NE General Contractor study materials
NE General Contractor study resources

NE General Contractor cheat sheet

NE General Contractor · Keep the key ideas within reach.

Quick reference

Business Organization, Licensing, and Nebraska Law

  • Nebraska contractor license types: General Contractor (unlimited), Building Contractor (limited scope), and Specialty Contractor categories administered by the Nebraska Department of Labor's Contractor Registration program.

  • Contractor registration is required for projects over $5,000 (labor and materials combined); registration is not a competency exam but failure to register bars enforcement of the contract and permits penalties.

  • Nebraska requires a separate Electrical Contractor, Master/Journeyman Electrician license through the State Electrical Division, and plumbing licensure through local jurisdictions or the state plumbing board.

  • Nebraska Workers' Compensation coverage is mandatory for employers with one or more employees; sole proprietors and partners may elect coverage but corporate officers are counted.

  • Nebraska's 5-year statute of repose for construction defects (Neb. Rev. Stat. § 25-223) limits claims arising from defective design or construction of improvements to real property.

  • Mechanics' lien: a contractor must file a lien within 120 days after last furnishing labor or materials; a subcontractor must give a preliminary notice to the owner within 10 days of first furnishing.

  • Nebraska Prompt Payment Act: public owners must pay within 30 days of a proper invoice; retainage on public projects is limited and must be released within 30 days of final acceptance.

  • Business entity selection affects liability: a corporation or LLC shields personal assets, but Nebraska requires foreign entities to register with the Secretary of State and maintain a registered agent.

Quick reference

Contract Administration, Bidding, and Project Management

  • Contract types: lump sum (fixed price, risk on contractor), unit price (quantity risk on owner), cost-plus (owner bears cost risk), and GMP (cost plus with a guaranteed maximum and shared savings).

  • Bid documents must be acknowledged by addendum; failure to acknowledge an addendum on the bid form is grounds for bid rejection as nonresponsive.

  • Bid bond typically 5-10% of bid; performance bond and payment bond each typically 100% of contract amount on public work.

  • Critical path method (CPM): total float = LS - ES = LF - EF; an activity on the critical path has zero total float and any delay there extends project completion.

  • Change order vs. construction change directive: a CCD directs work before price agreement; a change order is a signed agreement to scope, price, and time.

  • Substantial completion triggers warranty start, retainage release provisions, and owner's right to occupy; punch list items must be completed within a stated period.

  • Schedule of values and pay applications: progress payments are based on percentage of work in place; retainage typically 5-10% until substantial completion.

  • Liquidated damages are a pre-estimated per-day amount for delay; they must be a reasonable forecast, not a penalty, to be enforceable.

Quick reference

Estimating, Plans, and Specifications

  • Scale conversion: at 1/4" = 1'-0", one inch on the drawing equals 4 feet; at 1/8" = 1'-0", one inch equals 8 feet.

  • Waste factors: lumber 10-15%, concrete 5-10%, masonry 5-7%, roofing 10-15%, drywall 10-12%, tile 10-15% - applied to net quantities.

  • Concrete volume: length × width × depth in feet ÷ 27 = cubic yards; add 5% for spillage and uneven subgrade.

  • Specification divisions follow CSI MasterFormat 50 divisions; Division 01 is General Requirements, Division 03 Concrete, Division 05 Metals, Division 09 Finishes.

  • Plan symbols: dashed line = hidden/overhead; solid = visible; section markers show drawing and detail reference; north arrow and benchmark establish orientation and elevation.

  • Quantity takeoff sequence: review all drawings and addenda, measure by trade, apply waste, price labor and material separately, then add overhead and profit.

  • Contingency in estimates: design contingency (5-10% during design), construction contingency (3-5% during construction), and escalation for inflation on long projects.

  • Bid strategy: unbalanced bidding shifts costs to early or high-quantity items; front-end loading improves cash flow but may be rejected as nonresponsive.

Quick reference

Safety and Occupational Health (OSHA)

  • Fall protection required at 6 feet in construction (29 CFR 1926.501); guardrails, safety nets, or personal fall arrest systems are acceptable.

  • Scaffold requirements: top rail 38-45 inches, midrail approximately 21 inches, toe board 3.5 inches; scaffold must support 4 times intended load.

  • Excavation: protective system required at 5 feet depth; spoil pile and equipment kept at least 2 feet from the edge; ladder every 25 feet of lateral travel.

  • Ladder angle: 4:1 ratio (1 foot out for every 4 feet up); extend 3 feet above landing for access to roofs.

  • Cranes: load chart must be in cab, swing radius barricaded, and 10-foot minimum clearance from power lines (or de-energize and ground).

  • Hazard Communication (HazCom) requires Safety Data Sheets (SDS) for each hazardous chemical and labeling of all containers.

  • Personal protective equipment: hard hats, safety glasses, and ANSI-rated footwear on all active construction sites; hearing protection at 85 dBA TWA.

  • Recordkeeping: OSHA 300 log required for employers with 11+ employees; fatalities reported within 8 hours, hospitalizations/amputations within 24 hours.

Quick reference

Site Work, Concrete, and Foundations

  • Soil classification: granular soils (gravel, sand) drain well and have high bearing capacity; cohesive soils (clay, silt) are subject to frost heave and shrink-swell.

  • Standard Proctor (ASTM D698) vs. Modified Proctor (ASTM D1557): modified uses greater energy and yields higher maximum dry density; field compaction typically specified to 95% of modified.

  • Concrete mix: water-cement ratio controls strength and durability; 0.45-0.50 w/c for typical structural concrete; lower w/c = higher strength and lower permeability.

  • Concrete cure: 7 days moist curing for Type I cement; cold weather requires heated enclosure and protection below 40°F; hot weather requires cooling and evaporation control.

