ND Asbestos Abatement study materials
ND Asbestos Abatement study resources

ND Asbestos Abatement cheat sheet

ND Asbestos Abatement ยท Keep the key ideas within reach.

Quick reference

Asbestos Abatement Worker

  • Asbestos means the asbestiform varieties of chrysotile, crocidolite, amosite, anthophyllite, tremolite, and actinolite; only these six are regulated under NESHAP and OSHA.

  • OSHA PEL is 0.1 f/cc as an 8-hour TWA; the excursion limit is 1.0 f/cc averaged over any 30-minute sampling period.

  • Personal air samples are evaluated against the PEL only when they represent at least 390 minutes of a 480-minute shift; otherwise use the full-shift TWA calculation.

  • Required PPE in a regulated area: disposable coveralls, head and foot covers, gloves, and negative-pressure respirator with HEPA filters; PAPRs are common for class I work.

  • Respirator assigned protection factors: half-mask APR = 10, full-face APR = 50, full-face PAPR = 1,000, supplied-air continuous-flow hood = 1,000.

  • Decontamination sequence leaving the work area: dirty room (remove outer clothing) โ†’ shower room (wash) โ†’ clean room (dress); never reverse the flow.

  • Wet methods, HEPA local exhaust, and glove bags control fiber release; dry sweeping and compressed air are prohibited on asbestos debris.

  • A regulated area must be demarcated with warning signs bearing the legend DANGER, ASBESTOS, AUTHORIZED PERSONNEL ONLY, and access limited to trained, protected workers.

Quick reference

Asbestos Abatement Contractor/Supervisor

  • A negative-pressure enclosure must maintain at least 0.02 inches of water column (5 Pa) differential relative to adjacent areas; monitor with a manometer and record readings.

  • Final clearance requires visual inspection with no visible debris, then aggressive air sampling (leaf blower or equivalent) with 5 PCM samples inside the containment.

  • Clearance criterion: all inside samples must be below 0.01 f/cc by PCM (NIOSH 7400), or the project specification's stricter limit, before reoccupancy.

  • Notification to the state or EPA must be submitted at least 10 working days before abatement begins where required by the local program; keep a copy on site.

  • Supervisor duties: pre-abatement inspection, written work plan, employee training records, respirator fit tests, medical surveillance, exposure monitoring, and waste manifests.

  • Waste must be containerized in leak-tight, labeled containers marked with the OSHA warning and the generator's name, location, and quantity; NESHAP requires no visible emissions during transport.

  • Critical barriers seal HVAC openings, doors, and windows; the decontamination unit must be attached and sealed to the enclosure before work starts.

  • Recordkeeping: exposure monitoring records 30 years, medical records duration of employment plus 30 years, training records for the duration of employment.

Quick reference

Asbestos Inspector

  • Inspection requires sampling of each homogeneous area (HA) in each functional space; at least 3 samples per HA, or more if the material is non-uniform.

  • Bulk samples are analyzed by PLM (polarized light microscopy) per EPA 600/R-93/116; point counting to 400 points is used when the result is near 1%.

  • Materials are classified as friable or non-friable, and by type: surfacing (TSI), thermal system insulation, and miscellaneous (floor tile, mastic, roofing).

  • A homogeneous area is material that appears uniform in color and texture and was installed at the same time; different application dates create separate HAs.

  • Inspector must assess material condition (good, damaged, significantly damaged) and potential for disturbance when recording findings.

  • Sampling must penetrate all layers of the material; a coring tool or tri-tube is used for layered materials, and each layer is analyzed separately.

  • Bulk sample results below the detection limit of PLM (about 1%) are reported as none detected; do not treat that as a guarantee of zero asbestos.

  • The inspection report must document sampling locations, HA descriptions, quantities, analytical method, and a diagram or floor plan of the building.

Quick reference

Asbestos Management Planner

  • The management plan applies to schools under AHERA and must be updated every 3 years; the inspection itself is repeated every 3 years.

  • O&M (operations and maintenance) programs apply to friable ACM that will not be disturbed; periodic surveillance is required every 6 months.

  • Response actions in order of preference: removal, enclosure, encapsulation, repair, O&M, and no action; selection depends on condition, accessibility, and likelihood of disturbance.

  • Hazard assessment combines material assessment (condition, friability, accessibility) with likelihood of disturbance to assign a priority ranking.

  • Reinspection must be done every 3 years by a certified inspector, and the management planner revises the plan based on the new assessment.

  • Enclosure leaves the material in place behind a rigid barrier; encapsulation seals the surface with a coating; neither eliminates the hazard permanently.

  • The plan must include a schedule for implementation, a budget estimate, and designation of the person responsible for the plan's execution.

  • Records of the management plan must be available to parents, teachers, and employees, and to EPA on request.

Quick reference

Asbestos Project Designer

  • The designer selects abatement method (removal, enclosure, encapsulation), writes specifications, and prepares the containment and decontamination layout.

  • Negative air machines are sized by enclosure volume; a common rule is one air change every 15 minutes or enough to hold 0.02 in. w.c. negative pressure.

  • The design must specify a critical barrier plan, worker decontamination unit, waste load-out route, and emergency egress.

  • Clearance protocol in the design should specify the number of samples, the sampling method (PCM or TEM), and the pass/fail limit before reoccupancy.

  • The designer must consider building systems: HVAC shutdown, electrical isolation, fire alarm and sprinkler coverage, and structural support for containments.

  • Specifications must define the analytical method for both bulk (PLM) and air (PCM or TEM) and the required reporting turnaround.

  • Design documents should include a pre-abatement inspection report reference, a scope of work, and a schedule of values for payment.

  • The designer must verify that the contractor's plan meets the specification before work begins, including containment details and air monitoring.

Quick reference

Asbestos Project Monitor

  • The project monitor verifies the contractor's work against the specification: containment integrity, negative pressure, work practices, and worker protection.

  • Air monitoring during abatement uses PCM (NIOSH 7400) for clearance and worker exposure; TEM is used where the specification requires it or for final clearance.

  • Clearance sampling: at least 5 samples inside the containment after aggressive air movement, with all results below 0.01 f/cc by PCM for a pass.

  • Document manometer readings, air change rates, and any pressure loss; a sustained loss of negative pressure is a stop-work condition.

  • The monitor must confirm critical barriers are sealed, the decontamination unit is functional, and waste containers are properly labeled before load-out.

  • Daily logs should record dates, times, personnel, monitoring results, deviations, and corrective actions taken.

  • Final report should include the inspection findings, air monitoring data, clearance results, and a statement of compliance with the specification.

  • The monitor does not direct the contractor's workers; findings are communicated to the owner and contractor for correction.