- Authority having jurisdiction
- The organization, office, or individual responsible for approving equipment, installations, or procedures and for enforcing the code requirements adopted in a jurisdiction.
- Performance-based design
- A design approach permitted by NFPA 101 Chapter 5 that uses fire scenarios, engineering analysis, and documented acceptance criteria to show life safety equivalent to prescriptive requirements.
- Hydraulic calculations
- Submittal documents for sprinkler plans that show water supply, pipe sizes, friction loss, and the most remote area demand compared with the available water supply.
- Certificate of occupancy
- Document issued by the AHJ after construction and acceptance testing confirm that a building complies with approved plans and the applicable fire code before occupancy is permitted.
- NFPA 25
- Standard for the Inspection, Testing, and Maintenance of Water-Based Fire Protection Systems, governing routine ITM activities after a system has been accepted and placed in service.
- As-built drawings
- Revised construction documents showing actual installed conditions, kept by the owner and made available to the AHJ for verification, maintenance, modification, or inspection activities.
- Equivalency (alternative means)
- A proposed alternative that does not literally comply with a code requirement but provides equivalent or greater safety, subject to technical documentation and formal approval by the AHJ.
- Type I construction
- Noncombustible construction with the highest fire resistance ratings, typically 2 to 3 hours for structural members and 2 hours for floor and roof assemblies.
- Type IV construction
- Heavy timber construction using solid or laminated wood members of minimum required dimensions, with noncombustible exterior walls and no concealed combustible spaces.
- ASTM E119 test
- Standard fire test method that exposes an assembly to a controlled time-temperature curve to establish a fire resistance rating expressed in hours.
- Restrained assembly rating
- A fire resistance rating applied to assemblies with sufficient restraint against thermal expansion; often higher than the unrestrained rating for the same assembly design.
- Fire wall
- A fire-resistance-rated wall with structural stability that divides a building into separate building areas and resists fire from either side, as specified in NFPA 221.
- Smoke barrier
- A continuous membrane or assembly, typically at least one-half hour rated, intended to restrict smoke movement between areas, with openings protected by smoke assemblies.
- Business occupant load factor
- One occupant per 100 square feet of gross floor area for business occupancies, used to compute total occupant load for egress capacity and exit requirements.
- Egress capacity factor
- Level components and ramps require 0.2 inch of clear egress width per occupant; stairs require a larger width per occupant because of slower movement.
- Exit remoteness
- Required exits must be separated by at least one-half the diagonal of the floor area served, reduced to one-third where the building is protected by automatic sprinklers.
- Dead-end corridor limit
- Corridors may terminate in a dead end limited to 20 feet, increased to 50 feet where the building is protected throughout by an automatic sprinkler system.
- Emergency lighting duration
- Means of egress illumination must be provided for at least 90 minutes, averaging at least 1 footcandle at the floor with a 0.1 footcandle minimum.
- Panic hardware
- Door hardware required on egress doors serving assembly occupancies with occupant loads of 100 or more, releasing with a single motion without a key or special knowledge.
- Egress components
- The three parts of a means of egress: exit access is the path to an exit, the exit is the protected way out, and exit discharge leads to the public way.
- Light hazard density
- Sprinkler design density of 0.10 gpm per square foot over a 1,500 square foot remote area, applied to occupancies with low fuel loads and low combustibility.
- Ordinary Hazard Group 2
- Sprinkler design density of 0.20 gpm per square foot over 1,500 square feet, used where combustible contents are moderate and stockpiles do not exceed 12 feet.
- Fire pump 150 percent flow
- At 150 percent of rated flow, a fire pump must deliver at least 65 percent of its rated head to satisfy NFPA 20 performance requirements.
- Smoke detector spacing
- On smooth ceilings, spot-type smoke detectors may be spaced not more than 30 feet apart, with the first detector within 21 feet of a sidewall.
- Class A extinguisher travel
- Maximum travel distance to a Class A portable extinguisher is 75 feet; Class B locations are limited to 30 or 50 feet depending on hazard severity.
- Standpipe classes
- Class I provides 2.5-inch outlets for fire department use, Class II provides 1.5-inch hose stations for occupants, and Class III provides both types.
- NFPA 704 diamond
- Hazard identification marking with blue health, red flammability, and yellow instability quadrants rated 0 to 4, plus a white quadrant for special hazards.
- Class IB liquid
- A flammable liquid with a flash point below 73 degrees F and a boiling point at or above 100 degrees F under the NFPA 30 classification scheme.
- Flammable storage cabinet
- A cabinet may hold a maximum of 60 gallons of Class I or II liquids, or 120 gallons of Class III liquids, and is not required to be vented.
- Hot work clearance
- NFPA 51B requires a 35-foot clearance from combustibles, or approved protection, plus a fire watch and permit for cutting, welding, and similar operations.
- Combustible dust standard
- NFPA 652 provides fundamentals for the combustible dust hazard analysis, supported by commodity-specific standards such as NFPA 654 for particulate solids.
- Class I Division 1
- A location where ignitible concentrations of flammable gases or vapors exist under normal operating conditions, or frequently due to repair, maintenance, or leakage.