NCIDQ study materials
NCIDQ study resources

NCIDQ study plan

NCIDQ · Give each week a clear focus.

8 weeks · About 7 hours per week

Week 1

Design Communication and Documentation

  • Draft a dimensioned floor plan and a matching reflected ceiling plan for the same space using one consistent graphic convention set

  • Assemble a sheet index and title block standard, then label each sheet by discipline, phase, and scale

  • Convert a schematic sketch into a fully annotated construction detail at 3/4 in. = 1 ft-0 in.

  • Keynote a plan using CSI-style reference numbers and build the matching keynote legend

Your checkpoint

A self-produced 8-sheet mini drawing set (plan, RCP, interior elevation, detail, schedule, legend, cover, index) audited against a 15-item drawing-convention checklist you write yourself.

Week 2

Design Communication and Documentation & Construction, Materials, and Specifications

  • Write a complete three-part specification section for a gypsum board assembly using MasterFormat numbering

  • Sort 15 interior finish materials into the correct specification divisions and note the governing test standard for each

  • Compare three wall assemblies on STC, fire-resistance rating, thickness, and installed cost

  • Build a finish schedule that records fire rating, wear rating, and maintenance requirement per material

Your checkpoint

A one-page finish schedule covering 10 materials, each with a written code-driven and performance-driven selection justification.

Week 3

Construction, Materials, and Specifications

  • Diagram the construction sequence for a partition-to-ceiling assembly, from substrate through finish

  • Specify substrates, membranes, and sealants for wet areas and defend each choice

  • Distinguish prescriptive from performance specifying and identify where each approach belongs

  • Evaluate three substitution requests against the basis-of-design and write a ruling on each

Your checkpoint

A materials comparison matrix of 12 products scored across 4 criteria, plus three written substitution rulings with rationale.

Week 4

Building Systems and Interior Environmental Quality

  • Calculate required fixture counts and illuminance for two rooms using the lumen method

  • Trace air distribution from air handler to diffuser and label every component along the path

  • Select acoustic treatments to hit a target NC rating in a conference room and justify each selection

  • Identify indoor environmental quality strategies that address VOCs, ventilation rates, and daylight access

Your checkpoint

A one-page building systems narrative for a 2,000 sq ft office covering HVAC, lighting, acoustics, and indoor air quality, with all calculations shown.

Week 5

Codes, Standards, and Regulations

  • Calculate occupant load and required egress width for three different occupancy classifications

  • Determine maximum travel distance and minimum number of exits for a given floor plate

  • Apply accessibility requirements to a restroom, a door assembly, and a circulation path

  • Classify a building by construction type and list the required fire-resistance ratings for its elements

Your checkpoint

A code analysis worksheet for one hypothetical project covering occupancy classification, occupant load, egress compliance, and accessibility findings.

Week 6

Programming, Planning, and Analysis

  • Run a mock client interview and convert the answers into a written needs and goals statement

  • Build an adjacency matrix and a bubble diagram directly from a written program

  • Test two blocking options against square footage, circulation, and daylight targets

  • Quantify net-to-gross ratio and per-department space allocations for the preferred option

Your checkpoint

A two-page program document containing the adjacency matrix, two blocking options drawn to scale, and a written recommendation with the numbers that support it.

Week 7

Professional Practice and Contract Administration

  • Compare owner-architect agreement types and compensation methods, and state when each is appropriate

  • Map the submittal, RFI, and change order workflows with the responsible party named at every step

  • Sequence the phases of service from programming through post-occupancy evaluation

  • Distinguish professional liability, negligence, and the standard of care using concrete scenarios

Your checkpoint

A one-page contract administration flowchart plus a self-written 10-question quiz on professional practice scored at 80% or better.

Week 8

Design Communication and Documentation & Construction, Materials, and Specifications & Building Systems and Interior Environmental Quality & Codes, Standards, and Regulations & Programming, Planning, and Analysis & Professional Practice and Contract Administration

  • Sit two timed 100-question practice sets under exam conditions without notes

  • Re-drill the two lowest-scoring domains revealed by the practice sets

  • Recite the core formulas for occupant load, egress width, lighting, and NC rating from memory

  • Compress each of the six domains onto a single summary sheet in your own words

Your checkpoint

A score report showing at least 75% on both practice sets, plus six one-page domain summary sheets for final review.

Milestones

Week 2: Complete the 8-sheet drawing set and the 10-material finish schedule; re-read both cold and correct every inconsistency you catch before moving on.

Week 4: Explain a wall assembly, a finish specification, an air distribution path, and a lighting calculation out loud without notes for two minutes each.

Week 6: Pass a self-scored 25-question mixed set on codes and programming at 70% or better, and log every missed item with the reason for the miss.

Week 8: Score 75% or higher on both timed practice sets and hold all six domain summary sheets in hand one week before the exam.