NE General Contractor · Give each week a clear focus.

8 weeks · About 6 hours per week

Week 1

Business Organization, Licensing, and Nebraska Law

  • Outline Nebraska contractor licensing tiers, the application process, and renewal requirements from memory

  • Summarize business-entity options (sole proprietorship, LLC, corporation, partnership) and their liability and tax implications for a contractor

  • List Nebraska-specific statutes and rules governing contractors, including lien law basics and consumer protection provisions

  • Draft a one-page checklist of records a contractor must retain for licensing and tax compliance

Your checkpoint

A two-page written summary of Nebraska licensing, business-entity, and lien-law rules with a compliance checklist

Week 2

Business Organization, Licensing, and Nebraska Law & Contract Administration, Bidding, and Project Management

  • Explain how contract types (lump sum, unit price, cost-plus, T&M) shift risk between owner and contractor

  • Identify the key clauses of a construction contract and describe the consequence of each being missing or ambiguous

  • Describe the bid process from invitation through award, including bid bonds, bid opening, and rejection rights

  • Outline project delivery methods (design-bid-build, design-build, CM at risk) and match each to a typical public or private project

Your checkpoint

A contract-clause checklist and a one-page comparison table of delivery methods and contract types

Week 3

Contract Administration, Bidding, and Project Management & Estimating, Plans, and Specifications

  • Apply the CSI MasterFormat divisions to classify a set of work items into the correct division

  • Read a set of construction drawings and extract dimensions, notes, and referenced standards without an index

  • Perform quantity takeoffs for concrete, masonry, and framing from given dimensions

  • Set up and explain a simple critical-path schedule with dependencies and float

  • Identify common sources of specification conflict and state the standard order of precedence

Your checkpoint

A worked takeoff and schedule exercise with at least three quantity calculations and a precedence-of-documents explanation

Week 4

Safety and Occupational Health (OSHA)

  • Identify the OSHA construction standards most frequently cited and the hazard each addresses

  • Explain the hierarchy of controls and apply it to fall, struck-by, caught-in, and electrical hazards

  • Describe fall-protection triggers, anchor-point requirements, and rescue-plan obligations

  • Outline excavation and trenching protective-system requirements and the role of the competent person

  • List recordkeeping, reporting, and training obligations under OSHA standards

Your checkpoint

A site-specific safety plan outline covering fall protection, excavation, and hazard communication, with a 20-item self-quiz scored at 80% or better

Week 5

Site Work, Concrete, and Foundations

  • Sequence site-work operations from clearing and grading through utilities and paving

  • Explain soil classification, compaction testing, and bearing-capacity concepts as they affect foundations

  • Describe formwork, reinforcement placement, and concrete placement, curing, and testing requirements

  • Identify common concrete defects and the corrective actions for each

  • Distinguish shallow and deep foundation types and the conditions that favor each

Your checkpoint

A one-page flowchart of site-work and foundation sequencing plus a table of five concrete defects with causes and fixes

Week 6

Masonry, Carpentry, and Structural Framing

  • Describe masonry units, mortar types, and the role of flashing, weep holes, and wall ties

  • Explain structural framing systems for wood, steel, and engineered lumber and their connection methods

  • Identify load-path concepts and how framing transfers gravity and lateral loads to the foundation

  • List inspection points for masonry and framing that a general contractor must schedule

  • Explain fireblocking, draftstopping, and code-required framing details

Your checkpoint

A framing and masonry inspection checklist mapped to construction sequence, with at least 15 checkpoints

Week 7

Roofing, Thermal and Moisture Protection & Mechanical, Electrical, and Plumbing Systems

  • Compare low-slope and steep-slope roofing systems and their flashing and drainage requirements

  • Explain the components of the building envelope: waterproofing, air barrier, vapor retarder, and insulation placement

  • Describe basic HVAC, plumbing, and electrical system layouts and the rough-in coordination sequence

  • Identify the most common MEP coordination conflicts and how to resolve them before rough-in

  • Explain commissioning and testing requirements for envelope and MEP systems

Your checkpoint

A two-page envelope and MEP coordination summary with a rough-in sequencing diagram and five common conflicts with resolutions

Week 8

Interior Finishes and Doors/Windows & Contract Administration, Bidding, and Project Management & Business Organization, Licensing, and Nebraska Law

  • Describe interior finish systems: drywall levels, flooring, ceilings, and paint and their inspection criteria

  • Explain door and window types, hardware, and egress and fire-rating requirements for openings

  • Review the full domain weightings and reallocate remaining study time to the weakest areas

  • Complete a timed practice exam and analyze errors by domain

  • Rehearse Nebraska law and contract-administration facts that are easy to forget

Your checkpoint

A scored practice exam with a written error analysis and a prioritized final-review list for each domain

Milestones

Week 2: Score at least 80% on a self-made 25-question quiz covering Nebraska licensing, business entities, contract types, and delivery methods

Week 4: Explain the fall-protection and excavation standards aloud from memory and pass a 20-item OSHA self-quiz at 80% or better

Week 6: Complete a combined site-work, concrete, masonry, and framing takeoff exercise with no more than two calculation errors

Week 8: Score at least 75% overall on a timed practice exam and at least 70% in every domain, with a written remediation plan for any domain below 70%