjacencies and circulation, used to test planning options early in design.
- Adjacency matrix
- Related: Bubble diagram, Programming
A grid that lists spaces on both axes and rates how closely each pair should be related, turning the client's functional requirements into a checkable planning diagram.
- Net floor area
- Related: Occupant load, Gross floor area
Floor area within a room or space measured to the inside faces of enclosing walls, excluding columns, shafts, and other obstructions; used for occupancy calculations and furniture planning.
- Gross floor area
- Related: Net floor area, Occupancy classification
Total floor area of a building measured to the outside faces of exterior walls, including corridors, structure, and mechanical rooms; used for building efficiency and code area limits.
- Request for information (RFI)
- Related: Submittal, Change order
A written request from the contractor to the design team asking for clarification of drawings or specifications; the written answer becomes part of the contract documents.
- Submittal
- Related: Shop drawing, Request for information (RFI)
Product data, samples, or shop drawings the contractor sends for the designer's review to confirm that proposed materials and equipment meet the specified requirements.
- Shop drawing
- Related: Submittal, Request for information (RFI)
A drawing prepared by a fabricator or contractor showing how a specified component will actually be made and installed, submitted for review before fabrication begins.
- Change order
- Related: Substantial completion, Request for information (RFI)
A written amendment, signed by owner and contractor, that modifies the contract sum, contract time, or scope of work after the contract has been executed.
- Substantial completion
- Related: Change order, Request for information (RFI)
The stage when the work is sufficiently finished that the owner can occupy and use it for its intended purpose, leaving only minor punch-list items to correct.
- Standard of care
The degree of skill and diligence ordinarily exercised by competent interior designers under similar circumstances; the legal benchmark for judging claims of professional negligence.
- Floor plan
- Related: Reflected ceiling plan, Interior elevation
A scaled overhead view of a space cut at roughly four feet above the floor, showing walls, doors, fixtures, and furniture locations.
- Reflected ceiling plan
- Related: Floor plan
A drawing that views the ceiling as if it were reflected in a mirror on the floor, so ceiling features appear in the same orientation as the floor plan below.
- Interior elevation
- Related: Finish schedule, Floor plan
A scaled, flat view of a single wall surface showing finishes, millwork, and openings, used to document design intent and construction details.
- Section drawing
- Related: Detail drawing
A scaled vertical cut through a building or assembly showing the relationship of floors, ceilings, and structure as seen looking at the cut line.
- Detail drawing
- Related: Section drawing
An enlarged drawing of a small portion of the work, such as a joint or connection, that shows materials and assembly in enough depth to build it.
- Finish schedule
- Related: Interior elevation, Construction documents
A table listing each room with the floor, base, wall, and ceiling finishes specified for it, using product identifiers tied to the written specifications.
- Construction documents
- Related: Finish schedule, Change order
The drawings and specifications that fully describe the work, forming the legal basis for bidding, permitting, and construction of the project.
- MasterFormat
- Related: Performance specification, Prescriptive specification
A standardized numbering system for construction specifications and related documents, organized into divisions such as concrete, finishes, and electrical.
- Performance specification
- Related: Prescriptive specification, MasterFormat
A specification that states the required results, such as a fire rating or acoustical value, and leaves the means of achieving them to the contractor or manufacturer.
- Prescriptive specification
- Related: Performance specification, MasterFormat
A specification that names specific products, materials, or methods the contractor must use, giving the designer tight control over the finished result.
- Mock-up
- Related: Submittal, Shop drawing
A full-size sample of an assembly or finish built on site or in a factory for approval before work proceeds, often retained as the quality benchmark.
- Flame-spread rating
- Related: Occupancy classification, Prescriptive specification
A number from a standard tunnel test describing how quickly flame spreads across a material's surface, used to limit interior finishes in exits and other regulated spaces.
- Color rendering index (CRI)
- Related: Footcandle
A scale from 0 to 100 describing how accurately a light source shows colors compared with a reference source; higher values render colors more faithfully.
- Footcandle
- Related: Color rendering index (CRI)
A unit of illuminance equal to one lumen falling on one square foot of surface, used to compare lighting levels against recommended practice.
- Noise reduction coefficient (NRC)
- Related: Sound transmission class (STC)
A single number from 0 to 1 rating how much sound a material absorbs at speech frequencies; higher values mean less reflected sound in a room.
- Sound transmission class (STC)
- Related: Noise reduction coefficient (NRC), Plenum
A single-number rating of how well a wall, floor, or partition blocks airborne sound; higher ratings mean more acoustical privacy between spaces.
- Plenum
- Related: Fire-resistance rating, Sound transmission class (STC)
The space between a suspended ceiling and the structure above when it is used to carry return air; its use is restricted by code because of fire and smoke concerns.
- Volatile organic compounds (VOCs)
- Related: Flame-spread rating
Chemicals that evaporate from paints, adhesives, carpets, and composite wood, contributing to indoor air problems; many rating programs set low-emission limits.
- Means of egress
- Related: Travel distance, Dead-end corridor, Occupant load
The continuous, unobstructed path from any point in a building to a public way, made up of exit access, the exit itself, and exit discharge.
- Occupant load
- Related: Means of egress, Travel distance, Net floor area
The number of people a space is calculated to hold, found by dividing its area by a code factor; it sets egress width, exit count, and fixture counts.
- Travel distance
- Related: Means of egress, Dead-end corridor, Occupant load
The measured length of the route from the most remote point of a space to the nearest exit, limited by code according to occupancy and sprinkler protection.
- Dead-end corridor
- Related: Travel distance, Means of egress
A corridor segment with only one direction of escape, limited in length by code because occupants could be cut off by fire or smoke.
- Fire-resistance rating
- Related: Fire barrier, Occupancy classification
The time in hours that a building assembly holds back fire under a standard test, shown on a tested assembly listing and required by the building code.
- Fire barrier
- Related: Fire-resistance rating, Means of egress
A fire-resistance-rated wall assembly, continuous through concealed spaces, that confines fire and smoke and protects openings with rated doors or shutters.
- Clear floor space
- Related: Accessible route
The unobstructed area a wheelchair needs to park, typically 30 by 48 inches, provided at fixtures, appliances, and controls along an accessible route.
- Occupancy classification
- Related: Occupant load, Fire-resistance rating, Gross floor area
The building-code grouping of a space by its use, such as business, assembly, or mercantile, which determines allowable area, exits, and fire protection requirements.
- Accessible route
- Related: Clear floor space
A continuous path connecting accessible entrances, spaces, and elements that meets code requirements for width, slope, surface, and clearances.