  • Rebar: #4 bar = 1/2 inch diameter; #5 = 5/8 inch; #8 = 1 inch. Development length and cover per ACI 318 (typically 1.5-3 inches depending on exposure).

  • Footing types: spread footing (isolated), combined footing, mat/raft foundation (large loads, weak soils), and deep foundations (piles, drilled shafts, caissons).

  • Concrete testing: slump test (ASTM C143) for workability; air content by pressure meter; compressive strength by 6x12 or 4x8 inch cylinders at 7 and 28 days.

  • Drainage: footing drains at base of footing, sloped to daylight or sump; waterproofing on below-grade walls (membrane or fluid-applied) and gravel backfill.

Quick reference

Masonry, Carpentry, and Structural Framing

  • Concrete masonry unit (CMU) nominal 8x8x16 inches; actual 7-5/8 x 7-5/8 x 15-5/8; mortar joint 3/8 inch.

  • Brick modular: 3-5/8 x 2-1/4 x 7-5/8 inches; running bond offsets each course by half a brick; common bonds: running, Flemish, English, stack.

  • Mortar types: Type M (highest strength, below grade), Type S (moderate-high, typical exterior), Type N (general purpose above grade), Type O (low strength, interior non-load-bearing).

  • Wall ties: corrosion-resistant ties every 16 inches horizontally and 24 inches vertically; flashing and weep holes at base of cavity walls.

  • Wood framing: nominal 2x4 is 1.5 x 3.5 inches; 2x6 is 1.5 x 5.5; 2x10 is 1.5 x 9.25; framing spacing 16 or 24 inches on center.

  • Floor joists: maximum span depends on species, grade, and spacing; bridging or blocking at midspan for spans over 8 feet; rim joist and subfloor glued and nailed.

  • Roof framing: rafters, ridge board, collar ties (upper third of rafter), and ceiling joists to resist thrust; hip vs. gable roof geometry.

  • Sheathing: OSB or plywood rated by span rating (e.g., 24/16); nailed at 6 inches on center at edges, 12 inches in field; panel edges must fall on framing.

Quick reference

Roofing, Thermal and Moisture Protection

  • Roof slope: low slope is 2:12 or less; steep slope is greater than 4:12; underlayment requirements differ by slope and product.

  • Asphalt shingles: minimum 4:12 slope for standard installation; double underlayment for slopes 2:12 to 4:12; ice dam membrane required at eaves in cold climates.

  • Built-up roofing (BUR): alternating layers of felt and bitumen; 4-ply typical; flood coat and gravel surfacing; requires a vapor retarder and insulation board.

  • Single-ply membranes: EPDM (thermoset, seamed with adhesive or tape), TPO and PVC (thermoplastic, heat-welded).

  • Flashing types: base flashing, counterflashing, step flashing at sidewalls, and cricket at chimneys wider than 30 inches.

  • Vapor retarder placement: on the warm side of insulation in cold climates to prevent condensation within the assembly.

  • Insulation R-values: rigid foam board (polyiso ~R-6 per inch, XPS ~R-5, EPS ~R-4), fiberglass batt (~R-3.1 per inch), spray polyurethane (~R-6 to R-7 per inch).

  • Air barrier continuity: seal penetrations, top plates, and rim joists; blower door test measures air changes per hour (ACH50) to verify performance.

Quick reference

Mechanical, Electrical, and Plumbing Systems

  • HVAC tonnage: one ton of cooling = 12,000 BTU/hour; rule of thumb 1 ton per 400-600 square feet depending on climate and envelope.

  • Duct sizing: velocity method (fpm) or equal friction method; supply trunk velocities typically 600-900 fpm for residential, higher for commercial.

  • Refrigerant cycle: compressor → condenser (rejects heat) → expansion valve → evaporator (absorbs heat); SEER2 and HSPF2 are efficiency ratings.

  • Electrical: Ohm's law V = I × R; power P = V × I (single-phase); P = √3 × V × I × PF for three-phase.

  • Ampacity and derating: conductors sized per NEC 310.16; derate for ambient temperature and more than 3 current-carrying conductors in a raceway.

  • GFCI required in bathrooms, kitchens, outdoors, garages, and within 6 feet of sinks; AFCI required in bedrooms and living areas per NEC.

  • Plumbing: drain slope 1/4 inch per foot for 2-inch and smaller pipe, 1/8 inch per foot for 3-inch and larger; vent stack extends above roof.

  • Water supply: typical pressure 40-80 psi; pressure-reducing valve above 80 psi; backflow preventer required at connections to potable supply.

Quick reference

Interior Finishes and Doors/Windows

  • Gypsum board types: regular, Type X (fire-rated, 5/8 inch), moisture-resistant (green board, for bathrooms), and abuse-resistant for high-traffic areas.

  • Drywall finishing levels 1-5: Level 4 is standard for painted surfaces; Level 5 requires a skim coat for critical lighting conditions.

  • Fire-rated wall assemblies: 1-hour rating often achieved with 5/8 inch Type X on each side of steel studs; 2-hour requires additional layers or specific UL designs.

  • Door types: hollow-core (interior, lightweight), solid-core (interior, better acoustics), and hollow metal (commercial, fire-rated).

  • Door hardware: standard locksets, panic hardware required on egress doors serving 50+ occupants; closers required on fire doors.

  • Window ratings: U-factor measures heat loss (lower is better); SHGC measures solar heat gain; VT is visible transmittance; NFRC labels verify performance.

  • Glazing: insulated glass units (IGU) with low-E coatings and argon fill; tempered glass required in hazardous locations (doors, within 24 inches of floor, large panels).

  • Tile and flooring: ceramic vs. porcelain (porcelain lower absorption); hardwood expansion gaps at walls; carpet cushion and tack strip installation.