NFPA CFPE · Give each week a clear focus.

8 weeks · About 7 hours per week

Week 1

Building Construction and Fire Resistance

  • Classify all five building construction types by structural frame, exterior bearing wall, and interior element materials, and state the fire-resistance rating each element must carry.

  • Match hourly ratings to specific elements - columns, beams, girders, floor/ceiling assemblies, roof assemblies, and shaft enclosures - for each construction type without consulting notes.

  • Distinguish fire walls, fire barriers, fire partitions, and smoke barriers by required rating, continuity, and the openings each permits.

  • Determine when opening protectives (fire doors, fire windows, fire dampers, penetration firestops) are required and what rating each opening assembly must carry.

Your checkpoint

A one-page construction-type comparison matrix listing required element ratings for Types I through V plus opening protective ratings, self-tested by written recall to at least 90% accuracy.

Week 2

Fire Protection, Detection, and Suppression Systems

  • Describe the stages of fire development and match detection technology and suppression response to each stage.

  • Differentiate wet, dry, preaction, and deluge sprinkler systems by activation sequence, piping condition, and the occupancies or hazards each serves.

  • Verify sprinkler spacing, coverage, and obstruction rules from a written room description with only dimensions and ceiling height given.

  • Trace a signal path from initiating device through the control unit to notification appliances, including waterflow, valve tamper, and supervisory signals.

  • Select detection technology appropriate to a stated hazard among ionization, photoelectric, projected-beam, air-sampling, and heat detection.

Your checkpoint

A decision table mapping ten written hazard scenarios to detection type, suppression type, and required supervisory signals, produced from memory and then corrected against reference material.

Week 3

Means of Egress and Life Safety

  • Calculate occupant load for each use area from floor area and density factors, then convert to required egress width and capacity.

  • Determine required number of exits, exit remoteness, and maximum travel distance for a described single-story layout.

  • Verify door assembly requirements including swing direction, clear width, panic or fire-exit hardware, and re-entry provisions.

  • Check stairway, handrail, guard, and landing dimensions against the written criteria for the occupancy involved.

  • Apply the egress provisions that change for assembly and high-hazard occupancies, including aisle and seating rules.

Your checkpoint

Five occupant-load and egress-capacity problems solved with calculations shown and no reference material, scoring at least 4 of 5 correct.

Week 4

Hazardous Materials and Special Processes

  • Classify a hazardous material by physical and health hazard class and determine the maximum allowable quantity permitted in a control area.

  • Distinguish control areas, storage cabinets, and cutoff or separated rooms, and state the conditions under which each approach is permitted.

  • Apply separation, ventilation, spill control, and detection requirements to a described flammable-liquid storage or dispensing room.

  • Identify the ignition-control and protection requirements for dipping and coating, spray finishing, and combustible dust-producing operations.

  • State the documentation a reviewer should require for a hazardous operation before approving the submittal.

Your checkpoint

A one-page hazardous-materials decision flowchart running from material classification through control-area limits to required protection features, with each branch traceable to a stated rule.

Week 5

Plan Review Fundamentals and Code Administration

  • Sequence the plan review process from submittal through approval and describe the reviewer's authority and stop points at each stage.

  • Distinguish the roles of the code, the referenced standard, and the manufacturer's listing, and state which governs when requirements conflict.

  • Apply the equivalency, alternate-means, and variance processes to a described noncompliant design and document the justification.

  • Assign occupancy classification and resolve mixed-occupancy arrangements, including accessory and separated versus nonseseparated uses, for a described building.

  • List the inspection, testing, and maintenance records a reviewer should require before accepting a system as complete.

Your checkpoint

A 20-item pre-approval review checklist organized by discipline, with each item written as a verifiable yes/no question.

Week 6

Building Construction and Fire Resistance & Fire Protection, Detection, and Suppression Systems

  • Reconcile passive fire-resistance requirements with active detection and suppression design for the same building description.

  • Identify each point where a suppression or detection system earns a credit that reduces construction, separation, or egress requirements, and state the limit of that credit.

  • Recalculate egress capacity and travel distance where a sprinkler credit applies to a described layout.

  • Resolve three described buildings where passive and active provisions appear to conflict, and justify the governing requirement.

Your checkpoint

A one-page passive-versus-active trade-off summary plus three fully worked examples showing how the credit changes the calculated requirement.

Week 7

Plan Review Fundamentals and Code Administration & Building Construction and Fire Resistance & Means of Egress and Life Safety & Fire Protection, Detection, and Suppression Systems & Hazardous Materials and Special Processes

  • Complete a 100-question timed practice set covering all five domains and record the score.

  • Categorize every missed item by domain and by root cause (code recall, calculation error, misread item, or wrong method).

  • Re-drill the two weakest subareas identified by the error log until each is answered correctly on twenty consecutive items.

  • Assemble a single-page formula and reference sheet covering occupant load, egress width, travel distance, control-area quantities, and sprinkler spacing.

Your checkpoint

A scored 100-question practice exam with an error log showing accuracy by domain and a written root cause for every miss.

Week 8

Plan Review Fundamentals and Code Administration & Building Construction and Fire Resistance & Means of Egress and Life Safety & Fire Protection, Detection, and Suppression Systems & Hazardous Materials and Special Processes

  • Complete two timed 50-question mock exams under exam conditions, scoring at least 80% on each.

  • Navigate the code and referenced standards to locate a cited requirement within two minutes for twenty randomly chosen topics.

  • Review the error log from weeks 4 through 7 and close every recurring miss with a written correction note.

  • Rehearse the formula sheet from memory until all conversions and density factors are reproduced without reference.

Your checkpoint

Two completed timed mock exams at 80% or better, accompanied by a one-page final review sheet and a closed error log.

Milestones

Week 2: Reproduce the construction matrix and the hazard decision table from memory; both must be at least 90% accurate before starting week 3.

Week 3: Solve five occupant-load and egress-capacity problems cold at 4 of 5 correct or better.

Week 4: Score 70% or better on a 25-question self-written mixed quiz across domains 2, 3, 4, and 5, with every miss logged by domain and cause.

Week 6: Ten of ten sprinkler-spacing and obstruction items and ten of ten control-area quantity items answered correctly in a written drill.

Week 7: Practice exam complete with domain-level accuracy recorded; no domain below 65% before entering final review.

Week 8: Two timed mock exams at 80% or better, and any cited requirement located in the code within two minutes for twenty of twenty topics.